Price list 2026 · Europe

Grouting Wall and Floor Tiles

Grouting fills the joints between wall and floor tiles. A guide price for labour only is €1.90 per m². Mosaic, epoxy grout and regrouting old joints usually cost considerably more.

Updated 09/2026·11 min read·20 price list items
Standard labour price
€1.90/ m²
Indicative range
€1.52 - €2.47
60 m² flat
€285.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Grouting Wall and Floor Tiles

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Groutingm²€1.90 / m²m²enter quantity-
Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What grouting is and when it is needed

Grouting is the last wet stage of tiling. It is needed for every new wall or floor tiling job. It is also needed when old grout is cracked, crumbling or so discoloured that it can no longer be cleaned. Grout lines look like a small detail, but they strongly affect how the surface looks and how well it resists water and dirt.

On new tiling, grouting is part of the tiler's job and is done once the adhesive has cured. It is one stage within the wider range of tiling services. Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight, for example an adhesive classified to BS EN 12004 such as C2 for demanding substrates. On existing tiling, regrouting is a separate job: the old grout is raked out and replaced with new.

Why tiles are not butted tight and what the joint protects

No tile is perfectly accurate in size, and the substrate moves slightly with changes in temperature and humidity. The joint absorbs these differences and also does several other jobs:

  • it keeps water and dirt out, so they do not reach the adhesive and substrate behind the tiles,
  • it closes the surface, so dirt does not collect in the gaps and mould struggles to take hold,
  • it helps spread loads and protects tile edges from chipping,
  • it finishes the look: the grout colour can visually unify the surface or emphasise the tile format.

Standard cementitious grout is not waterproofing. In showers and around baths there must be a waterproof layer, such as a tanking system, behind the tiles. Grout only limits how much water reaches it.

What to decide before tiling starts

Some grout-related decisions can only be made while the tiles are being laid. Once the tiles are fixed, they cannot be changed.

  • Joint width: set during laying with spacers or wedges. Wall tiles usually have narrower joints and floor tiles wider ones. Even precisely cut, so-called rectified tiles are not laid completely tight. Narrow joints need a grout the manufacturer approves for that width. This applies equally to standard tiling and paving up to 60 cm.
  • Colour: the shade on the colour card and on the wall once dry can differ slightly. White and very pale grout on floors gets dirty sooner, while dark grout shows every trace of white lime bloom and any careless cleaning.
  • Type of grout: cementitious, flexible or epoxy, depending on where the tiling is and what it has to withstand. The differences are described in the next section.
  • Quantity: it is worth buying all the grout at once and from one batch, because different batches can vary slightly in shade.
  • Silicone and sealing: agree in advance whether the tiler includes them in the job or prices them separately. Silicone should be colour-matched to the grout.
  • Natural stone and porous tiles: ask whether the surface needs treating before grouting so that coloured grout does not stain the pores.

Which grout to choose

Grouts are divided into cementitious and reaction resin (epoxy) types. The packaging usually shows a class marking to BS EN 13888 that helps with the choice, for example CG2 for a cementitious grout with improved properties.

Cementitious grout

This is used in the vast majority of houses and flats. A basic grout is enough for dry, lightly used areas. For bathrooms, kitchens and floors, a grout with improved water and abrasion resistance (class CG2) is worth using. It is easy to work with and can later be raked out and renewed if needed.

Flexible cementitious grout

Suitable where the substrate moves more: over underfloor heating, on terraces and balconies, with large-format tiles such as XL wall and floor tiles 60×120, or on plasterboard. Thanks to its additives it copes better with temperature swings and small movements without cracking.

Epoxy grout

It is almost non-absorbent, resistant to chemicals and easy to clean. It is chosen for walk-in and wet room showers without a tray, kitchen splashbacks, commercial premises with high hygiene demands and mosaics. It is harder to work with: it sets quickly, is cleaned off by a different method, and residue left to dry on the tiles is very difficult to remove.

Silicone for corners, junctions and movement joints

The junction between wall and floor, internal corners of the tiling and the edges around baths, shower trays and basins are not filled with grout but with flexible sanitary silicone containing a fungicide. At these points the materials move relative to each other and rigid grout would crack sooner or later. Movement joints in floor tiling are also filled with a flexible sealant, for example on larger areas, terraces or above a movement joint in the screed beneath.

How grouting is carried out

  1. Waiting for the adhesive: grouting starts only once the adhesive has cured. With standard adhesives this is usually after one day, with rapid-set adhesives sooner. The exact time is given by the manufacturer.
  2. Cleaning the joints: squeezed-out adhesive, spacers and dust are removed so the joint is the same depth along its whole length. Corners and areas for silicone are left empty.
  3. Dampening: with cementitious grout, porous tiles and joint edges are lightly dampened so they do not draw water out of the grout.
  4. Mixing: the grout is mixed with the exact amount of water stated in the instructions, left to stand and mixed again. Adding water by eye causes colour variation.
  5. Applying: the grout is pressed into the joints with a rubber float, working diagonally across the joints until they are completely full.
  6. First wash: once the grout turns matt and no longer smears when touched, the surface is cleaned with a damp, well wrung-out sponge in circular or diagonal movements. The joints are levelled to the same depth at the same time.
  7. Removing the haze: once dry, a fine grey haze remains on the tiles and is buffed off with a dry cloth.
  8. Silicone and sealing: silicone or flexible sealant is applied to corners, junctions and movement joints. Cementitious grout can be sealed once fully dry.

