Building work price list: Installation of Large Format Porcelain Tiles (over 60cm)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| XL format wall/floor tiling 60×120 | m² | €55.00 / m² | m² | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What large format porcelain tiling involves and when to choose it
This group covers sizes such as 60 × 120 cm, 80 × 80 cm, 120 × 120 cm and larger slabs. It sits within the wider range of tiling services. Homeowners choose these sizes when renovating a bathroom, kitchen, hallway or living room and want a continuous surface with few grout lines. They look best on large, flat areas with few corners. They also work in small rooms with lots of corners, but expect more cuts and more careful planning. Laying them looks simple, but with large tiles every inaccuracy shows far more than with standard tiles.
With small tiles, the grout joint can hide a minor unevenness in the substrate. A large tile does not adapt. It sits like a board. If there is a bump or a dip beneath it, a void remains underneath or an edge stands proud of the neighbouring tile. That is why the substrate and the fixing technique decide the result. For standard sizes, see tiling and paving installation up to 60 cm.
Large formats fall roughly into three groups:
- porcelain over 60 cm is the general term for tiles with at least one side longer than 60 cm, for example 60 × 120, 80 × 80 or 120 × 120 cm,
- 60 × 120 cm is the most common large format in homes. Two people with suction lifters can handle it, and it sets out well in a typical bathroom. More detail is in the page on large format tile and slab installation 60 × 120 cm,
- oversized slabs (for example 120 × 260 cm) are a separate category. They need handling frames, a larger crew and an almost perfectly flat substrate, as described under large format tile and slab installation (120 x 260 cm).
Thickness matters too. Standard porcelain is usually around 9 to 10 mm. Thin slabs of around 6 mm are lighter but break more easily during handling. Thick outdoor slabs of around 20 mm are often laid on pedestals or on gravel, which is a different method from adhesive fixing indoors. The surface finish also plays a role. Polished porcelain shows every height difference at the edges. Matt and textured finishes are more forgiving and are a safer choice for bathroom floors or patios, as they are less slippery.
What to decide before ordering
With large formats, many decisions are made before the first tile goes down. A change during the job often means new cuts, waste and lost time.
- Size and finish: matt or anti-slip surfaces suit bathrooms and hallways, while polished porcelain belongs rather in a living room. A polished finish demands an even flatter substrate.
- Rectified or non-rectified tiles: rectified tiles have ground edges and allow a narrow joint. Non-rectified tiles need a wider joint and are used less often in large formats.
- Setting out: agree where the tiler starts, where the joint lines run and where the cut pieces end up. With large tiles, a thin sliver at a wall or doorway is far more noticeable than with small tiles.
- Wall-to-floor alignment: if the wall joints are to continue onto the floor, this must be known in advance so both surfaces can be planned together. This planning and cutting is more demanding, which shows in both time and cost.
- Offset or grid pattern: when rows are offset, large tiles are usually laid with an offset of no more than one third, because they tend to have a slight bow. With a half offset, as used for small tiles, the edges of neighbouring tiles would meet at different heights, and even a levelling system would not fully correct it.
- Pattern matching: with marble or stone-effect tiles, decide whether the veining should flow continuously. The tiles then have to be sorted in advance and arranged like a jigsaw.
- Quantity: large formats produce more waste, as offcuts often cannot be reused elsewhere. Discuss the cutting allowance with the tiler based on the actual setting out, and keep a few spare tiles for later repairs. It makes sense to buy the full quantity at once from a single batch.
- Sanitaryware: the bath, shower tray or linear drain, wall-hung WC and basin should be chosen before tiling starts, as their position and size determine the setting out.
- Underfloor heating: if there is underfloor heating, check that both the tiles and the adhesive are suitable for it.
How the installation works step by step
- Survey and plan: the tiler measures the room and prepares a layout plan - tile direction, joint lines and placement of cuts so that no thin slivers end up at the walls.
- Substrate check: flatness and strength are checked with a long straightedge, and any unevenness is corrected with a levelling compound or self-levelling screed.
- Priming and tanking: the substrate is cleaned of dust and primed. In bathrooms and showers a tanking system is applied, including tapes in the corners and around drains.
- Adhesive: flexible adhesive is mixed with a slow-speed paddle mixer and spread with a notched trowel on both the substrate and the back of the tile. This method is known as back-buttering, or buttering and floating.
