Building work price list: Diagonal Tile Laying
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What diagonal tiling is and when it is worth it
With diagonal tiling, the grout lines run across the room at an angle rather than parallel to the walls. The floor looks livelier, and a small room often appears larger. Diagonal layouts are popular in hallways, kitchens, bathrooms and on patios, where the owner wants something less ordinary. Within the wider range of tiling services, it is one of the slower jobs. Setting out needs more precise measuring, and almost every tile along the walls has to be cut.
A diagonal layout works best with medium-sized square tiles. In a narrow hallway or small bathroom it breaks up the "tunnel" effect, and the space feels wider. It also suits rooms where the walls are not quite square, as is common in older houses. Parallel grout lines would show the error along the full length of the wall. With a diagonal layout, an out-of-square wall shows differently: the triangles along it are not all the same size. A small deviation is hardly noticeable, a larger one is. For this reason, the walls are checked for square before the layout is planned.
It is less suitable for large format tiles. The cuts are large, there is a lot of waste and the tiles are harder to handle. For large format 60 x 120 cm wall and floor tiles, a straight layout is usually the more practical choice. Rectangular tiles can also be laid diagonally, but it is worth picturing the finished pattern in advance.
What to agree before the tiler starts
With a diagonal layout, many decisions are made before the first tile goes down. Once the tiles are fixed, the layout cannot be changed without taking them up.
- Where the floor is seen from most: usually the doorway. The setting-out lines are positioned so that the tiles there are symmetrical and of a good size, not thin slivers.
- Junction with the next room: if the floor meets another floor, consider whether two different directions at the threshold will look awkward. Agree exactly where the threshold or transition strip will go.
- Border: the diagonal can run all the way to the walls, or it can be framed by a border of tiles laid parallel to the walls. A border looks neat, but next to a crooked wall it tends to highlight the problem, because a straight border beside an uneven wall shows the difference. The solution is a narrow strip of cut tiles between the border and the wall to take up the deviation. A border means more cuts and more careful planning.
- Skirting: cuts along the walls are usually hidden by the skirting. Where there will be no skirting, for example by the bath, the shower tray or under kitchen units, the cuts must be clean and accurate.
- Grout joint width: rectified tiles with precisely ground edges allow a narrow joint of about 2 mm. With non-rectified tiles a joint of at least 3 mm is usually chosen to absorb small differences in tile size. The spacers are chosen accordingly.
- Quantity of tiles: the allowance for a diagonal layout is usually around 10 to 15 %, more in small rooms with many corners. Buy all the tiles at once, from a single batch.
- Waterproofing: in bathrooms and showers it goes under the tiles. It needs to be clear in advance who applies it and when, because it must dry before tiling.
- Underfloor heating: before tiling, the screed must have been through its commissioning heat-up cycle as instructed by the heating supplier, and a flexible adhesive suitable for heated floors must be used. The direction of the layout makes no difference to this.
In a block of flats, it is worth checking with the managing agent or management company beforehand when noisy work, such as cutting and removing old tiles, is allowed. Simply replacing a floor covering does not usually need any approval. If the tiling is part of a larger refurbishment, check the procedure with local building control. This work does not involve the structure or the communal parts of the building. If it did, it would require consent and a qualified professional.
How diagonal tiles are laid, step by step
- Preparing the subfloor: the base must be solid, dry, clean and flat. A diagonal layout does not hide an uneven subfloor. On angled lines every lip between tiles is even more visible. Flatness is checked with a long straightedge. As a guide, a deviation of about 2 mm over 2 m is tolerated for floor tiles, and large formats need an even flatter base. Larger hollows are filled with levelling compound, and cracks and holes are repaired.
- Priming: a primer is applied to the clean subfloor so the adhesive bonds well.
- Waterproofing: in bathrooms and showers it is applied and left to dry according to the manufacturer.
- Setting out: this is the most important step. The tiler finds the centre of the room and marks two lines at right angles to each other, at 45° to the main wall. The right angle is checked, for example with the 3-4-5 method: measure 3 units along one line and 4 along the other, and the diagonal between the two points must be exactly 5 units. In a longer room larger multiples are used, such as 60, 80 and 100 cm.
- Dry laying: the tiles are laid out without adhesive to see how the cuts fall at the walls and doorways. The lines are then adjusted so that the tiles at the doorway and in visible areas are symmetrical and of a good size.
