Building work price list: Natural Stone, Artificial Stone, or Klinker Brick Cladding
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
Stone cladding and brick slips for facades and interiors: when they suit
This is a thin decorative layer bonded to a wall, plinth, fireplace or chimney breast. It sits within the wider range of tiling services, but it has its own rules. People choose it when renovating a facade, to protect a plinth from rain splashback, or to add character to a feature wall or fireplace surround indoors. Cladding only looks good and lasts if the substrate is properly prepared, the right adhesive is used and the joints are filled carefully.
There are three groups of material. They look similar but behave differently.
Natural stone is sawn or split from rock such as granite, slate, sandstone or limestone. It is heavy, every piece is different and, if chosen correctly, it lasts outdoors for decades. Not every stone is frost resistant, though. Sandstone is porous and gets dirty quickly without a sealer. Marble is better suited to interiors, because it loses its polish outside over time. Before buying, check with the supplier that the stone is frost resistant.
Artificial stone (also called manufactured or cast stone) is made by casting into moulds that closely imitate real stone. Concrete-based pieces can be used inside and out. Gypsum-based pieces are lighter and easier to work with, but they belong only in dry interiors, not in bathrooms or on facades. The advantages of artificial stone are lower weight, consistent sizes and easier cutting.
Brick slips (clinker slips) are thin slices of fired clay that look like brickwork. They absorb very little water, are frost resistant and easy to maintain. They are often used on facades, plinths, chimneys and in industrial-style interiors. Matching corner pieces are available, so a corner looks like real laid brickwork.
One thing is often overestimated: thin cladding does practically nothing to insulate a wall. The layer is too thin to reduce heat loss noticeably, so it is no substitute for insulation. If the aim is lower heating bills, deal with insulation and treat the cladding as protection and decoration.
What to decide before the installer starts
With stone cladding, many things cannot be changed once the first courses are on the wall. It pays to settle them in advance.
- Material to suit the location: on facades and plinths use only frost-resistant stone, concrete-based artificial stone or brick slips. Gypsum-based artificial stone belongs only in a dry room.
- Weight and substrate: on plasterboard and on an insulated facade, the weight of the cladding is decisive. Brick slips and thin artificial stone weigh roughly 15 to 30 kg/m², while split natural stone is considerably heavier, often 40 kg/m² or more. The exact weight is given by the manufacturer or supplier. Not every external wall insulation system can carry heavy stone. The system manufacturer specifies which cladding and what weight are permitted and whether additional mechanical fixings are required. In that case lighter artificial stone or brick slips are usually the more sensible choice.
- Joints: whether the cladding will be pointed or laid dry with tight joints, and how wide and what colour the joints will be. Joint colour changes the final appearance considerably, with brick slips sometimes more than the colour of the slips themselves.
- Corners: whether corner pieces will be bought or corners will be built up with alternating overlaps. Corner pieces must be ordered together with the flat pieces.
- Edges and terminations: where the cladding stops at ground level, at the roof, at windows and at render, whether trim profiles will be used and how the window sills will be handled.
- Quantity of material: add a cutting allowance to the area, usually 5 to 10 % for regular slips and more for irregular natural stone and walls with many openings. Keep a few pieces back for later repairs. It is sensible to buy the full quantity at once so the colour matches.
- Permissions: if the appearance of a house facade is to change, check the Planning Portal or ask the local planning authority beforehand. Residential permitted development rights only apply to houses, and they can be removed in certain areas by Article 4 Directions. In a conservation area or on a listed building, additional consent may be needed. In a block of flats the facade is usually a shared part of the building, so do not alter it without the agreement of the freeholder or managing agent.
How to finish plinth cladding at ground level
For a plinth, decide in advance how ground moisture will be dealt with. Waterproofing goes on the substrate behind the cladding and continues below ground level. On an insulated house, extruded polystyrene (XPS) plinth insulation is used below ground and in the plinth zone, not standard facade polystyrene. The cladding itself must never end directly in the soil. The bottom edge is usually finished a little above ground or above a gravel strip, often on a starter track or base profile, and the gap is sealed with a flexible sealant. A gravel strip around the house drains rainwater and reduces splashback onto the plinth. If the ground, a path or a gravel strip around the house is being altered, coordinate it with the cladding so that the final ground level is known before the bottom course is fixed.
How the cladding work proceeds step by step
- Checking and preparing the substrate. The installer removes loose render, dust and unsound paint. In homes built before 2000, have suspect materials tested before drilling or removing them. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. Flatness is checked and larger irregularities are levelled. The substrate must be sound, clean and dry.
- Priming and waterproofing. An absorbent substrate is primed. On a plinth exposed to ground moisture, a waterproofing layer is essential.
