Building work price list: Waterjet Cutting 60 x 60 cm (Mitred Edge)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What waterjet mitre cutting is
A mitred edge is an angled cut along the edge of a tile, usually at about 45°. Two tiles cut this way meet on an external corner like the corner of a picture frame. The corner then looks as if it were made from a single piece and needs no metal or plastic tile trim. Some tilers and suppliers also call it a "jolly" edge.
A waterjet is a stream of water at very high pressure with fine abrasive grit mixed into it. It cuts the tile "cold". Unlike a diamond blade, it does not heat the material or subject it to impact. When set up correctly it leaves fewer chips in the glaze. The machine must, however, be able to cut at an angle. A standard waterjet cuts square, and a bevel needs a tilting cutting head. Before ordering, check that the cutting workshop actually does mitred edges and not only straight and shaped cuts.
Where a mitred edge works and what to decide before cutting
It is mostly requested for wall corners in bathrooms, shower niches, window reveals and sills, kitchen splashbacks and stairs. It looks clean and modern, especially with plain-coloured tiles and stone-effect porcelain, where the pattern runs continuously around the corner. It works well on niches, around mirrors, on bath panels and on external corners inside a shower, where the corner is easy to wipe clean. It does have weaker points:
- Durability: a mitred corner is more vulnerable than one protected by a metal trim. At a bathroom doorway or in a hallway it will chip over time from vacuum cleaners, furniture or suitcases. In such places a trim is usually the better choice.
- Colour at the edge: with tiles whose colour is only in the glaze and whose body underneath is a different colour, a light line may show along the edge. With full-body (through-coloured) tiles this problem is much smaller.
- Stairs and floor edges: a stair nosing takes heavy loads and a mitred corner chips easily there. If a mitre is used on a step anyway, it is combined with a slightly rounded edge. A purpose-made stair tile or a stair nosing profile with an anti-slip finish is usually the safer option.
Before ordering, be clear about the following:
- Which corners will be mitred and which can simply be finished with a trim.
- Whether the corner is square. If the corner is not at a right angle, a precisely cut edge will not sit properly and the joint will be wider in some places and narrower in others. It is better to straighten the wall before measuring starts.
- How the pattern should run around the corner. With marble or wood-effect tiles, decide whether the veining should continue around the corner and choose the pieces accordingly.
- Waterproofing in the shower. On niches and corners in the wet zone, tanking must be completed under the tiles, including the corners. A mitred edge changes nothing here - water is stopped by the waterproofing layer, not by the grout joint.
How mitre cutting is carried out step by step
- Measuring: the tiler measures the corners on site and decides which tiles and which edges will be cut. The actual corner is measured, not the drawing.
- Marking: each tile is marked to show the face side and the edge that goes into the corner. With patterned tiles, the continuation of the veining is also worked out.
- Transport: the tiles are taken to the cutting workshop, or the tiler orders the cutting directly.
- Cutting: the machine cuts the tile to the exact size and bevels the edge. In practice the angle is often set slightly over 45°, with a small back-cut. The tiles then touch at their face edges and there is room for adhesive behind, so the corner closes up better. The edge is usually not left razor sharp - a narrow strip of the face is kept, because a sharp point chips easily.
- Finishing the edge: where needed, the cut edge is lightly honed so it does not feel sharp.
- Checking and return to site: the pieces are inspected for chips, packed and returned to site.
- Fixing: the tiler fixes the tiles with full adhesive coverage using a flexible adhesive, so that both mitred edges meet in a straight line and the corner joint is even over its full height.
- Grouting and sealing: the narrow joint on the external corner is filled with grout, leaving no voids. In a bathroom, internal corners and the joints between tiles and the bath, shower tray or floor are not filled with rigid grout but with a flexible sanitary silicone, because these joints move.
Mitred edges are usually part of a wider tiling job - more on the trade as a whole can be found under tiling services.
Waterjet cutting for the 60 x 60 cm format
The 60 x 60 cm format is easy to work with. One person can carry a tile and place it on the machine bed, and the tiles fit in an ordinary car in their original boxes. A damaged piece is easier to replace if there are spares from the same batch. Fixing these tiles is covered under tiling and paving installation up to 60 cm.
On a tall corner, however, the edge is made up of several tiles stacked above each other. Each one must line up exactly with the one below, otherwise small differences in angle add up and the corner will not be straight. That is why all pieces for one corner must have the same angle and the same width of face strip. Thin tiles are more brittle, so the bevel cut needs to be set up more carefully. Larger formats are separate jobs with their own transport and handling demands - see large format 60 x 120 cm wall and floor tiles and large format tile and slab installation up to 120 x 260 cm.