- Spreading the adhesive: the adhesive is spread with a notched trowel over a small area at a time, so it grips the tile before it starts to skin. The notch size depends on the tile format: around 6 to 8 mm for smaller tiles, usually 10 to 12 mm for tiles around 60 cm. For larger tiles, in bathrooms, outdoors and on underfloor heating, the back of the tile is also buttered (the combined method) so that no voids remain underneath.
- Laying from the centre outwards: the first tile is placed exactly on the lines, pressed into the adhesive and checked with a spirit level. Work then continues outwards. Spacers or a tile levelling system keep the joints even. The angle and level are checked throughout.
- Checking coverage: at the start and then from time to time, the tiler lifts a freshly laid tile and looks at the back. The adhesive should cover most of the surface, and in bathrooms and outdoors practically all of it. If there are dry patches, the trowel or method is changed.
- Cutting the edges: triangles and trapezoids are created along the walls. They are cut with a tile cutter or a saw with a diamond blade. A perimeter movement gap is left at the walls and in corners.
- Movement joints: larger floors are divided into bays by movement joints according to the adhesive and tile manufacturers' instructions. Indoors, bays are roughly up to 6 to 8 m per side, smaller on underfloor heating, and outdoors usually around 3 to 4 m per side. If the subfloor has its own movement joints, they must be carried through the tiling in the same place. A tile must never be bonded across a movement joint in the base.
- Grouting: once the adhesive has set, usually after one day according to the manufacturer, the joints are filled with grout.
- Sealing and cleaning: perimeter and field movement joints are filled with flexible sealant. The floor is cleaned of grout residue, and the joints or natural stone are sealed if needed.
Laying the floor in a smaller bathroom usually takes an experienced tiler one to two days, with grouting and sealant on another day once the adhesive has set. Levelling and waterproofing add drying days before tiling can start.
What affects the price
The guide price for labour is €45.00 per m². It applies to tiles up to 60 cm. Compared with straight tile and paving installation up to 60 cm in the same format, a diagonal layout usually takes about 20 to 30 % longer, and more in small rooms with many corners. The final price depends mainly on the following:
- Room shape: every corner, recess, boxed-in pipe or door frame means more angled cuts. A rectangular room with no obstacles is the simplest. A small bathroom with a bath, WC and pipework takes considerably more work per m².
- Floor area: in a small room, edge cuts make up a large share of the floor, so the time per m² rises. On a large floor, fast laying of whole tiles counts for more.
- Tile size and material: formats around 60 cm, hard porcelain or natural stone are slower to cut, and the backs must also be buttered. Small tiles, on the other hand, mean more pieces and more joints.
- Condition of the subfloor: levelling, repairs and waterproofing add work and drying time. They are often charged as separate items.
- Pattern and combinations: alternating colours, inserts or a parallel border with a make-up strip need more careful planning and extra cuts.
- Removing old tiles: breaking out, removing the rubble and repairing the base afterwards increase the scope of work.
- Material quantity: a larger tile allowance increases the cost of materials, not labour.
When comparing quotes, check whether the tiler includes subfloor preparation, priming, grouting and sealant, or charges for them separately.
What makes the work easier and what slows it down
- All tiles on site: when all the tiles are delivered before work starts, the tiler does not have to stop and wait for a top-up order.
- A decided layout: if you know where the floor is seen from most, whether you want a border and where the threshold will be, the tiler does not have to wait for your decision during dry laying.
- An empty room: a diagonal layout starts from the centre, so the whole room must be clear, not just part of it.
- Previous work finished: pipes and cables in the floor, door frames, screed and waterproofing should be complete and dry. A wet screed delays the start by days.
- Water, power and a cutting area: the site needs access to water and electricity and space for the cutter, ideally away from living areas because of the dust.
- Suitable temperature: in the cold, adhesive and grout cure more slowly. In winter it is sensible to heat the room.
- Agreed hours for noisy work: in a block of flats, restrictions on cutting can extend the job by several days.
Typical mistakes and how they show later
Starting from a wall. The layout then runs from one wall instead of the centre. On the opposite side and at the doorway the cuts end up uneven and often thin. If the wall is not straight, its deviation is carried through the whole pattern.
