Building work price list: Domestic Hot Water Recirculation System Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Install recirculation pipework | pcs | €160.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What hot water recirculation is and why people want it
In a standard system, hot water sits in the pipes and cools once the tap is turned off. A recirculation system, usually called a secondary return in the UK, adds a second return pipe alongside the hot supply and a small pump. Water then circulates back to the cylinder and the pipework stays hot. When the tap is opened, hot water arrives almost immediately and there is no need to run off cold water first.
Homeowners most often ask for a secondary return in a new build, during a bathroom refurbishment, or when waiting for hot water in the kitchen or an upstairs bathroom becomes a daily annoyance. Besides comfort, it saves the water that would otherwise go down the drain while waiting.
When recirculation makes sense
A secondary return pays off mainly where the cylinder is a long way from the outlets. A typical example is a house with the boiler and cylinder in a utility room or garage on the ground floor and the bathroom upstairs. A larger flat or maisonette with several bathrooms is similar. In a small flat where the water heater is next to the bathroom, it is rarely worthwhile, because hot water arrives quickly through a short pipe run anyway.
The hot water source also matters. Recirculation needs a hot water cylinder for the water to return to. A combi boiler without a cylinder, which heats water instantaneously, normally cannot be fitted with a secondary return. The exception is boilers designed for this mode. In a block of flats with communal hot water, the risers and any communal return are the responsibility of the freeholder or managing agent. Do not alter shared pipework without their consent.
What to decide before installation
These decisions determine the pipe route, the choice of pump and whether any chasing will be needed:
- Which outlets need instant hot water: usually the furthest bathroom and the kitchen. The return is taken to the furthest outlet or the end of the main branch, not to every tap separately.
- What cylinder is installed: check whether it has a secondary return connection. This is shown in the manual or on the data plate. If there is no connection, the return is commonly teed into the cold feed to the cylinder, with a non-return valve so cold water cannot enter the loop. On an unvented cylinder, any work should be carried out by an installer qualified for unvented systems.
- Where the return pipe can run: a service duct, a suspended ceiling, the space under the stairs or a chase in the wall. In a finished house this is often the biggest question.
- How the pump will be controlled: by a timer, a thermostat, a self-learning pump or a push button at the tap. The differences are described below under pump selection.
- Who makes good chases and openings: the plumber often does only the pipework. Plastering, tiling and decorating are usually separate jobs and priced separately in quotes.
How the installation is carried out step by step
- Survey and design: the plumber checks where the cylinder is and how the hot water pipework runs. They decide how far the return must be taken, how it will connect to the cylinder, which pump to use and how it will be controlled.
- Marking out the route: the return pipe is kept as short as possible with no dead legs, ideally running alongside the hot supply.
- Isolation: the water supply is turned off and the affected section of the hot water pipework is drained. If the work also involves disconnecting the boiler or the cylinder coil, draining the heating system may be needed as well.
- Laying the pipe: the return pipe, usually a smaller diameter than the hot supply, is installed and connected at the far end to the end of the hot water branch. Where a radiator is in the way of the route, it may need temporary radiator removal and refitting.
- Connecting to the cylinder and fitting the pump: near the cylinder, a secondary return pump is fitted on the return with isolating valves on both sides and a non-return valve. The arrow on the pump points in the direction of flow towards the cylinder. The pipe is then connected to the cylinder's secondary return connection if there is one, otherwise teed into the cold feed.
- Branch valves: where there are several branches, balancing valves or thermostatic circulation valves are fitted so water flows evenly through all of them.
- Testing: the system is filled, bled and pressure tested for leaks while the joints are still visible.
- Insulation: both the hot and return pipes are lagged along their whole length, including bends and fittings.
- Electrics and controls: the pump is wired in and the running times or temperature are set.
- Checking and fine-tuning: at the furthest tap, the time until hot water arrives is checked. With several branches, the valves are adjusted.