- Setting out. The pieces are first laid out on the ground and mixed from several boxes so that no colour bands appear on the wall. A horizontal line and the corner positions are marked.
- Bonding. Adhesive is applied with a notched trowel to the wall and, outdoors, also to the back of each piece. This combined method is called back-buttering and prevents voids where water could freeze. On facades a flexible frost-resistant adhesive classified to BS EN 12004 (e.g. C2) is used, and for heavy stone an adhesive designed for large and heavy elements, similar to the products used for large format tiles of 60 x 120 cm. On taller areas the cladding is built up in stages, so the weight of the upper courses does not load the lower ones before the adhesive has set.
- Cutting and corners. Pieces are cut around windows, doors and switches. Corners are formed with corner pieces or alternating overlaps so that no cut edge is visible.
- Movement joints. On large areas and where different materials meet, a movement joint is left and later filled with a flexible sealant, not mortar.
- Pointing. Once the adhesive has cured, usually after about a day and longer if the manufacturer states so, the joints are filled. The pointing mortar must be suitable for exterior use and for the material, for example a grout classified to BS EN 13888 (e.g. CG2). With brick slips and stone, joints are often filled with a pointing bag and finished with a pointing iron, so the face gets as little mortar on it as possible.
- Cleaning and protection. Mortar residue is cleaned off before it dries. Natural stone and some types of artificial stone are sealed according to the manufacturer's recommendation.
What the price of stone and brick slip cladding depends on
The guide price for labour is €59.00 per m². An actual quote can differ considerably, because with stone cladding the effort varies more from wall to wall than with ordinary tiling.
- Interior or facade: the biggest price difference is usually between a wall in a room that can be reached from a stepladder and a facade that needs scaffolding, frost-resistant materials and work planned around the weather.
- Type and shape of material: regular brick slips and artificial stone strips are the quickest to lay, comparable in pace to standard tiling with formats up to 60 cm. Irregular natural stone laid like a mosaic, where every piece has to be selected and trimmed, often takes twice as long as regular strips on the same wall.
- Weight of the stone: heavy pieces require special adhesive, slower progress and sometimes additional mechanical fixings.
- Condition of the substrate: sound, flat render only needs cleaning and priming. A poor substrate that first has to be repaired, levelled or dried out is separate extra work.
- Complexity of the surface: a flat continuous wall without windows is the simplest. Many corners, reveals and cut-outs around windows, doors and switches add noticeably to the work, and reveals are sometimes priced separately per running metre.
- Pointing: cladding with joints means an additional working step. Narrow, deep joints in irregular stone are slow to fill.
- Height and access: scaffolding adds hire and erection costs as well as a slower pace of work at height.
- Insulated facade: the system specified by the insulation manufacturer may mean a more expensive adhesive and extra fixings.
- Additional work: plinth waterproofing, sealing, fitting trim profiles and filling movement joints are either listed as separate items in the quote or included in the price per m². Check this when comparing quotes.
How to prepare the site so the work goes quickly
Apart from the wall itself, the way the site is prepared affects how the work goes.
- Materials on site in time: the full quantity of cladding, corner pieces, adhesive and pointing mortar is delivered before work starts. If material is topped up during the job, there is a risk of a different batch colour and of downtime.
- Clear space by the wall: indoors, the area around the wall is cleared and there is floor space to lay out and mix the pieces. Outdoors, a clear strip around the house without stacked timber or tools.
- Water and electricity: the installer needs a socket for the mixer and saw and access to water for mixing and cleaning.
- Related work finished: windows and sills fitted, electrical installation complete with back boxes in their final position, the fire or stove insert installed for a fireplace, and for a plinth the landscaping finished or at least the final ground level known.
- A schedule with slack: outdoor work is only done on mild, dry days. Rain, frost or heat interrupt the work, so it is best not to schedule the facade tightly before other trades.
- Clear decisions: joint colour and width, how corners and edges are finished. Decisions made during the work slow it down.
Typical mistakes and how they show up later
Spot bonding only (dabs of adhesive)
Voids remain behind the cladding and water gets in. Frost expands it and gradually pushes the cladding off. This shows as a hollow sound when tapped and later as falling pieces.
Ordinary interior adhesive on a facade or plinth
The adhesive cannot cope with frost and movement of the substrate, and the cladding starts to come loose after a few winters.
Plinth without waterproofing and cladding taken down to the ground
Water rises into the cladding, white salt efflorescence appears on the surface, joints crumble and pieces may spall in frost.
Gypsum-based artificial stone in a damp room
Gypsum absorbs moisture, softens, stains and can grow mould.
Working in unsuitable weather
In direct sun, in frost or just before rain, adhesive and mortar do not cure properly. The suitable temperature range given by adhesive manufacturers is usually roughly 5 to 25 °C. The result is cracked joints and weak bond.