Not checking the angle. A small error at the start becomes visible after a few rows. The grout lines no longer run straight and the pattern looks crooked, especially when looking along the lines.
Too little adhesive under the tile. Voids later sound hollow, and the tile can crack under load, for example under a chair leg or when something heavy is dropped. On a patio, water gets into the voids, freezes in winter and lifts or breaks the tile.
Missing movement joints. Tiles pushed tight to the wall or laid without movement joints can lift or crack as the temperature changes. The risk is even greater on underfloor heating and outdoors. If the tiling bridges a movement joint in the base, it usually cracks right above it.
Tiling over underfloor heating without a heat-up cycle. The screed is still shrinking and moves when first heated. Tiles then come loose or crack.
Joints too narrow for non-rectified tiles. Small differences in tile size have nowhere to go, the joints are uneven and the lines wander.
A straight border tight against a crooked wall. Without a make-up strip beside the border, the changing gap to the wall is visible, and the frame highlights the crookedness instead of looking neat.
Too small an allowance. When the tiles run out, a new delivery may be a slightly different shade. There are also no spares left for replacing a cracked tile later.
An uneven subfloor. Lips between tiles show more on angled lines than in a straight layout. Raised edges chip over time and collect dirt.
Thin slivers at the doorway. Small cut pieces break off easily and look cheap. They happen when the dry lay is skipped.
How to check the finished floor
- the grout joints are the same width and run in straight diagonal lines,
- the angle of the pattern is the same throughout the room and lines up with the threshold,
- cuts at the doorway and in visible areas are symmetrical and clean,
- the triangles along each wall are roughly the same size and do not shrink towards the corner,
- there are no lips, and adjacent tile edges are level,
- there are no larger gaps under a long straightedge,
- tiles do not sound hollow when tapped, which would indicate a void underneath,
- the perimeter gap is filled with flexible sealant, and on larger floors the movement joint bays are respected,
- around the bath, shower tray and door frames the cuts are accurate, even where no skirting will cover them,
- the surface is clean, with no adhesive or grout residue,
- a few spare tiles from the same batch have been left for you.
DIY guide: what to watch out for with a diagonal layout
If you have experience of straight tiling and plenty of patience, you can lay a diagonal floor yourself following the steps above. Measuring and cutting the edges take the most time. Compared with straight tiling, it helps to:
- start in a smaller room with medium-sized square tiles, not a large format,
- mark the lines with a chalk line or laser and check the right angle with the 3-4-5 method, not by eye,
- dry lay at least the row at the doorway and along the longest wall before fixing,
- lift one of the first tiles to check that the back is covered with adhesive,
- measure and cut the edge triangles one at a time, because against a crooked wall they are not all the same size,
- use a cutter with a cutting length long enough for the tile diagonal,
- wear safety glasses and ear defenders when cutting, and a dust mask when cutting dry,
- check flatness and the straightness of the diagonal joints with a straightedge every few rows.
Frequently asked questions
The guide price is €45.00 per m² for tiles up to 60 cm. Compared with a straight layout, the work usually takes 20 to 30 % longer. It costs most in small rooms with many corners, with hard materials and where the subfloor needs levelling.
The allowance is usually around 10 to 15 %, more in small rooms with many corners. The exact amount depends on the room shape and tile size. A tiler can estimate it from the dimensions and floor plan.
Yes, if the tiles are small or medium-sized, for example squares of around 30 cm. It makes the space look wider. However, expect more cuts around the bath, WC and pipes, and more waste than on a large floor.
To some extent, yes. A small deviation in the walls disappears in an angled pattern. With a larger deviation, the triangles along the wall will visibly get smaller. A diagonal layout does not hide an uneven subfloor, which must be levelled before tiling.
Yes, but it suits spacious rooms better. In a small space the tiles would be mostly triangles and the pattern would not have room to show. For very large slabs, such as large format tile and slab installation (120 x 260 cm), a diagonal layout is rarely practical.
Yes, if the tiles are frost-resistant and the base falls to drain water away. The adhesive and grout must be suitable for external use. The tiles are fully bedded with no voids, with adhesive applied to both the base and the back of the tile. Smaller movement joint bays are needed, because outdoors the tiling expands and contracts more.
It depends on the adhesive and grout, and the details are on the packaging. Light foot traffic is usually possible once the adhesive has set, with full loads and heavy furniture only after the materials have fully cured.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.