- Laying the tile: the tile is carried on suction lifters, placed, pressed down and levelled using a tile levelling system with wedges or clips.
- Coverage check: the tiler lifts a tile from time to time to check that the adhesive covers the whole back.
- Curing and grouting: the adhesive is left to cure according to the manufacturer, then the levelling clips are removed and the surface is grouted.
- Movement joints and cleaning: movement joints around the perimeter and in internal corners are filled with a flexible sealant and the surface is cleaned.
On walls, the first row is often supported on a temporary batten so that the heavy tile does not slip before the adhesive sets.
Substrate, adhesive and joints: what the whole job depends on
The substrate must be sound, dry and flat. Manufacturers of large formats usually require a flatness tolerance of around 2 mm over a 2 m straightedge, and some are stricter. A screed must be sufficiently cured. With anhydrite (calcium sulphate) screeds, the residual moisture is also measured and the surface laitance is sanded off.
The adhesive should be a flexible cementitious adhesive classified to BS EN 12004. On walls, class C2TE S1 or S2 is usually chosen. The letter T means reduced slip, so a heavy tile does not slide down after placing. On floors, where the tile does not slip, C2E S1 is commonly used, and S2 is preferred for the largest formats and over underfloor heating. The S rating means the bond can tolerate small substrate movements and temperature changes. For large formats the notched trowel usually has a notch of around 10 to 12 mm. The aim is almost full coverage of the tile back without voids.
Joints should be at least as wide as the tile manufacturer recommends. For rectified tiles this is usually 2 mm or more. The grout should be classified to BS EN 13888, for example CG2. A zero joint is not a good idea, as the surface needs room for slight movement. In addition to normal joints, movement joints are needed around the perimeter of the room, at thresholds between rooms and in large areas.
What about underfloor heating? Porcelain works well with it because it conducts heat well. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid, and the screed should be taken through its initial heating cycle before tiling. After tiling, the heating is brought up gradually.
What affects the price
The guide price for labour is €55.00 per m². The final figure can move up or down depending on how much work surrounds the actual tiling.
- Condition of the substrate: a flat new screed saves a lot of time. Old uneven plaster and floors need levelling first, which is often a separate item and, in poor condition, can cost more than the tiling itself.
- Tile size and weight: two people can handle 60 × 120 cm. Larger formats and oversized slabs need more people, frames and more time per piece, so the price per m² rises considerably.
- Wall or floor: wall tiling is slower, as the heavy tile has to be held, supported and aligned precisely both vertically and horizontally. Tilers therefore often charge more for walls than floors. When getting a quote, check whether the price per m² applies equally to both.
- Room complexity: niches, recesses, a wet room or shower with falls, window reveals and many cuts around pipes all add time. A small bathroom with lots of detail costs more per m² than a large, flat living room floor.
- Pattern and sorting: laying with matched veining takes longer than a simple grid, as each piece has to be selected and placed in the right position.
- Cuts and edge finishing: mitred external corners instead of trims, drilled holes and cut-outs for a linear drain take more work than straight cuts.
- Access: a narrow staircase or small lift in a block of flats makes carrying large boxes difficult, and sometimes they have to be carried up the stairs by hand.
When comparing quotes, check whether the price includes substrate levelling, priming, tanking, adhesive, the levelling system, grouting and silicone sealant, or whether these are listed separately.
What should be ready before the tiler arrives
The speed of the work depends heavily on how well the site is prepared. This applies even more to large formats, as every wait and every extra move costs time.
- water supply, waste and electrical runs in the walls and floor are complete and tested, and chases are made good. A new circuit or electrical work in a bathroom is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start,
- sanitaryware has been chosen and the tiler knows its dimensions and position, ideally including the frame for a wall-hung WC,
- materials are delivered on time and in full, from a single batch,
- boxes are stored upright, ideally on an A-frame stand or leaning against a wall on a firm, flat base, so the tiles do not bow and their corners are not damaged. Large formats should not be stacked flat or stored on an uneven surface,
- the room is cleared and it is clear where cutting and mixing can take place,
- water and power for tools are available on site,
- the room temperature is within the range given by the adhesive manufacturer, with no draughts or direct sunlight on fresh adhesive,
- for a block of flats, parking, lift access and waste removal are arranged.
