Building work price list: Split-Face Stone Cladding - (Concrete Fencing, External Plinth/Sill)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Split face stone cladding (fences, plinth) | m² | €49.00 / m² | m² | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What split-face stone cladding is and where it suits
Split-face cladding uses thin stone slips with an uneven, "broken" face, bonded onto a sound substrate. It is usually chosen to cover a bare concrete fence built from hollow formwork blocks, or a damaged and dirty house plinth. The aim is a surface that copes with rain, mud and frost and looks good. A good result depends less on the stone itself than on the substrate, the adhesive and how water is drained away. It is one of several finishes covered under tiling services.
The most common uses are concrete fences, gate piers, garden walls and the house plinth, the lowest part of the facade just above ground level. The plinth takes the most punishment: rain splashes onto it, snow lies against it in winter and de-icing salt reaches it next to paths. Render cracks and gets dirty here over the years. Stone copes with this far better.
Stone does not waterproof the wall. The plinth needs a working damp-proof layer, and water must drain away from it, for example through a gravel border, so that it does not splash back onto the wall. Cladding is a protective and decorative layer, not a substitute for waterproofing. If the plinth is damp, wet patches rise higher up the wall or the render is crumbling, deal with the cause first. Cladding bonded to a wet wall only hides the damp and often makes it worse, because the wall dries out more slowly.
If you live in a block of flats, any change to the plinth or facade should be agreed in advance with the managing agent or freeholder, as it is a shared part of the building. For a fence on a boundary or a significant change to the look of a building, check the Planning Portal before you start. Residential permitted development rights apply only to houses, and listed buildings and conservation areas have stricter rules, so check with your local planning authority what applies in your case. Do not assume that no approval is needed.
What to decide before booking a tradesperson
Most decisions concern materials and details that cannot be changed once the first course is fixed. It pays to settle them before asking for a quote.
Natural or manufactured stone
- Natural split-face stone, for example sandstone, andesite, limestone, travertine or slate. Every piece is different, the colours are lively and the surface weathers well. It is heavier and the pieces vary in thickness, so fixing takes more work.
- Manufactured stone, a pigmented cast concrete product. It is lighter, the pieces are of even thickness and it is easier to lay. The pattern repeats, but good products are hard to tell from natural stone.
For plinths and fences, choose stone that the manufacturer or supplier explicitly describes as frost-resistant and suitable for external use. Soft, porous types, such as some limestones, can flake off in layers near the ground over time due to frost and salt.
Split-face stone differs from flat tiles mainly in its uneven thickness and in being fully back-buttered. If a smooth, modern finish is preferred, compare it with tiling and paving up to 60 cm, large-format 60 x 120 cm wall and floor tiles or large-format slabs of 120 x 260 cm.
Insulated plinth
A plinth is insulated with boards designed for contact with moisture, that is extruded polystyrene (XPS) or plinth-grade EPS, not standard facade polystyrene. The stone is not bonded straight onto the boards. First a base coat with reinforcing mesh is applied, which is standard practice on an insulated plinth. Sometimes the system manufacturer also requires extra mechanical fixings. A lighter stone is usually chosen, and the permitted cladding weight must always be checked with the manufacturer of the insulation system.
Pointed or dry-laid
Pointed cladding has a gap between the pieces filled with pointing mortar. It is more forgiving of inaccuracies and pieces of different sizes sit together well. Dry-laid cladding has minimal joints and looks like a stacked stone wall. The pieces have to be cut more precisely, which takes longer. For pointed cladding, choose the mortar colour in advance, as it changes the overall look considerably.
Corners, fence tops, movement joints and the bottom edge
- Corner pieces: find out whether ready-made corner units exist for the chosen stone. If not, the installer will have to assemble and mitre corners by hand. Corner units are often sold and charged per running metre, not per m².
- Coping on the fence: decide what it will be made of, for example a concrete coping or a stone slab. It must overhang the cladding and have a drip edge so that water does not run down the face of the stone.
- Movement joints: a long concrete fence usually has movement joints that allow the structure to move. The cladding must not bridge them. A joint is left in the cladding at that point and filled with flexible sealant, otherwise the stone will crack there.
- Bottom edge of the plinth: cladding should not be buried in soil without waterproofing. It normally stops slightly above ground level, on an insulated plinth on a base profile or another solid termination. If there is no gravel border around the house, include one in the plan.
