Building work price list: Waterjet Cutting (Mitred Edge) - Tile Cut-out
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What a waterjet cut-out is and when it is needed
A waterjet cut-out is the right choice where an ordinary tile cutter or angle grinder is not good enough. Typical examples are a round hole for a tap or waste, a shaped cut-out around a pipe, an opening for a floor drain, a precise notch around a door frame or a decorative shape in a floor tile. The tile goes to a workshop, where the machine cuts it to a drawing with a fine jet of water and abrasive. The result is an accurate opening with a clean edge that chips far less than a hand cut. The tiler then only has to fix it on site. Within tiling services as a whole, this is a specialist step that supports the main fixing work.
Simple straight cuts do not need a waterjet. The tiler can make them on site, as with standard tiling and paving up to 60 cm. The waterjet pays off for shapes, for high accuracy and for expensive material. Typical situations are:
- round and oval openings for pipes, taps, shower riser rails or wastes, which are hard to cut accurately with a core bit,
- cut-outs close to the edge of the tile, where a hand cut could crack the narrow strip of tile left beside the opening,
- large format tiles and thin porcelain, which are sensitive to impact and vibration, for example when fixing 60 x 120 cm wall and floor tiles or large format slabs of 120 x 260 cm,
- natural stone and expensive decorative tiles, where spoiling a piece is not an option,
- decorative shapes, inlays and patterns assembled from several materials.
Why is it gentler on the tile? A waterjet cuts cold and does not press on the material the way a blade does. This puts less stress into the tile and the edge chips less. The risk of damage is not zero, however, especially with very thin pieces or pieces that are already slightly damaged.
Mitred edges and waterjet cutting: what is possible and what is not
A mitred edge (sometimes called a jolly edge) is a tile edge cut at an angle. Two pieces cut this way meet on an external corner without a trim and form a clean corner. A waterjet, however, normally cuts at right angles to the face, so it cannot usually make an angled cut. Mitred edges are generally made with a different technique, mainly on special cutters with a tilting diamond blade. Some workshops also have machines with a tilting head that can cut at an angle.
If corners without trims are wanted, ask the workshop in advance whether it makes mitred edges and on what machine. It is often convenient to order cut-outs and mitres from the same place. If the workshop cannot do it, the alternative is a corner trim, which needs no angled cut.
What to decide before placing the order
The cut-out is made to the dimensions taken to the workshop. Decisions made later cannot be transferred to a finished piece.
- Position of services: pipes, wastes, drains and concealed valve bodies must be fixed in their final position. Every change after cutting means a new piece.
- Tile setting-out: it must be clear where the first row starts, how wide the joints will be and which tile the opening falls in. Sometimes it is worth shifting the setting-out slightly so the opening does not end up right next to an edge.
- What will cover the edge of the opening: a tap rose, pipe collar or drain frame will hide a small inaccuracy. An opening without a cover must fit exactly and its edge stays on show.
- Accuracy in thick material: in thicker porcelain or stone the cut may be slightly tapered, so the opening on the back is a little different from the face. If the opening must fit tightly around a pipe or flange, ask the workshop whether it can compensate for this.
- Corner finish: decide between a mitred edge and a trim while the cut-outs are being ordered.
- Spare pieces: with expensive or imported material it is sensible to send the workshop at least one extra piece from the same batch. Replacements are hard to source and a different batch may differ in shade.
How the cut-out is made, step by step
The process is similar in most workshops:
- Measuring on site: the tiler or plumber measures the exact position of the openings relative to the edges of the future tile and the joints.
- Drawing: the measurements are turned into a sketch or a data file that the machine cuts from. For complex shapes a full-size 1:1 template is sometimes supplied.
- Transport to the workshop: the pieces are labelled and packed so that corners and edges are not knocked off on the way.
- Clamping: the tile is laid on the machine bed and secured so that it cannot move during cutting. It is usually cut face up, because the underside, where the jet exits, tends to have a rougher edge that chips more easily. The face is sometimes protected with film. The workshop decides the exact method according to the material.
- Cutting: a fine jet of water and abrasive cuts through the material along the programmed path. For an opening in the middle of a piece, the jet first pierces the material and then follows the outline. With thicker material the workshop slows the cut or adjusts the settings to keep the edge as square as possible.
- Checking and cleaning: the piece is rinsed and both dimensions and edges are checked. Sharp edges are lightly sanded where needed.
- Handover and fixing: the pieces return to site, are dry-fitted and only then fixed by the tiler.
Waterjet cut-out price per running metre and what affects it
The guide price for labour in the price list is €10.50 per running metre. What is charged is the length of the cut, meaning the perimeter of the shape, not the number of pieces or the tile area. For a round hole the perimeter is roughly 3.14 × the diameter. A 5 cm hole therefore has about 16 cm of cut, and an 11 cm hole for a floor drain about 35 cm. Before comparing quotes, add up how many metres of cut the job comes to in total.
The final cost is also affected by:
- thickness and hardness of the material: thick porcelain or stone cuts more slowly than thin wall tiles, so a metre of cut usually costs more,
- complexity of the outline: many curves, sharp corners and small details slow the machine down to avoid chipping,
- number of openings in one piece: each opening in the middle of a piece needs its own pierce, which some workshops charge separately,
- distance of the opening from the edge: a narrow strip needs more careful cutting and increases the risk of losing the piece,
- tile size: large formats are harder to handle and clamp and need a large enough cutting bed,
- accuracy required: a calibrated opening in thick material that must be square through its full depth is cut more slowly,
- quality of the information supplied: an inaccurate or unclear drawing means extra work preparing the program and a risk of mistakes,
- number of pieces at once: one machine set-up for several identical cut-outs is more efficient than several separate orders,
- mitred edge: if the workshop offers it, it is a different technique and usually a separate item.