In a block of flats, it is sensible to agree noisy work and the movement of materials in advance with the managing agent or freeholder. Replacing wall and floor tiles does not usually require permission. However, if the work is part of larger changes, such as removing partition walls or altering shared risers, check what local building regulations and your lease require. Work on load-bearing structures and shared services needs consent and a qualified professional.
Typical mistakes and how they show up later
Tiling onto an unlevelled substrate. In the hope that the adhesive will make up the difference, thick and uneven beds remain under the tile. The adhesive then shrinks unevenly, the edges move out of line and the tile may crack.
Adhesive only on the substrate or applied in dabs. Voids remain under the tile and sound hollow when tapped. Under load, for example a chair leg or a heavy object dropped on it, the tile breaks over the void. In a shower, water can get into the voids.
Cheap non-flexible adhesive. It cannot cope with substrate movement or underfloor heating. Over time the tiles debond or the joints crack.
Adhesive without reduced slip on walls. Heavy tiles slowly slide down as the adhesive sets, the joints close up and the rows are no longer straight.
No levelling system. The edges of neighbouring tiles sit at different heights. This shows in side light from a window, can be felt underfoot and lets dirt catch on the edge.
Missing movement joints at the perimeter and in large areas. When the temperature changes, especially with underfloor heating, the surface has nowhere to move. This shows as cracked joints, chipped edges or tiles that lift.
Walking on the floor too early or grouting before the adhesive has cured. The tiles shift, height differences appear and the grout may crack or change colour.
Careless handling. A corner chips off or the tile cracks before it is even laid. With large formats every broken piece is an expensive loss, and a replacement from another batch may differ in shade.
Tanking without tapes in the corners and around the drain. Water finds its way through a corner or around the drain, and the damage only appears on the ceiling of the neighbour below.
Checking the finished work at handover
- run a straightedge across the surface and check flatness in different directions,
- run a finger or fingernail across the joints - the edges of neighbouring tiles should not noticeably stand proud,
- inspect the surface in side light, for example with a lamp held low over the floor, as this shows height differences best,
- gently tap the tiles, especially at the corners and in the middle, to check for a hollow sound,
- check that the joints are straight, of even width and fully filled,
- look at the cuts at walls, door frames and around pipes to see that they match the agreed setting out,
- confirm that there are flexible movement joints around the perimeter and in internal corners,
- in the shower, check the falls to the drain and the connection to the tanking - water must not pond anywhere,
- check that no tiles have chipped corners, scratches or differences in shade,
- with underfloor heating, ask when and how to bring it up gradually,
- take the spare tiles from the same batch for any future repair.
Frequently asked questions
The guide price for labour is €55.00 per m². The final figure depends mainly on the condition of the substrate, whether it is a wall or floor, the tile size, the number of cuts and details, and site access. Substrate levelling and tanking are usually separate items.
Without experience, it is a risky job. It requires suction lifters, a levelling system, a cutter for large formats and a second person. A flatness error or a void under a tile is hard to put right. Preparation, such as clearing and cleaning the room, is more realistic as a DIY task.
Yes, if the setting out is well planned. Fewer joints look calmer and make the space appear larger. With many corners, niches and a shower with falls, however, expect more cuts and more waste.
Most often because of voids under the tiles, missing movement joints, movement of an uncured screed or unsuitable adhesive. Installed correctly, porcelain is very durable.
A typical bathroom with walls and floor usually takes several working days with large formats, and longer if substrate levelling and drying of the tanking are needed. With standard flexible adhesives, the new floor can usually be walked on carefully after about one day, while full loading and grouting follow the manufacturer's data. Rapid-setting adhesives shorten this time. Before using the shower, it is sensible to wait until the grout and silicone have cured according to the manufacturer, usually at least a few days.
Most manufacturers of rectified porcelain recommend a joint of 2 mm or more. A narrow joint looks elegant, but with no joint at all the surface would have no room to move and the edges could chip.
Sometimes, if the old tiles are firmly bonded, nowhere sound hollow and are flat enough. The surface must be cleaned and prepared with a primer designed for non-absorbent substrates. Allow for the raised floor level at doors and thresholds. If the old tiles are uneven or loose, it is more sensible to remove them. In homes built before 2000, have suspect materials tested before you drill or demolish - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.