Price of waterjet mitre cutting
The guide labour price is €5.90 per linear metre. You pay for linear metres of mitred edge, not for the tiled area. The total therefore rises mainly with the length and number of cut edges. Some cutting workshops charge a surcharge or a minimum charge per piece when there are many short pieces.
- Length of cuts and number of pieces: one corner running the height of a wall means two edges, so the length adds up quickly. With many short pieces, for example on niches, the work takes longer, because every piece has to be loaded and set up separately.
- Hardness and thickness of the material: ceramic is cut differently from natural stone. Hard, thick tiles cut more slowly, which noticeably lengthens the job.
- Complexity of shape: whether it is just a straight mitre, or also cut-outs, curves or holes for taps and mixers. Shaped cuts are normally charged separately.
- Honing and edge finishing: light honing or rounding of the edge is extra work.
- Accuracy of the brief: if the tiler supplies clear dimensions and marked edges, time and mistakes are saved. A vague brief leads to corrections and sometimes to another cut.
- Transport between site and workshop: usually not included in the cutting price.
When comparing quotes, ask whether the price per linear metre covers only the bevel cut, or also cutting to size, honing the edge and transport.
What makes the work easier and what slows it down
Much of the time is lost on organisation and waiting, not on the cutting itself. It helps if the customer or tiler has the following ready:
- all tiles on site in good time, with spares from the same production batch, so there is no waiting for a delivery if a piece is damaged,
- finished, straightened walls and corners before measuring, so nothing has to be measured twice,
- a written brief for the cutting workshop with dimensions, number of pieces and marked edges, for example with a marker on the back of each tile,
- the original boxes or boards for transport, so the tiles are not carried loose,
- a booked slot at the cutting workshop, as there is often a queue and otherwise the tiler is left waiting with a half-finished job.
The work is slowed down when the decision to use a mitred edge is only made during tiling. The unfinished corner then waits while the tiles are taken away, cut and brought back.
Typical mistakes and how they show up later
Inaccurate measuring. The cut is made to the drawing, not to the actual corner. The tiles then do not close up and a tapered joint is left in the corner, which has to be filled with a thick line of grout.
Wrong side. The edge is bevelled on the wrong face or the wrong edge. With patterned tiles, the design does not continue around the corner. The piece cannot be used.
Edge too sharp. A completely sharp corner chips during fixing or at the first knock. A chip on a corner is visible from a distance and difficult to repair.
Cut at exactly 45° without a back-cut. The edges meet at the back and a gap is left at the front, which has to be filled with grout.
Poor substrate and fixing. Without a flat wall and full-coverage fixing with a flexible adhesive, the corner may move and the joint will crack.
Rigid grout in a moving joint. Grout in an internal corner or next to the shower tray cracks over time, moisture gets behind the tiles, and dark joints, mould or loose tiles follow.
How to check the cut tiles and the finished corner
Inspect the cut pieces as soon as they arrive, before fixing. Check the finished corner when the whole job is handed over.
- The tiles are the size specified and are cut on the correct edge.
- The angle is the same along the whole length and the edge is not wavy.
- There are no chips or cracks on the face side.
- The edge is not sharp to the touch, or has been lightly honed.
- No distracting strip of a different body colour shows on the edge.
- In the finished corner the tiles meet evenly over the full height and the pieces above each other line up.
- The corner joint is narrow, straight and well filled.
- With patterned tiles, the design continues around the corner.
- In the shower, the joints at the tray and the internal corners are filled with flexible silicone without gaps.
- A tile does not sound hollow when tapped, which would indicate insufficient adhesive behind it.
Frequently asked questions
The guide price is €5.90 per linear metre. The final amount depends on the material, number of pieces, shaped cut-outs, edge honing and transport.
Yes. Tilers also cut mitres on bridge saws or table saws with a tilting blade, or on dedicated edge-bevelling machines. A waterjet is mainly an advantage with hard tiles, larger quantities and when combined with shaped cut-outs.
No. This is usually arranged by the tiler, who knows the dimensions and can mark the edges. If you take them yourself, agree the exact brief with the tiler beforehand.
The safest way is to have one piece bevelled and look at the edge in daylight. If a different shade of body shows on it, it is better to choose a trim in a matching colour or a full-body tile.
Not with a waterjet, which only cuts loose tiles. On the wall, an edge can be bevelled afterwards by hand with an angle grinder and a guide rail, but the result tends to be less accurate and chipping is likely. If the corner needs to look clean, the corner tiles are carefully removed and replaced with newly cut pieces.
As a rough guide, allow one or two extra pieces per corner and one piece for a test cut. With patterned tiles, where pieces are selected by their design, the allowance is usually larger. Buy the spares straight away from the same production batch, as it may not be available later.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.