- Making good: chases and openings are closed only after a successful test.
The electrical connection of the pump, especially a hard-wired connection to a fused spur rather than a plug, should be done by a qualified electrician, and the work should be installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. Internal alterations to pipework in a house or flat do not normally need building regulations approval. However, under the Water Supply (Water Fittings) Regulations 1999 some plumbing work, such as fitting certain pumps, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify. However, if the work would affect structural elements or the communal parts of a block of flats, check the procedure with local building control and the freeholder in advance. Any work on structural elements always needs to be assessed by a professional.
Pump, controls and materials: what to choose
For domestic hot water, use a pump designed for potable water, with a bronze, brass or stainless steel body. A standard central heating circulator with a cast iron body is not suitable, because it would corrode in contact with fresh water. A small pump is enough for a typical house. Larger pumps are only needed for long pipe runs and large buildings.
A pump that runs continuously keeps pushing hot water around the pipes and heat is lost along the way. Most households need hot water in the morning and evening, so the pump is controlled in one of these ways:
- timer: the pump runs only at set times, for example in the morning before leaving and in the evening,
- thermostat: the pump switches on when the water in the return drops below a set temperature,
- self-learning pump: according to the manufacturer, it remembers when hot water is used in the household and adapts,
- on demand: a push button or sensor near the tap starts the pump for a short time.
Savings have a limit set by hygiene. Hot water in the loop should not stay at a low temperature for long, because bacteria such as Legionella multiply more easily. The cylinder outlet temperature is therefore usually kept at around 55 to 60 °C, and the water coming back through the return should not fall below roughly 55 °C. Breaks in pump operation should be short, not all day. Many systems also allow periodic heating to a higher temperature.
The pipework uses standard water supply materials, such as plastic, multilayer pipe or copper, with insulation of suitable thickness. A low loss header, sometimes mentioned in connection with the plant room, belongs to heating circuits and is not fitted in a domestic hot water loop. For the wider context of boilers, cylinders and circuits, see the overview of heating work.
Cost of installing recirculation: what it depends on
The guide price for labour is €160.00 per piece. One piece usually means one recirculation loop or one connected branch, but tradespeople price it differently. Some include only the pipework and connection, others also include fitting the pump, valves, insulation and setting up the controls. When comparing quotes, check exactly what each piece includes. The final total is then driven mainly by these factors:
- New build or finished house: in a new build or full refurbishment the walls are open and the return is laid with the other services. Retrofitting into a finished house is much more labour-intensive, because a route has to be found and chasing is often needed.
- Length and complexity of the route: a short, straightforward run from the cylinder to one bathroom costs less than a long run over several floors with many bends and wall penetrations.
- Access to the pipework: a service duct, suspended ceiling, space under the stairs or plant room makes the work easier. Running pipes in chases in finished walls, under floor tiles or through wall tiling adds the most cost.
- Condition of existing pipework: old pipework in poor condition that partly needs replacing, and missing isolating valves, add labour and materials.
- Cylinder: a cylinder with a secondary return connection is an advantage. Teeing into the cold feed means more fittings and work.
- Number of branches: each additional branch means more pipe, balancing or thermostatic valves and time for fine-tuning.
- Pipe material: plastic and multilayer pipe is quicker to install, copper usually takes longer to joint.
- Pump and controls: a simple pump with a timer is cheaper than a self-learning pump or sensor activation at the tap.
What makes installation easier and what slows it down
Apart from the technical conditions, it also matters how well the property is prepared for the work. Installation goes faster when:
- the room with the cylinder is clear and the plumber can reach the boiler and cylinder from all sides,
- drawings or photos of the pipework from construction are available, showing where the hot water runs,
- the water shutdown is agreed in advance and, in a house, the location of the main stopcock is known,
- in a block of flats, the managing agent has agreed if the water on the riser needs to be turned off briefly,
- a socket or fused spur is ready near the cylinder for the pump,
- the areas along the route are cleared, such as under-sink cupboards, ceiling voids and the space under the stairs.