Some workshops have a minimum order charge, so one small opening may cost more than the length of cut alone would suggest. The overall budget should also include transport of the tiles to the workshop and back.
How to organise cut-outs so the tiler is not kept waiting
The cutting itself is usually quick. Extra time is mostly lost to organisation and waiting. It helps when:
- all services are fixed and tested before measuring starts,
- all cut-outs for one bathroom or kitchen are measured and ordered together, not one at a time,
- it is clear who measures, who draws and who deals with the workshop, so that dimensions do not get lost between the tiler and the plumber,
- the workshop slot is booked in advance and the tiler includes it in the programme, so a wall is not left half-finished,
- pieces are labelled on the back and packed securely, for example between sheets of cardboard or in the original box,
- someone who knows the job is available to answer workshop queries and check a dimension quickly.
The work takes longer if the services are moved after measuring or if the setting-out is changed at the last minute. The tiler then has to measure again and the workshop has to cut a second time.
Common mistakes and how they show up later
In practice, it is rarely the cut itself that goes wrong, but the information behind it. These situations come up again and again:
Measuring from the wall, not from the tile edge. The opening then does not line up with the joints and the pipe sits off-centre. A rose sometimes hides it, otherwise the piece has to be cut again.
Forgetting the joint width. The cut-out is a few millimetres out. On a single piece this looks minor, but with two openings for a mixer tap the pipes will not go through.
Pipes not in their final position. The plumber moves them after cutting and the finished piece can no longer be used. The only solution is a new cut-out.
Face not marked. The cut-out is made as a mirror image and an asymmetric shape does not fit.
No clearance around the opening. The piece has to be forced over the pipe, may crack during fixing and leaves no room for sealant around the penetration. Water can then get behind the tiling.
Tapered opening in thick material. The opening fits on the face, but is narrower on the back and the piece will not slide over the pipe or flange. This only shows up during fixing.
Strip too narrow at the edge. Even if the cut goes well, the strip can crack in transport, during fixing or later from an impact.
For cut-outs for electrical fittings, such as sockets or switches, the back boxes and connections themselves are a job for a qualified electrician. The tile is simply cut to suit their position.
How to check a finished cut-out
When the pieces come back from the workshop, inspect them before fixing. A fault is much easier to deal with at that stage than on a finished wall.
- the dimensions and positions of the openings match the drawing,
- the edges of the cut-out are clean, without chips or cracks, on both the face and the back,
- in thick material the opening is a similar size on the face and underneath,
- the tile face is not scratched or soiled with abrasive,
- narrow strips at the edge are not cracked,
- the piece can be dry-fitted in place and lines up with the pipes and the joints,
- after fitting there is room around the penetrations for sealant or a rose,
- mitred edges, if ordered, have an even angle and form a clean corner when two pieces are put together,
- the number of pieces and spares matches the order.
DIY guide: how to prepare the information for a cut-out
A waterjet machine is not something anyone has at home, but accurate information can be prepared without one. It saves time and frustration when the piece comes back and has to fit to the millimetre.
- Wait until the plumber has fixed the pipes and wastes in their final position.
- Set out the tiling on the wall or floor and work out which tile the cut-out falls in.
- Choose a fixed reference: the top edge of the last row fixed, the corner of the wall or a setting-out line drawn with a spirit level or laser.
- Measure the distance from the reference to the centre of the pipe, horizontally and vertically, separately.
- Subtract the joint width between the reference and the piece with the cut-out. If there is a full tile in between, subtract its size and the next joint as well. The result is the position of the centre of the opening from the edge of the piece.
- Measure the diameter or outline of the opening and add a small clearance as recommended by the tiler, so that the piece can slide on.
- Draw a simple dimensioned sketch or make a full-size paper template. It is worth holding the template in place to check that the openings line up with the pipes.
- Mark the face, the laying direction and the piece number in pencil on the back of the tile.
- Before handing it to the workshop, compare the drawing with the situation on site once more.
Frequently asked questions
The guide price in the price list is €10.50 per running metre of cut. The perimeter of the cut shape is what counts. The final cost depends on the thickness and hardness of the material, the complexity of the shape, the number of openings and any minimum order charge. Transport of the pieces to the workshop and back is extra.
No. Cutting takes place on a machine in the workshop, so the piece must be cut before fixing. On a finished wall, openings are made with a diamond core bit or an angle grinder.
It depends on how busy the workshop is and the number of pieces. The cutting itself is usually quick; transport and waiting for a free slot take longer. Book a slot in advance so that the tiling work does not stop.
Yes, these materials benefit the most, because the cut is gentle and accurate. For large formats, check that the workshop has a large enough cutting bed.
Usually not, as the edge tends to be smooth. Visible edges are sometimes lightly sanded so they are not sharp. A cut-out hidden under a rose or sealant is normally left as it is.
Ideally the tiler, who knows the setting-out and the joint widths. The plumber should confirm at the time of measuring that the pipes and wastes are in their final position and will not be moved.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.