Who buys the materials and how much
Agree whether you or the installer will buy the stone, adhesive, pointing mortar and sealer. Order the stone in one go, ideally from a single production batch, with an allowance for cutting waste. For flat areas an allowance of around 5 to 10 % is usual, more for natural stone and where there are many corners and piers. Stone bought later from another batch may differ in shade.
How the cladding is fixed, step by step
- Checking the substrate: the installer checks that the substrate is sound, dry, cohesive and free of dust, old coatings and moss. New concrete must cure sufficiently, usually around four weeks.
- Surface preparation: loose render is hacked off, the surface is cleaned, washed if needed and left to dry. Larger irregularities are levelled. On an insulated plinth a reinforced base coat is applied.
- Bottom edge and movement joints: on a plinth, the waterproofing is checked and the height at which the cladding stops above ground is set, with a base profile fitted if needed. On a fence, the movement joints are marked and must stay open.
- Laying out the stone: the stones are laid out on the ground and mixed from several packs so that no colour bands appear on the wall.
- Setting out the first course: a string line is stretched or a level line drawn from which fixing starts.
- Bonding: a flexible, frost-resistant external adhesive is used, usually class C2 to BS EN 12004, ideally with an S1 deformability rating for stone. The stone is back-buttered: adhesive is spread on the wall and on the back of each piece so that no voids remain. Water collects in voids, freezes in winter and pushes the stone off. Adhesive is only spread over an area the installer can clad within the open time stated by the manufacturer.
- Working from the bottom up: corner pieces go on first, then the main area. Each stone is pressed in with a slight sliding movement and squeezed-out adhesive is removed straight away, before it dries on the face.
- Cutting: pieces at edges, piers and openings are cut with an angle grinder fitted with a diamond blade.
- Pointing: for pointed cladding, once the adhesive has set the joints are filled with a stone pointing mortar. Movement joints are filled with flexible sealant.
- Coping: on a fence, a coping or capping slab with an overhang is fitted on top, otherwise water gets in from above behind the cladding.
- Sealing: once everything is fully dry, a sealer suited to the stone type is applied to reduce water absorption and efflorescence.
How long it takes: fixing on a flat area goes fairly quickly, but daily output drops considerably around piers, corners and with natural stone. Pointing can only be done once the adhesive has set, usually the next day at the earliest, and the adhesive manufacturer gives the exact time. Sealing follows only once the joints are dry, often several days later. Allow several days for the whole job, even for a small area.
What affects the price of split-face stone cladding
The guide labour price is €49.00 per m². It applies to a typical flat area with a prepared substrate. The final figure depends on these factors:
- Condition of the substrate: hacking off old render, levelling or dealing with a damp plinth adds work before the first stone goes on. With a poor substrate, preparation can take as long as the fixing itself and often raises the price by tens of percent.
- Complexity of the surface: a flat, sound area without windows or projections goes quickly. Every corner, pier, opening or step means a lot of cutting. A fence with closely spaced piers or a plinth with many returns takes noticeably longer than one continuous wall.
- Corner pieces: with ready-made corner units, corners are quick and neat. Mitring and assembling corners by hand is among the most labour-intensive parts of the job.
- Type of stone: natural stone of varying thickness needs more adhesive, levelling and patience than manufactured stone of even thickness, so the labour involved is usually higher.
- Laying method: dry-laid cladding needs more precise cutting, while pointed cladding adds a separate pointing stage.
- Height and area: a low fence can be clad from the ground. A taller wall or a plinth running higher up the facade needs scaffolding or a mobile tower. On small areas the price per m² tends to be higher, because preparation and travel are spread over fewer metres.
- Insulated plinth: the reinforced base coat and any mechanical fixings are extra work compared with bonding onto concrete.
- Additional work: fitting copings, a gravel border, sealing movement joints, applying sealer and removing waste are usually separate items. When comparing quotes, check what is included. Before you hand over hacked-off render or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
What makes the job easier and what slows it down
Apart from the area itself, a lot depends on how well the site is prepared. It helps when:
- there is a clear strip around the fence or plinth at least wide enough for a person with a bucket and scaffolding. A dense hedge, a flower bed right against the wall or a parked car slows the work, so trim, move or relocate them beforehand,
- materials are delivered in one go and stored on level ground close to the work, protected from rain and frost,
- the installer has access to water for mixing and cleaning tools and electricity for the grinder and mixer,
- the joint colour, coping type and bottom edge detail are decided in advance so that work does not stop while choices are made,
- the work is scheduled for mild weather. Rain, frost, heat or strong direct sun slow the work down or force it to stop.