Pieces from one box fixed side by side
The wall looks patchy or banded, and the only fix is to take it off and re-lay it.
Dried mortar residue on the face
It is almost impossible to remove from porous stone and remains as grey stains.
Missing movement joints
The cladding itself is not always to blame. If a movement joint is missing on a large area or where different materials meet, cracks appear in the joints or the cladding comes loose in strips.
Heavy stone on external wall insulation without the system manufacturer's approval
The insulation system can deform under the weight and the cladding can come away together with the insulation layer. The repair is then very extensive. Heavy, large elements need a suitable substrate in any case, just as with large format slabs of 120 x 260 cm.
DIY guide: artificial stone on an interior wall
Cladding one living room wall or a fireplace surround with lightweight artificial stone, up to a height reachable from a stable stepladder, is a manageable DIY job. Facades, plinths with waterproofing and work from scaffolding are better left to a professional. Around a fireplace, keep the clearances from the firebox stated in the fireplace manufacturer's instructions and use a heat-resistant adhesive. If there are electrical cables in the wall, sockets and switches should only be moved by a qualified electrician.
- Check that the wall is sound, dry and flat, and remove loose plaster.
- On plasterboard, check with the manufacturer what weight of cladding the construction can carry.
- Prime the wall and let it dry according to the instructions.
- Lay the strips out on the floor and mix them from several boxes.
- Use a spirit level to draw a horizontal line for the first course.
- Mix the adhesive according to the instructions and apply it with a notched trowel only to an area that can be clad before it skins over.
- Press the strips on with a slight twist and keep checking the plane.
- Cut strips with an angle grinder and a diamond blade, wearing safety glasses, a dust mask and ear defenders.
- Wipe adhesive off the face straight away with a damp sponge.
- Once the adhesive has cured, fill the joints and finish them with a pointing iron.
- If the stone manufacturer recommends it, treat the surface with a sealer once the joints have cured.
How to inspect the finished cladding
Cladding is best inspected in daylight and also viewed from the side, where unevenness shows up best. On a facade, inspect it before the scaffolding comes down, while every spot is easy to reach.
- courses are level and the wall is flat when viewed from the side, with no protruding pieces,
- there is no hollow sound when tapped, which would indicate voids behind the cladding,
- colours and shapes are evenly distributed, without bands or patches,
- joints are full, of even depth and free of cracks,
- corners are clean, with no visible cuts,
- pieces around windows, sills and switches are cut accurately,
- on the plinth there is waterproofing behind the cladding and the cladding does not end directly in the soil,
- movement joints are filled with flexible sealant,
- no dried adhesive or mortar residue remains on the surface,
- spare pieces from the same delivery have been left behind,
- the names of the adhesive, pointing mortar and sealer used have been handed over for any future repairs.
Frequently asked questions
The guide price for labour is €59.00 per m². The final amount is increased by irregular natural stone, a complex surface with many corners and reveals, substrate repairs, scaffolding and additional work such as plinth waterproofing or sealing.
Yes, if the plaster or render is sound, well bonded and dry. Brittle or flaking plaster must be removed, otherwise the cladding will come off together with it. Wallpaper never belongs under cladding. Old paint may only stay if it is firmly bonded to the substrate, which the installer checks with an adhesion test, and after priming according to the adhesive manufacturer's instructions. Unsound paint must be removed.
A plinth suffers from moisture, frost and splashback. Brick slips or frost-resistant natural or concrete-based artificial stone are suitable. More important than the material, however, are waterproofing and the right adhesive.
In a dry interior and with lightweight artificial stone, the adhesive recommended by the cladding manufacturer for the substrate is sufficient. Facades and plinths need a flexible frost-resistant adhesive for exterior use. Heavy natural stone requires an adhesive for large and heavy elements, and pale marble and some stones need a white adhesive so the edges are not discoloured. On an insulated facade, the adhesive specified by the insulation system manufacturer is decisive.
For porous stone such as sandstone or limestone, yes - a sealer protects it from water and dirt. Brick slips usually do not need sealing. For artificial stone, follow the manufacturer's recommendation.
One installer can manage roughly 4 to 8 m² a day on a flat wall with regular strips, but often only 2 to 4 m² with irregular natural stone and a complex area around windows. Substrate preparation and waiting times must be added to the total: pointing can usually start at least one day after fixing, later in cold and damp weather, and sealing only once the joints have cured. Exact times are given on the packaging by the adhesive and mortar manufacturer.
It depends on the notch size of the trowel, how uneven the back of the cladding is and whether back-buttering is used. For thin strips with back-buttering, allow roughly 5 to 8 kg of dry mix per m², and more for thick irregular stone. The exact consumption is stated by the adhesive manufacturer.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.