When regrouting, the old grout is first raked out with a hand tool or a grout removal tool. It must be removed to sufficient depth so that the new grout is not just a thin skin that would soon crumble. Old silicone is also cut out and the surface beneath cleaned of mould and residue.

What affects the cost of grouting

The guide price for labour is €1.90 per m². It applies to a standard area with ordinary cementitious grout. However, the difficulty of grouting varies more than most people expect, and time and price follow from it. The price rises mainly with:

  • mosaic and small formats: one square metre contains many metres of joints, the work is much slower and the price per m² is usually substantially higher than for standard tiles,
  • textured and matt tiles, from which grout residue is harder to wash off,
  • porous tiles and natural stone, which need surface treatment before grouting,
  • contrasting colour, for example dark grout on pale tiles, where every imperfection shows and cleaning has to be more thorough,
  • epoxy grout, which requires quick, precise work in small sections. The material itself is also more expensive,
  • regrouting, where the old grout must first be raked out without damaging the tile edges. Raking out often takes longer than the grouting itself,
  • wide and deep joints, for example with irregular-edged tiles or stone, which use more grout,
  • many corners, reveals, recesses and transitions, where work is slow and done in small sections,
  • small areas, such as a single splashback. Tradespeople often charge a minimum fee for small jobs, because preparation and cleaning take time regardless of area.

By contrast, large formats with narrow straight joints, such as large format tiles and slabs of 120 x 260 cm, and smooth glossy wall tiles are grouted relatively quickly. Siliconing and sealing are often quoted separately, usually per running metre or per m². When comparing quotes, check exactly what the price includes.

How to prepare the room for grouting

Besides the tiling itself, the way the room is prepared and the conditions in it affect how the work goes.

  • Empty room: in a bathroom or kitchen cleared of belongings, rugs and small items, work is quick and nothing gets dirty.
  • Water on site: cleaning uses a lot of clean water that has to be changed often. A working tap nearby shortens the job considerably.
  • Suitable temperature: cementitious grouts are used within the range stated by the manufacturer, typically about 5 to 25 °C, up to 30 °C for some products. In a cold new build the grout sets slowly. In hot weather or on a sun-baked terrace it sets too fast and is hard to clean off.
  • No draughts or direct sun: otherwise the surface dries before it can be cleaned.
  • Underfloor heating switched off: the heating stays off during grouting and shortly after, so the grout does not dry too quickly.
  • Access to other rooms: freshly grouted floors must not be walked on, so it helps to plan access to the rest of the home in advance.
  • Sanitaryware firmly fixed: the bath or shower tray should be fixed in place before siliconing. When regrouting in an occupied home, expect the bathroom to be out of use for several days.

Common grouting mistakes and how they show later

Grouting too early

The adhesive has not cured and the tiles can move. Moisture from the adhesive also migrates into the joint and causes dark patches.

Adhesive left in the joints

The grout is too thin in places and cracks. Hairline cracks appear after a few weeks or months and let water get behind the tiles.

Too much water when mixing or cleaning

This causes pale patches and soft joints that crumble even under normal brushing.

Cleaning along the joints

The sponge drags grout out and leaves uneven channels in which dirt and water later collect.

Grout in corners and around the bath

The corner will eventually crack along its full length. In a shower, water then gets in and mould appears behind the tiles.

Grouted-over movement joint

The floor tiling has no room to move when the substrate moves, so the grout cracks and sometimes the tiles themselves.

Grout from different batches

If bags with different batch numbers are not blended together, bands or patches of a different shade appear on the surface. The only remedy is regrouting.

Dried grout residue on tiles

Especially with epoxy and matt tiles, it is hard and sometimes impossible to remove. The floor then looks permanently grey or blotchy.

How to check finished grout at handover

  • joints are full along their whole length, with no holes, pinholes or crumbling spots,
  • depth and width are roughly consistent throughout,
  • colour is even, without pale or dark patches,
  • no haze or dried grout residue is left on the tiles, which is easiest to see in raking light,
  • corners, edges of the bath and basin, and movement joints are filled with flexible silicone or sealant that is smooth, continuous and bonded on both sides,
  • joints do not crumble when tapped or walked on,
  • the bath, taps and surrounding surfaces are free of grout,
  • information has been given on when the room can be used and whether sealing is recommended.

DIY guide: grouting a small area

Grouting a bathroom wall or a kitchen splashback is manageable as a DIY job with some patience. The basic method is the same as in the section on how grouting is carried out. Cementitious grout is the right choice for a beginner. Epoxy grouts and large floor areas are better left to an experienced tiler. In addition to the method above, keep these steps in mind:

  1. Check on the adhesive packaging that the required waiting time before grouting has passed.
  2. Cover the bath, shower tray, taps and waste.
  3. Test in an inconspicuous spot how long the grout takes to turn matt at the current temperature.
  4. Mix only a small amount that can be used in time, let it stand and mix again.
  5. Work in sections of about one to two square metres and clean each section before moving on to the next.
  6. Smooth the joints with the edge of the sponge or a rounded jointing tool so they are the same depth.
  7. Do not pour leftover grout or dirty water into the basin or toilet, as it will harden in the pipes.
  8. Do not use the shower or load the floor before the manufacturer allows.

Wear gloves when working with cementitious grout, because cement dries and irritates the skin.

Frequently asked questions

As a guide, €1.90 per m² for labour on a standard area with cementitious grout. Mosaic, epoxy, textured tiles and regrouting with raking out usually cost considerably more per m². Silicone and sealing are often charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.