Building work price list: Installation of Mitred Tile Edges (Jolly Edges)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What a mitred edge is and where it is used
For a mitred edge, the tiler cuts the edge of the tile from the back at roughly 45 degrees and then polishes it. Two tiles prepared this way are placed together so that they meet at the face. No metal or plastic trim shows on the corner, only a clean line of tiling and a fine joint.
Homeowners most often ask for it on bathroom corners, around shower recesses, on window reveals, on built-in niches and on the ends of kitchen splashbacks. It is an additional item to wall tiling and the tiler does it as part of the tiling itself. An overview of related work is available under tiling services.
Mitred edge or trim: what to decide in advance
A mitred edge looks refined, but it does not suit every location. A metal or plastic trim protects the corner, while a mitred edge only closes it off visually. A sharp ceramic corner is more vulnerable to a heavy knock than an aluminium profile.
- A mitred edge suits places where a clean look matters and the corner does not take frequent knocks: reveals, niches, shower shelves, bathroom tiling corners.
- A trim is more practical in busy areas: hallways, corners that furniture or pushchairs are moved past, stairs and public spaces.
The material matters a great deal. On a glazed tile with a white or reddish body (biscuit), the mitred edge will show a strip of a different colour. Through-body (full-body) porcelain gives better results, because the cut is the same colour as the surface. Glass mosaic and very thin tiles are poorly suited to mitring.
Before the tiler starts, it is worth being clear on the following points:
- which corners will be mitred and which will have a trim, ideally pointed out on site. A change of mind during tiling can mean redoing tiles that are already fixed.
- which tile you are buying: choose it partly by how the cut edge looks. It helps to look at the edge of a tile in the showroom or to ask the tiler for a test cut.
- how much extra material: some tiles crack during cutting, so a reserve from the same batch is needed. If replacement tiles come from a different batch, the cut and the shade may differ.
- which grout: the colour should match the rest of the tiling. In showers, epoxy grout is often chosen because it absorbs practically no water and stains less easily.
- whether a pattern or veining must continue round the corner, because this affects the setting out of the whole wall, not just the corner.
Method: how a mitred edge is made step by step
The work looks simple, but tenths of a millimetre decide the result. The usual sequence is:
- Checking the corner and the substrate: the wall corner must be straight and square. If the plaster on the corner is wavy or runs out of plumb, the tiles will not meet along their full length and a gap will open. The corner is therefore checked first with a spirit level and a square and made good where necessary. The substrate must be sound, dry and free of dust, and waterproofed (tanked) in wet areas.
- Cutting the bevel: a wet tile saw with a tilting table and a diamond blade is used, or a dedicated mitring machine. The cut is made from the back of the tile.
- Leaving a land on the face: the edge is not cut to a knife edge. A thin strip, roughly 1 to 2 mm depending on the material, is left on the face so that the glaze does not chip.
- Fine-tuning the angle: the angle between the face of the tile and the cut is made slightly less than 45 degrees, so a little more material is removed from the back. The tiles then touch at the face and leave space for adhesive behind. How this is set on the table scale depends on the saw, so the tiler checks it with a test cut and by putting two pieces together.
- Polishing the edge: the bevelled edge is worked with a diamond hand pad or a fine disc. This removes small chips and slightly rounds the sharp arris, so nobody cuts themselves on the corner and it stands up better to knocks.
- Fixing: the tiles are fixed with flexible tile adhesive, usually with back-buttering, meaning adhesive on both the wall and the back of the tile, so that no voids remain behind the corner. Both sides of the corner are fixed at the same time or straight after each other, checking continuously that they sit flush.
- Cleaning the joint: excess adhesive is removed from the joint straight away to leave room for grout.
- Grouting: once the adhesive has cured in line with the manufacturer's instructions, the fine joint on the corner is filled with grout.
- Cleaning and checking: the surface is washed and the corner is checked along its full height.
Price of a mitred edge per running metre and what affects it
Mitred edges are priced in running metres of corner length, not in square metres of tiling. The effort, and therefore the labour price, depends mainly on the number and type of corners, not on the tiled area. The guide labour price is €59.00 per running metre.
When measuring, bear in mind that one corner means two mitred tiles. A window with reveals has an edge on both sides and often across the top, and a shower niche has edges all the way round. When comparing quotes, it is worth asking whether the length of the finished corner is counted or the length of each mitred edge separately.
The price goes up with the following factors:
- Large-format tiles: a long cut is harder to keep straight and the tile is harder to handle. More of these pieces are damaged during cutting, which adds both labour and material. Typical examples are large-format wall and floor tiles of 60 x 120 cm and large-format slabs of 120 x 260 cm.
- Hard porcelain and thick tiles: they cut more slowly and wear the blade more, so each running metre takes longer.
- An out-of-true wall corner: it must be straightened first. If this means larger plaster repairs by a plasterer, it is usually a separate item and also adds drying time.
