Building work price list: Whole-house water filter installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
Why and when you need a whole-house filter
A whole-house filter, also called a protective or sediment filter, protects pipework and appliances from solid particles. It does not purify water to drinking quality and does not change its hardness or taste. It catches sand, rust, flakes from pipes and sludge that would otherwise end up in tap strainers, washing machine and dishwasher valves, the toilet cistern and the water heater.
The most common reasons for fitting one:
- sand or rust in the water: blocked aerators, the washing machine reports a strainer fault, the water runs brown after a supply interruption,
- old steel pipework: in older houses and blocks of flats rust comes loose from the pipes, especially after supply shutdowns and burst mains,
- a new plumbing installation: with new water supply pipework a filter after the meter is standard and protects new taps and appliances from day one,
- well water: it contains more sand and sludge, so a filter is practically essential,
- more expensive appliances and fittings: water softeners, combi boilers, thermostatic mixers and concealed showers are sensitive to debris.
The same scenario comes up again and again on forums: after a burst main or a supply shutdown, cloudy rusty water flows into the house, washing machines start reporting blocked strainers and aerators keep clogging for weeks. In a block of flats the first step is the building management, who should have the strainers at the main meter cleaned. Your own filter in the flat or house then catches whatever gets through.
Types of whole-house filter and which to choose
The main deciding factor is how the filter is cleaned. It makes little difference to the installation, but a great deal to maintenance and convenience.
Filter with a replaceable cartridge
A clear or opaque bowl holding a cartridge made of non-woven fabric, wound fibre or mesh. It is the cheapest to buy, but the cartridge has to be replaced. According to EN 806-5 at least once every six months, more often with cloudy water. The water must be shut off to change it.
Backwash filter
It has a stainless steel mesh that is cleaned by turning a valve or knob. The dirty water drains into a waste pipe or a bucket. EN 806-5 specifies a backwash at least once every six months, and the manufacturer JUDO recommends every two months. The mesh is not a consumable, so the filter is cheaper to run in the long term.
Automatic backwash filter
It starts the backwash by itself at a set interval or based on pressure loss. It needs a connection to a drain and some models also need a socket. It suits well water and situations where nobody wants to look after the filter.
Filter with a pressure reducing valve
A backwash filter and a pressure regulator combined in one body. It saves space and one installation if the mains pressure is high or fluctuates. On one common model the outlet pressure can be set from 2 to 6 bar and is factory set to 3 bar.
Carbon filters and water softeners are not the same thing
An activated carbon filter deals with taste, odour and chlorine, while a softener deals with limescale. Neither replaces a sediment filter; on the contrary, both need a sediment filter in front of them. A carbon filter for drinking water usually goes under the sink for the kitchen tap only, not for the whole house. If you also want to tackle hardness or taste, plan for it from the start, because every additional unit needs space and a bypass.
Mesh rating and filter size
For whole-house filtration a mesh of 100 to 200 microns is recommended. A finer mesh catches more, but clogs faster and pressure drops after the filter. Size is chosen according to peak demand, meaning when the shower, kitchen tap and washing machine are running at the same time, not according to daily consumption. The connection thread should match the pipe diameter. An undersized filter shows up as a weak flow, first at the outlets furthest away.
For an overview of fittings, threads and components for the water supply, see the article on plumbing materials.
Where exactly to fit the filter
- straight after the water meter and main stopcock, before the first branch. Only then does it protect the whole house and the hot water supply,
- before the pressure reducing valve, softener and water heater, not after them. After the meter come the stopcock and a non-return valve, and the filter should also protect the pressure reducing valve, which is sensitive to debris,
- on the cold supply, as filters are usually rated for water temperatures up to about 30 °C,
- somewhere frost-free, so not in an unheated meter pit without protection,
- where it can be reached, with enough free space to unscrew the bowl, change the cartridge and place a bucket under the backwash. Manufacturers state exact clearances, for example as much as 240 mm of free space at the side of the body,
- with a drain for a backwash filter: ideally connected to the drainage system via a tundish, otherwise at least room for a container of about 10 litres.
In a block of flats the meter is usually next to the riser in the service duct and space is tight. There the filter goes straight after the flat's water meter and stopcock, often behind an access panel. The filter is never fitted before the meter, as the meter and its seals belong to the water supplier or the building management.
How the installation works step by step
- Survey and choice of location: the plumber checks the pipe diameter and material, the pressure, the space after the meter and where the backwash water will go.
- Shutting off the water: the main stopcock is closed and the pressure in the pipework released by opening the lowest tap.
- Cutting out a section of pipe: on plastic pipe a section is cut out to match the installation length of the filter; on steel pipe the nearest joint is dismantled or new threads are cut.
- Isolating valves before and after the filter: ball valves go on both sides so the filter can be serviced without draining the whole house. In a house a bypass is also worthwhile, keeping water available during servicing.
- Fitting the body: the filter is installed according to the flow direction arrow, vertically, with the bowl at the bottom. Threaded joints are sealed according to the instructions, without force and without stress on the pipework.
- Fixing: heavier filters and combinations with a pressure reducing valve are fixed to the wall with a bracket so they do not hang on the pipe.
- Connecting the backwash: the outlet is led to a drain via an air gap, or space is prepared for a bucket.