Adhesive is usually used at temperatures of roughly +5 to +25 °C. The exact conditions are given by the manufacturer on the bag.
Typical mistakes and how they show up later
Adhesive applied in a few dabs
Spot-bonding leaves voids under the stone. Water collects in them, freezes in winter and the cladding falls off after a few winters. Such pieces sound hollow when tapped.
Interior adhesive
A cheaper adhesive without frost resistance and flexibility cannot cope with frost or movement in the substrate. Over time whole areas of stone come loose.
Poor substrate or poor fixing conditions
Bonding onto a dusty, wet or frozen substrate, or in direct sun. In sun and wind the adhesive quickly skins over and the stone is set after the open time has run out. The stone then only holds on the surface and falls off together with a layer of dust or weathered render.
Fence without a coping
Water runs into the top joint and behind the cladding. The top courses are the first to come loose and white efflorescence appears on the stone.
Bridged movement joints
If cladding is fixed across a movement joint in the fence, the structure tears the stone apart at that point as it moves. A vertical crack appears through the stone and the joints.
Plinth cladding taken down into the soil
The cladding draws moisture from the ground, the wall behind it cannot dry out and damp may even appear inside the house.
Stones not mixed
If one pack is laid after another, bands of different colour appear on the wall, which cannot be put right without relaying.
Unsuitable stone or cladding too heavy for insulation
Soft, porous stone near the ground or beside a gritted path flakes off in layers after a few winters. Heavy stone on an insulated plinth without the system manufacturer's approval can come away together with the base coat or the insulation boards.
DIY guide: cladding a low fence
A low concrete fence or garden wall can be clad by a capable DIYer with a little patience and an angle grinder with a diamond blade. The method is the same as the professional one described above, and these points matter most for a beginner:
- Get protective equipment ready: safety glasses, a dust mask and ear defenders when cutting stone, gloves when mixing adhesive.
- Start on a less visible side of the fence, where you can get your hand in and any inaccuracy will not stand out.
- Mix adhesive in small batches, only as much as can be used within the time stated on the bag.
- Work in the shade or in the morning and evening, not in direct sun.
- After the first few pieces, pull one stone off and look at the back. The adhesive should cover the whole surface, otherwise add more adhesive or change the trowel.
- Offer up pieces to be cut, mark them in pencil and only then cut, rather than guessing.
- At the end of the day, cover the cladding if rain is likely, and do not put any load on fresh cladding.
An insulated house plinth or one with damp problems is better left to a professional, because a mistake there shows across the whole wall. Call in a professional also for tall walls that need scaffolding and for retaining walls whose stability is uncertain.
How to check the finished cladding
Inspect the cladding in daylight, ideally also after rain, when you can see where the water runs. When signing off the work, check that:
- the stones do not sound hollow when tapped,
- no piece moves or has cracked edges,
- colours and shapes are evenly mixed without obvious colour bands,
- courses are level and the cladding does not wander to either side,
- joints are full, without cracks and without adhesive residue on the stone face,
- the movement joints in the fence have been left open and filled with flexible sealant,
- corners are neat and the corner pieces line up with the main area,
- the fence has a coping with an overhang and water runs clear of the cladding,
- the bottom edge of the plinth stops above ground level and water drains away from the house,
- surroundings, paths and windows are not soiled with adhesive or mortar,
- you have the names of the adhesive, pointing mortar and sealer used from the installer.
Frequently asked questions
The guide price is €49.00 per m² for labour. The price rises with a poor substrate, the number of corners and piers, natural stone of varying thickness and the need for scaffolding. Copings, a gravel border and sealing are usually separate items.
It depends on the complexity of the surface and the type of stone. Between fixing and pointing the adhesive has to set, usually at least until the next day, and sealing follows only once everything is dry, often several days later. Even a small fence therefore takes several days.
Yes, if the manufacturer of the insulation system allows it and the plinth is insulated with a material intended for plinths. The stone is bonded onto a reinforced base coat, not directly onto the insulation boards.
For porous types such as sandstone or limestone, yes. A sealer reduces water absorption and white efflorescence. For dense stones and some manufactured products it is not essential, and the manufacturer's recommendation should be followed.
This is efflorescence, salts carried out by water from the substrate, adhesive or mortar. A dry spell and cleaning with a product made for stone usually help. If the marks keep returning, water is getting into the structure from above or from the ground.
Only if the temperature does not fall below the limit stated by the adhesive manufacturer, usually around +5 °C, including overnight after fixing. The substrate must not be wet or frozen. In frosty weather it is wiser to wait.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.