- Short pieces and internal details: in niches, three edges meet at one point and every piece must be cut precisely. A metre of such detail is far more labour-intensive than a metre of a straight, tall corner.
- Pattern or veining: it has to continue round the corner, so the tiler selects and cuts pieces to suit the pattern rather than using whichever is to hand.
- Height and access: corners high up near the ceiling or behind a bath take longer, working from a ladder or in a cramped position.
By contrast, a straight corner, a medium format, as with tiling with formats up to 60 cm, and through-body material make the work much easier. The mitred edge price normally does not include the tiles, adhesive and grout, nor the tiling of the wall area. These are usually separate items.
What makes the work easier and what slows it down
- Space for cutting: a wet saw sprays water and slurry. It helps if the tiler has a dedicated area, ideally a balcony, patio or a room with a floor that can take water, with a socket nearby. Cutting in a furnished home on carpet slows the work down.
- All materials on site before starting: tiles including the reserve, adhesive and grout. Waiting for a delivery halfway through breaks the workflow and the corner then gets finished in several stages.
- Completed waterproofing: in a shower, the tanking must be carried over the corners and dried as specified by the manufacturer. If it is still curing, the tiler cannot start.
- Access to corners: a bath, shower tray or radiator fitted before tiling can get in the way when fixing and checking the corner.
- Curing time: grouting can only start once the adhesive has cured. Expecting the bathroom to be finished in one day forces the tiler to rush, and that shows in the accuracy of the corner.
Typical mistakes and how they show later
Edge cut to a knife edge
If no land is left on the face, the glaze chips during cutting or later when knocked. The chips appear gradually, often during ordinary cleaning or when hit by a shower head.
Void behind the corner
If the adhesive does not fill the space behind the joint, the corner cracks when knocked. It sounds hollow when tapped, and in a shower water can get into the void through the joint.
Bevel at exactly 45 degrees with no allowance
This only works with a perfectly square corner and an identical adhesive bed on both sides. A small deviation in the wall or the adhesive thickness is enough for the tiles to touch at the back and leave an open joint at the front. Grout hides it only temporarily and crumbles out over time.
Wall corner not checked
The joint opens and closes along its height. On a tall bathroom corner this is visible at a normal glance.
Adhesive left in the joint
Only a thin layer of grout remains, which crumbles out, and the different colour of the adhesive shows through on the corner.
Unsuitable material
A glazed tile with a light body and a dark surface shows a light line on the corner that cannot be hidden afterwards.
Mitred edge in the wrong place
On a busy hallway corner it will chip sooner or later.
How to check the finished work
Look at the corner from the side in good light and run a finger along its full height. At handover it is worth checking that:
- the joint on the corner is the same width along its full height,
- both tiles sit flush and neither stands proud of the other,
- there are no chips, cracks or sharp spots on the edge,
- the mitred edge does not show a distractingly different colour,
- the corner does not sound hollow when tapped gently,
- the grout is filled completely and matches the rest of the tiling,
- the pattern or veining continues round the corner,
- in niches the edges meet cleanly at the corners, without being filled out with grout,
- the surface is clean, with no adhesive or grout residue,
- you have been left a few tiles from the same batch for future repairs.
DIY guide: a mitred edge on a short corner
If you have tiling experience and access to a wet saw with a tilting table, you can try a mitred edge on a niche or a reveal, for example. The method is the same as for the tiler above. For a DIYer the most important points are:
- Wear safety glasses, gloves and ear protection, power the saw from a socket protected by an RCD and keep the cable away from water.
- Make the first cuts on offcuts, not on the tiles intended for the corner.
- Adjust the table setting in small steps until two test pieces held together at a right angle touch at the face along their full length with a small gap at the back.
- Only then cut the real pieces and compare each one with the test piece.
- When fixing, prepare both sides of the corner at once so they can be aligned before the adhesive starts to set.
For large formats, hard porcelain or visible corners in living areas, it is worth leaving the work to a tiler.
Frequently asked questions
As a guide, €59.00 per running metre. The final price depends on the hardness and format of the tiles, how true the corner is, the number of short pieces and details such as niches, and whether a pattern must continue round the corner.
In practice, no. The edge is made on the tiles before fixing. On a corner already tiled with a trim, the end tiles would have to be removed and replaced, which is only worthwhile if you have the same tile from the same batch.
Not entirely. Through-body porcelain is the best choice. On glazed tiles the colour of the body shows on the edge, and with glass mosaic or very thin tiles the cut is problematic.
Generally not. A trim protects the corner mechanically, while a mitred edge is more vulnerable to knocks. In quiet areas, however, it lasts for many years without problems.
Yes, shower niches and shelves are among the typical locations. What matters most is that no void remains behind the corner and that the joint is fully filled.
An experienced tiler can do it with a guide jig, but the result is less precise than on a saw with a tilting table. For visible corners a machine is the better choice.
Small chips can be repaired with a ceramic repair filler in the colour of the tile. For larger damage the tile must be carefully removed and replaced, which is why it is worth keeping a few tiles from the same batch.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.