- Filling and checking: the water is turned on slowly, the filter is bled, all joints are checked and the pressure is set on the reducing valve if fitted.
- First backwash and record: after the first fill the filter is flushed, because cutting the pipe releases debris. The date is written on the body or next to it.
What affects the price
The labour price in the price list is roughly €55.00 per piece; the filter and larger fittings are not included. The final figure depends mainly on:
- pipe material: plastic is quick to cut and connect, while old steel pipe means cutting threads and sometimes replacing a rusty section,
- space: a cramped service duct in a block of flats, an access panel or a meter pit makes the job longer,
- additional fittings: isolating valves before and after the filter, a bypass, a non-return valve, a pressure reducing valve, a pressure gauge,
- filter type: an automatic backwash needs a drain and sometimes electricity, while a combination with a pressure reducing valve is heavier and needs a bracket,
- backwash drainage: if a waste pipe has to be run to the filter, that is a separate job,
- surrounding alterations: opening up a wall, an access panel or re-soldering the pipework at the meter,
- combining with other work: when the filter is fitted together with new pipework or a water heater, the price per piece tends to be lower because the system is already drained.
You can work out the cost of the whole plumbing job, including the filter and fittings, in the plumbing work price list.
What should be ready beforehand
- the filter has been chosen, or at least its type, mesh rating and connection size,
- the water meter and main stopcock are freely accessible and any access panel is open,
- in a block of flats the water shutdown has been arranged in case the flat's stopcock does not seal and the riser has to be closed,
- it is clear where the backwash water will go,
- for a combination with a pressure reducing valve you know what pressure you want. The plumber can measure it with a pressure gauge.
Typical mistakes and how they show up later
Filter after a branch
If the filter is fitted after the branch to the water heater or outside tap, part of the house remains unprotected. The water heater keeps silting up.
Mesh too fine
The filter clogs quickly and shower pressure drops. On forums this is a common complaint with fine cartridges under 50 microns, which belong under the sink, not on the whole house.
Small filter for high demand
With one tap running everything is fine, but with the shower and washing machine at once the flow weakens. The solution is a filter sized for peak flow.
No isolating valves and no room for servicing
The cartridge cannot be changed without draining the whole house, and the bowl cannot be unscrewed because it sits just above the floor. Maintenance then gets put off and the filter clogs.
Forgotten maintenance
A clogged cartridge reduces pressure, and the debris it has caught stays in the incoming water for months. A backwash filter does not clean itself unless it is automatic.
Scrubbing the mesh by hand
A brush damages the fine mesh. The mesh is cleaned by backwashing according to the instructions, not mechanically.
Body hanging on the pipe
A heavier filter without a bracket pulls on the joints, plastic pipe bends and the joints start to drip.
How to check the finished work
- the arrow on the body points in the direction of flow, from the meter into the house,
- the filter is vertical, with the bowl or backwash valve at the bottom,
- there are isolating valves before and after the filter and they turn easily,
- after an hour without any water being used, all joints are dry, including under the bowl,
- with the shower and kitchen tap open at the same time there is no noticeable drop in flow,
- the backwash works and the water drains where it should,
- a heavy body is fixed to the wall,
- you have received the instructions and know how often to change the cartridge or backwash.
DIY guide: what to watch out for
A filter on plastic pipe with compression fittings is within reach of a handy amateur. With steel pipe, a cramped service duct or a combination with a pressure reducing valve it is better to call a plumber. If you do it yourself:
- Check that the main stopcock seals. If not, the water must be shut off before the meter, which in a block of flats is a matter for the building management.
- Buy a filter with connections matching the pipe diameter and a 100 to 200 micron mesh.
- Add ball valves before and after the filter and leave room for a bucket under the bowl.
- Follow the flow direction arrow and fix the body to the wall.
- Turn the water on slowly and check the joints again the next day.
- Put the date for the backwash or cartridge change in your calendar.
If the filter has an electrically powered automatic backwash, the socket or supply to it should be installed by an electrician.
Frequently asked questions
The guide price for labour in the price list is €55.00 per piece. The cost of the filter, isolating valves and other fittings is added on top. With old steel pipe or a cramped space the work tends to cost more.
After the water meter and main stopcock, before the first branch. The sealed meter belongs to the water supplier or the building management and nothing is fitted before it.
For most households a backwash filter with a 100 to 200 micron mesh is the practical choice. If the pressure is high or fluctuates, a combination with a pressure reducing valve is worthwhile. For well water or for convenience, an automatic backwash is suitable.
EN 806-5 states that the cartridge should be changed and the filter backwashed at least once every six months. Manufacturers of backwash filters recommend doing it more often, for example every two months, and checking the mesh roughly once a month. With cloudy water it needs doing even more often.
A correctly sized, clean filter hardly at all. Pressure drops when the filter is too small, the mesh too fine or the cartridge clogged.
No. A sediment filter catches sand, rust and sludge. Taste, chlorine or limescale are dealt with by other units, which are installed after the sediment filter.
Mains water is drinkable, but after bursts and shutdowns it often contains rust and sand, especially in older networks and buildings. The filter protects taps, appliances and the hot water supply from these particles.
Standard whole-house filters are designed for cold water. If the filter is on the incoming supply before the water heater, the hot water is filtered automatically.
Related work
How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.
How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.