Price list 2026 · Europe

Shower tray and enclosure fitting

A shower tray with an enclosure is the most common way to build a shower without a screeded fall to a floor channel. The tray takes care of the fall and the drainage, and the enclosure keeps the water inside.

Updated 11/2026·9 min read·27 price list items
Standard labour price
€130.00/ pcs
Indicative range
€104.00 - €169.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Shower tray and enclosure fitting

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Shower tray installationpcs€130.00 / pcspcsenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Install shower enclosure glass (screen)pcspcs-
Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed shower valve body (iBox)pcspcs-
Install concealed mixer tappcspcs-
Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-
Total labour
- enter quantity
Create quote from price list →

When a tray and enclosure are fitted

  • during a bathroom refurbishment, when a bath is replaced with a shower or the layout is changed,
  • when replacing an old shower cubicle that leaks, has yellowed plastic parts or a cracked tray,
  • in a new build, where a shower with a floor channel is not possible or not wanted,
  • in a flat in an apartment block, where the floor has no depth for a recessed waste and a tray on feet or a low-profile tray is the only sensible option.

If the tray is simply swapped for one of the same size and the waste lines up, the job is shorter. If the size, the waste position or a recessed installation changes, building preparation work and tiling are added.

What to decide before work starts

Tray material

  • acrylic: light, warm to the touch, usually on feet or on a polystyrene support. If poorly supported it flexes underfoot and can crack,
  • cast marble or mineral composite: heavy, rigid, often flat and low. It can be laid directly on the floor, recessed flush with the floor or set on feet,
  • enamelled steel: hard surface, but noisier when the water hits it and it needs support across the whole area.

Installation method

One manufacturer of cast marble trays gives three options that keep coming up in practice: on feet with a built-in front panel, on the floor with the trap recessed into the floor, and recessed flush with the floor level. For trays on feet, the manufacturer states a height of 30 mm above the floor and a 2 mm expansion gap between the tray and the front panel, filled with sanitary silicone. When laid on the floor, the base must be perfectly flat. With underfloor heating, the same manufacturer requires a clearance of at least 500 mm and thermal insulation under the tray.

A flat tray laid on the floor looks good, but it needs space for the trap in the floor. In apartment blocks there is often nowhere to recess it, so the tray has to be raised on feet.

Tray under the tiles or on the tiles

Tucking the tray edge under the tiles is the safest option against leaks, but it has to be decided before tiling and it reduces the usable size of the tray. Manufacturers point out that the enclosure dimensions need to be recalculated when the tray is tucked in. A tray fitted against finished tiles is sealed with silicone only, and that silicone has to be renewed over time.

Enclosure type

  • sliding doors for a corner or an alcove, saving space in front of the shower,
  • hinged or bifold doors, which need clear space to open,
  • quadrant enclosure with a curved front, for smaller bathrooms,
  • fixed walk-in panel, on a tray only with a larger size, otherwise water splashes out.

The enclosure size must match the tray, and the adjustment range of the wall profile must cover any unevenness in the wall. A walk-in screen fitted with a U profile or a separate shower glass panel is priced as a different item.

How the installation works step by step

  1. Checking the base and waste: the base must be clean, flat, solid and free of cracks. The position and height of the waste are checked against the tray trap.
  2. Waterproofing: before fitting, the floor and walls in the shower area are coated with a liquid waterproofing membrane and the corners are taped with waterproofing tape.
  3. Preparing the tray: on trays with feet, the feet are screwed in by hand, without tools. The cover and the strainer basket are removed from the trap.
  4. Connecting the trap: the tray is offered up, the trap position is marked and the waste is completed. The trap is tightened only lightly at first.
  5. Levelling: the feet are adjusted so that the tray is level in both directions. The centre foot is adjusted last, it should touch the floor but must not lift the tray.
  6. Bedding: a flat tray is bonded or bedded in adhesive, mortar or silicone according to the manufacturer's instructions. The fall to the waste is already built into the tray, so the tray itself is not laid to a fall.
  7. Water test: before the front is built in or panelled, the tray is filled with water and the trap and waste are checked for leaks.
  8. Final tightening and sealing: the trap is tightened fully. The joint between tray and wall is sealed with sanitary silicone, and with a tray on feet the front panel is tiled.
  9. Fitting the enclosure wall profiles: the profiles are set plumb with a spirit level, the holes are marked and drilled through the tiles with a tile drill bit. The supplied wall plugs are usually only for solid walls, plasterboard needs different fixings.
  10. Fitting doors and glass: the glass panels are fitted into the profiles, clearance and stops are adjusted, and the doors are aligned so that they close along their full height.
  11. Silicone and curing: the profiles are sealed as per the instructions, usually on the outside. Manufacturers state that the shower should not be used for at least 24 hours until the silicone has cured.