The work takes longer if the route is changed during installation, if there is no electrical supply and the pump cannot be started, or if the job has to wait for the freeholder's consent or for other trades.
Typical mistakes and how they show up later
Pump without controls
It runs day and night, wastes electricity and cools the water in the cylinder. The water heating bill then rises even though the recirculation works.
Missing or poor insulation
Water in the pipes loses heat quickly, the cylinder reheats more often and the savings disappear. Bends and fittings are often left unlagged because they take more effort.
Missing non-return valve
Water can flow the wrong way and cold water can be pushed into the return pipe.
Pump fitted the wrong way round
The arrow on the pump must point towards the cylinder. Otherwise the loop does not work, or only partly.
Unbalanced branches
Water takes the shortest path and the furthest bathroom is left without hot water.
Unsuitable pump
A heating circulator with a cast iron body corrodes. An oversized pump is noisy and uses more energy.
Return connected somewhere other than the end of the branch
The part of the pipework beyond the connection stays outside the loop, and the taps on that section still take a long time to run hot.
Dead legs and overly long tails to taps
Water stands in them and cools, so the benefit of recirculation is lost and water hygiene also suffers.
Temperature too low or long breaks in operation
Lowering the cylinder temperature or switching the pump off for days creates conditions in the pipework for bacteria to multiply.
Making good before the pressure test
A leaking joint only appears as a damp patch on the wall, and the repair means chasing out again. Where pipework is hidden in boxing rather than chases, for example in the same way as radiator boxing in, it is worth leaving an access panel at the joints.
How to check the finished work at handover
At handover, ask to be shown how the system works and check the following:
- a pressure test has been carried out and the joints are dry, with no drips,
- both the return and hot pipes are lagged along their whole length, including bends and fittings,
- the pump is rated for potable water and the arrow points towards the cylinder,
- isolating valves and a non-return valve are fitted at the pump and are accessible for servicing,
- with several branches, balancing or thermostatic valves are fitted and hot water reaches every branch,
- the controls are set and the occupier knows how to change the times or temperature,
- hot water reaches the furthest outlet within a few seconds,
- the pump runs quietly, without humming or gurgling,
- the electrical connection was made by a qualified electrician,
- chases and openings have been made good, if this was part of the agreement,
- the manuals for the pump and controls have been handed over, and ideally a sketch of the pipe route.
Frequently asked questions
The guide price is €160.00 per piece. One piece usually means one loop or branch. The final total depends mainly on whether it is a new build or a retrofit in a finished house, the route length, the number of branches, the condition of the existing pipework and the type of pump and controls.
Often yes. The return pipe can run through a service duct, a ceiling void or utility spaces. How much chasing is needed depends on the layout of the house and where the existing hot water pipework runs.
The pump itself uses little power. Greater losses arise if it runs continuously and the pipework is not insulated. With sensible controls and good insulation, the difference in running costs is usually small, and the water that would otherwise be run off is saved.
Usually not, because the water has nowhere to return to. Some boilers are designed for recirculation, otherwise a cylinder has to be added. Ask the engineer who services the boiler. Work on a gas boiler must only be carried out by a Gas Safe registered engineer.
Laying the pipework is plumbing work that requires experience, tools and a pressure test. Wiring the pump is not a job for a non-specialist. It is more sensible to have the installation done by a plumber.
According to when the household uses hot water most, usually in the morning and evening. The pump switches on shortly before these times so the water in the pipes is hot. However, breaks should not be too long, and the water in the return should not stay below roughly 55 °C for long periods. It is therefore safer to combine a timer with a thermostat that starts the pump when the water cools.
It is enough to check occasionally that the pump runs quietly, the time settings are correct and the joints are not leaking. In hard water areas, it is worth checking the pump and non-return valve when the cylinder is serviced.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.