Tiled Skirting / Wall Base Installation - Interior

Tiled skirting is a narrow strip of tile fixed to the bottom of a wall just above the floor. As a guide it costs €6.50 per running metre. The price depends mainly on corners and cut-outs, how flat the wall and floor are, and how hard the tile is.

Updated 09/2026·10 min read·20 price list items
Standard labour price
€6.50/ lm
Indicative range
€5.20 - €8.45
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Tiled Skirting / Wall Base Installation - Interior

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Skirting from tileslm€6.50 / lmlmenter quantity-
Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

Tiled skirting or a skirting board: when it is worth it

Tiled skirting protects the wall from knocks by the vacuum cleaner, mop, shoes and chairs, and it closes the gap between floor and wall. It does the same job as a skirting board, but it is made of tile. It is usually fitted together with new floor tiles as part of wider tiling services. It can also be added later if spare tiles from the same floor are available.

The bottom ten centimetres or so of a wall get dirty and scuffed faster than anywhere else in the home. Paint there soon looks grey, and a timber skirting board can swell over time with wet cleaning. Tile is hard, can be wiped with a damp cloth and takes knocks without scratching. Porcelain absorbs almost no water. Standard ceramic floor tile absorbs little. Ceramic wall tiles absorb more water and are not suitable for skirting at floor level. Tiled skirting is most worthwhile where floors are washed often or where people walk in outdoor shoes:

  • hallways and entrances, where mud and wet are walked in,
  • kitchens, where the floor is cleaned often and sometimes has grease on it,
  • bathrooms, WCs and utility rooms, where the walls are not fully tiled,
  • plant rooms, garages or workshops, where the wall may also be hit by a trolley or tools.

Tiled skirting belongs with tiled floors. It is not normally used with floating floors - the reason is explained in the questions at the end of the article.

What to decide before the tiler arrives

With skirting, the details matter. Most of them are best settled when the tiles are bought, not on the day of fitting.

Cut skirting or ready-made skirting pieces

Skirting cut from the floor tiles. Strips of the required height are cut from full tiles. The advantage is that colour and batch match the floor exactly and the joints can line up. The drawback is the cut edge: the clean factory edge should always go at the top and the cut edge at the bottom, against the floor. With hard porcelain it is good practice for the tiler to lightly arris the top edges so they are not sharp.

Ready-made skirting pieces. Some tile ranges include matching skirting with a finished top edge, sometimes rounded or bevelled. They look neater and save cutting, but they need to be ordered with the floor tiles, as they may not be available in the same shade later.

Same tile or a contrast

Skirting in the same tile as the floor looks clean and unobtrusive. If a contrast is wanted, a different tile can be used, but any misalignment of joints will be more noticeable.

External and internal corners

External corners are either mitred (each piece cut at about 45 degrees so they meet) or finished with a tile trim. A mitre looks more refined, a trim is more resistant to chipping. On hallway corners that are often caught by a pushchair or vacuum cleaner, a trim is usually the more practical choice. Internal corners are simply butted together.

Order of work

Skirting is among the last tiling jobs. Decide in advance where the kitchen units will go, whether door frames are being replaced and where radiator pipes will run. Skirting fitted before the kitchen or new door frames often has to be redone.

How high tiled skirting should be and how many tiles to buy

Tiled skirting is usually about six to ten centimetres high. Lower skirting looks lighter, higher skirting protects the wall better in hallways and entrances.

For cut skirting, choose a height that allows several strips to be cut from one tile without much waste. Each cut loses a little material to the width of the blade. Only the two outer strips from a tile have a factory edge, the middle strips are cut on both sides. These can only be used where the top edge is ground smooth, or in places that will not be seen. That is why extra tiles are allowed for the skirting, and it pays to buy them at the same time as the floor tiles, from one batch.

Skirting is measured in running metres, meaning the length along the walls. Work it out as the room perimeter minus door openings and any areas without skirting, such as behind kitchen units or under fitted wardrobes.

How the work is done, step by step

  1. Wall preparation: old skirting boards, loose plaster and dust are removed. The paint is checked to make sure it is sound. Flaking paint or wallpaper is scraped back to a firm surface.
  2. Priming: the bottom of the wall is primed as recommended by the adhesive manufacturer and left to dry.
  3. Cutting the strips: strips of the chosen height are cut from the tiles with the factory edge at the top. With porcelain the top edge is lightly smoothed where needed.
  4. Setting out: the pieces are laid out so the skirting joints line up with the floor joints.
  5. Details: mitres for external corners and cut-outs around door frames, thresholds and pipes are prepared.
  6. Fixing: flexible tile adhesive is applied to both the wall and the back of the skirting so no voids are left behind the piece. Each piece is pressed on and packed with wedges to leave a narrow gap above the floor, about two to three millimetres. The skirting follows the floor, not the spirit level.
  7. Cleaning: adhesive squeezed out is removed straight away from the joints and the surface.
  8. Grouting: once the adhesive has set as per the manufacturer's instructions, the vertical joints between pieces are grouted.
  9. Silicone: the joint between skirting and floor is filled with flexible silicone sealant, not grout. Neutral-cure silicone is used with natural stone and sensitive tiles.
  10. Top edge: if needed, the joint between skirting and wall is sealed with paintable acrylic decorator's caulk.