What affects the price

The labour price in the price list is roughly €130.00 per piece, meaning a tray with an enclosure. The tray, enclosure, trap and silicone are not included. The final amount depends mainly on:

  • installation method: a tray on feet is quicker, recessing it into the floor means breaking out and concreting,
  • moving the waste: if the waste does not line up with the trap, it has to be extended, moved or lowered,
  • building in and tiling the front: with a tray on feet the front is built up or covered with a panel and tiled, which is a separate job,
  • enclosure type and size: quadrants and sliding doors have more parts and more adjustment than a simple alcove door,
  • uneven walls: if the wall is further out of plumb than the wall profile allows, it has to be straightened or the profile extended,
  • wall substrate: plasterboard or a stud wall needs different fixings from masonry,
  • cutting the tray: some composite trays can be cut to size, which adds labour,
  • removing the old cubicle: taking out the old tray and removing silicone and adhesive is priced separately.

If the whole shower is being replaced including the mixer, see also fitting a shower mixer and work out the total cost in a bathroom estimate.

What needs to be ready

  • the tray, enclosure and trap are on site and checked, free of cracks and with all fittings complete,
  • the waste is brought out at the trap position, ideally according to the manufacturer's drawing,
  • the waterproofing is finished and dry,
  • it has been decided whether the tray goes under or against the tiles, and the tiler knows about it,
  • you know what is behind the wall where the enclosure profiles will be drilled, so that no pipe or cable is hit,
  • in a plasterboard wall, there is reinforcement where the profiles will be fixed.

Typical mistakes and how they show up later

The tray is not firmly supported

An acrylic tray flexes underfoot, the silicone at the wall tears and eventually the tray cracks. A flat tray on an uneven floor risks the same.

No water test before panelling

A leaking trap only shows up years later as a stain on the wall next to the shower or in the flat below. On forums, people fix this by breaking out the front panel or the entire tray.

Tray-to-wall joint sealed with silicone only

Silicone ages and cracks. If there is no waterproofing and tape beneath it, water goes straight into the wall. On forums, people describe paint flaking near the floor in the next room, which turned out to be caused by failed waterproofing around the shower.

Trap forced into position

When the waste does not line up and the trap is pulled in by force, the joint is under stress and will loosen over time. Slow drainage is usually caused by too shallow a fall on the waste pipe beyond the trap.

Silicone inside the enclosure where it should not be

Some enclosures are siliconed on the outside only, so that water getting into the profile can drain back into the tray. Silicone on the inside traps it and pushes it out. The instructions for the specific enclosure always take precedence.

Enclosure on an out-of-plumb wall without checking

The doors swing open on their own, do not close properly or the sliding panel sticks. The wall profile is always set with a spirit level, never by the line of the tiles.

Drilled pipe

When drilling profile holes in a wall with services, one hole in the wrong place is enough to mean a tiling repair.

How to check the finished work

  • a spirit level on the tray rim shows it is level in both directions,
  • nothing flexes or creaks when standing in the tray,
  • water drains from the whole surface to the trap and does not pool anywhere,
  • after a long shower the floor in front of the shower is dry and, if there is an access panel under the tray, there is no damp beneath it,
  • the silicone is continuous, smooth and free of gaps, including in the corners,
  • the doors close along their full height, sliding panels run easily and the magnetic seals meet,
  • when showering towards the door, no water drips out along the bottom edge or in the corners.

DIY guide: what to watch out for

Replacing an enclosure on an existing tray is manageable for a competent DIYer, although manufacturers assume two people. Fitting the tray involves the waste and the waterproofing, where mistakes are expensive. If you are doing it yourself:

  1. Read the instructions for both the tray and the enclosure before buying, not at the fitting stage. The dimensions, trap height and adjustment range must all match.
  2. Level the tray with a spirit level and let the centre foot just touch the floor.
  3. Before panelling the front, fill the tray with water and leave it to stand, then drain it and watch the trap.
  4. When drilling tiles, use a tile drill bit with the hammer action off, and perforated tape to stop the bit slipping.
  5. Apply silicone according to the enclosure instructions and do not use the shower for at least 24 hours.

Frequently asked questions

The guide labour price in the price list is €130.00 per piece, covering both the tray and the enclosure. On top of that comes the cost of the tray, enclosure and trap and, depending on the situation, moving the waste and building in and tiling the front.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.