What the price of tiled skirting depends on

The guide price for labour is €6.50 per running metre. Skirting is priced by running metre and number of details, not by area. The cost of a job depends mainly on:

  • number of corners, recesses and door frames: a straight wall goes quickly, every mitre and cut-out takes time. A small bathroom or a broken-up hallway with many doors costs noticeably more per running metre than a long straight wall in a living room,
  • flatness of wall and floor: if the floor undulates or the wall bows, pieces have to be adjusted one by one, which slows the work considerably,
  • hardness and thickness of the tile: every tile is cut with a diamond blade, but porcelain is slower and needs a better blade. Large-format and thick tiles, such as those used for XL wall and floor tiles 60×120 or large format tile and slab installation (120 x 260 cm), take longer to cut and smooth than standard ceramic,
  • condition of the wall: removing old skirting boards, repairing plaster or stripping wallpaper adds to preparation and, if the wall is in poor condition, may be a separate item,
  • obstacles: radiator pipes, kitchen units, door frames and thresholds mean more cut-outs and short pieces,
  • fitting later: when skirting is fitted after the floor, care must be taken not to damage the finished tiles, and the work is slower,
  • small jobs: with only a few metres of skirting, travel, preparation and cleaning are spread over few metres, so the price per running metre tends to be higher.

The cheapest option is skirting fitted straight after tiling and paving installation up to 60 cm, from the same batch of tiles and onto flat, dry plaster. When comparing quotes, ask whether mitres and cut-outs are included in the running-metre price or charged separately, and whether the quote covers labour only or also adhesive, grout, silicone and tile trims.

How to prepare for skirting installation

The tiler works faster and cleaner with the following ready on site:

  • tiles in sufficient quantity and from the same batch as the floor. If tiles run short during the job, work stops,
  • clear access to the walls: furniture moved away from the walls, low cupboards emptied, rugs put away,
  • a finished, dry floor including grouting, so it can be walked and knelt on,
  • agreed details: whether the skirting runs behind the kitchen units, what trim goes on corners, what colour the silicone will be,
  • a place for cutting, ideally a balcony, patio, garden or garage, as cutting tiles creates a lot of dust,
  • access to water and a socket for mixing adhesive and running the tile cutter.

The work takes longer in an occupied home, where ongoing cleaning is needed, and in a block of flats where noisy work is restricted to set hours under the building rules.

Typical mistakes and how they show up later

Cut edge at the top. Even good tiles then look cheap, and the edge chips easily, for example when vacuuming.

Skirting set to a spirit level instead of the floor. If the floor is not perfectly level, widening gaps appear under the skirting and look like a defect.

Spot-fixing with dabs of adhesive. The piece sounds hollow and cracks or falls off at the first knock.

Fixing to dusty paint or wallpaper. The adhesive holds to the paint, but the paint does not hold to the wall. In time the skirting comes away together with a patch of paint.

Grout in the joint at the floor. Floor and wall move slightly differently with temperature changes and loading. Rigid grout in this corner will crack and come away sooner or later. Cleaning water then gets into the crack and dirt collects in it. Flexible silicone accommodates the movement.

Acetoxy silicone on sensitive tiles. On natural stone and some tiles it leaves dark or greasy marks along the joint that cannot be washed off.

Misaligned joints. Skirting joints offset from the floor joints stand out, especially in long hallways, and cannot be corrected afterwards.

Skirting instead of waterproofing. In a bathroom or shower, skirting does not protect the wall from water. If the wall at floor level needs protection, a tanking membrane is applied under the tiles and taken up the wall before fixing. Otherwise moisture will eventually soak into the plaster behind the skirting.

How to check finished tiled skirting

At handover, walk slowly around the whole room and look at the skirting from the side and from above. Check that:

  • the top edge is straight, continuous and free of sharp or chipped spots,
  • the top edge is a factory or smoothed edge throughout, not a raw cut,
  • skirting joints line up with floor joints, at least where visible,
  • pieces do not sound hollow when tapped,
  • external corners meet neatly or are finished with a trim without gaps,
  • the joint at the floor is filled with silicone evenly and without breaks,
  • cut-outs around door frames, pipes and thresholds are clean and sealed,
  • there is no adhesive, grout or silicone left on the tile surface or the wall,
  • the colour of grout and silicone matches the rest of the floor.

Fitting tiled skirting yourself

Skirting is work at floor level, with no electrical or structural work involved, so a competent DIYer can manage it. The method is the same as in the step-by-step section above. You will need a tile cutter or an angle grinder with a diamond blade, flexible tile adhesive, a notched trowel, wedges, grout, silicone and patience at the corners.

  • When cutting, wear safety glasses, a dust mask and ear protection, hold the grinder with both hands, and cut outdoors or in a well-ventilated space.
  • Practise mitres on offcuts first until the corners come out clean.
  • Mix only as much adhesive as can be used within the time stated on the bag.
  • Run the silicone in one continuous bead and tool it straight away, before it starts to skin.

In a block of flats, follow the building rules and the hours for noisy work set by the managing agent or residents' management company.

Frequently asked questions

The guide price for labour is €6.50 per running metre. The final cost depends mainly on the number of corners, mitres and cut-outs, the hardness of the tile, the flatness of wall and floor, and whether old skirting boards need removing or plaster repairing first.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.