Removal of water storage tank

Removing a water storage tank means isolating the water heater or cylinder from water, electricity or gas, draining it and taking it down. The guide price is €109.00 per piece. Type, size, access and valve condition affect the cost.

Updated 09/2026·13 min read·34 price list items
Standard labour price
€109.00/ pcs
Indicative range
€87.20 - €141.70
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Removal of water storage tank

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What removing a water heater involves and when it is needed

Besides isolating and draining, removal includes taking the tank off its wall brackets or lifting it off its base, and preparing the space for the new appliance. It is most often needed when an old water heater or hot water cylinder is replaced because it leaks, rusts or heats slowly. It is also needed when a bathroom or airing cupboard is refurbished and the tank is moving to a different place. This work belongs to the wider field of heating work, especially where the cylinder is connected to a boiler.

Removal is only the first half of a replacement. When done properly, the pipe connections are capped, the electrical supply is safely terminated and the wall is ready. The new tank can then be fitted without further dismantling. With a gas water heater or a cylinder heated by a boiler, the work also involves gas, the flue or the heating system. It should therefore be carried out by a suitably qualified professional.

What to clarify before booking

The more information the tradesperson has when booking, the less time is lost on site and the less likely a second visit becomes.

  • What type of tank you have: electric, gas or indirectly heated by a boiler. Mention whether it is wall-hung or floor-standing. The type and capacity are shown on the rating plate on the casing.
  • How the electricity is connected: by a plug or by a fixed connection. A fixed supply must be disconnected and terminated by a qualified electrician. Check in advance whether the company will arrange this.
  • What happens next: a new heater fitted in the same place, fitted elsewhere, or the tank simply removed for good. This determines how the connections are finished and whether pipework needs altering.
  • Who takes away the old unit: the company removes and disposes of it, or you deal with it yourself.
  • Water isolation: whether there is a working isolating valve right by the heater, or the water has to be turned off for the whole flat or a shared supply. Turning off a shared supply must be agreed in advance with the managing agent or the building management.
  • Timing: there will be no hot water during the work and until the new tank is fitted. With a cylinder connected to the heating, the heating may also be out of action for a while. In winter this needs planning.

How a water heater is drained and removed step by step

For a typical wall-hung electric water heater, the work follows a clear order. It looks simple at first glance, but each step has its reason:

  1. Switch off the heater's circuit breaker at the consumer unit and confirm there is no voltage on the supply.
  2. Close the cold water supply to the heater.
  3. Open a hot tap in the property so that air can enter the tank and water can drain out.
  4. Drain the tank. If it has a separate drain valve, water is run through a hose to a drain. Many heaters do not have one. They are then drained through the combined safety valve by lifting its lever, or by loosening the cold water connection at the bottom of the tank with a container placed underneath.
  5. Disconnect the cold and hot water connections and cap them.
  6. Disconnect the electrical supply and terminate it safely.
  7. Lift the empty heater off its bracket, ideally with two people.
  8. Check the condition of the valves, pipework and wall fixings.

Why must the heater be drained first? One litre of water weighs about one kilogram, so an 80-litre heater holds about 80 kg of water plus the weight of the vessel itself. Taking it down full is dangerous for people and for the wall.

Draining takes time. A heater of around 80 litres usually empties through a drain valve and hose in several tens of minutes. Through the safety valve lever, which has a low flow rate, it can take over an hour. It takes even longer if the outlet is blocked with limescale. The whole removal of a standard wall-hung electric heater, including draining, usually takes one to two hours.

The water in the tank may still be hot. Where possible, the heater is switched off well in advance so the water cools before draining. The hose is led into a bath, shower or floor drain and secured so it cannot pull free.

A fixed electrical supply to the heater must be disconnected and terminated by a qualified electrician. If the heater hangs high up or above a bath, the work is done from a ladder with a heavy load. It is not a job for an untrained person to do alone.

Gas water heaters and cylinders connected to the heating

Gas water heater

With a gas water heater, gas and the flue have to be dealt with as well as water. A gas appliance may only be disconnected by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. The engineer turns off the gas supply, disconnects the appliance, caps the gas pipe and tests it for tightness. The flue is also disconnected and the opening into the chimney sealed or prepared for a new appliance. The engineer should give you a record of the work carried out.

If you smell gas during the work or at any time afterwards, do not use switches or naked flames, ventilate the area, leave the premises and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

Cylinder heated by a boiler

An indirect cylinder contains a coil connected to the heating circuit. Before removal, the circuit must be isolated with valves or the heating system drained, as described in draining a heating system. Otherwise water would end up on the floor and air would get into the system. After the new cylinder is fitted, the heating is refilled, bled and brought back to the pressure specified by the boiler manufacturer. If the whole system cannot be drained, for example in an occupied house in winter, a heating engineer sometimes uses pipe freezing. A special kit creates a temporary ice plug in the pipe so that only the necessary section is disconnected.

Such a cylinder usually has connections for cold and hot water and for the flow and return from the boiler. It often also has hot water secondary circulation and a temperature sensor for the boiler controls. During removal it is worth labelling each pipe so they are not mixed up when the new cylinder goes in.

Large and floor-standing tanks

Floor-standing cylinders in a plant room are heavy and often sit in a narrow space or in a basement reached by stairs. For these, the route out, protection of floors and door frames, and the number of people needed to carry them are planned in advance. In homes built before 2000, have old cylinder or pipe lagging tested before it is disturbed, as asbestos lagging must be removed by an HSE-licensed contractor.

What affects the price of removal

The guide price for the labour is €109.00 per piece. It applies to a standard case, meaning a wall-hung electric heater with accessible connections. The final amount mainly depends on the following:

  • Type of tank: an electric heater is the simplest. A gas water heater needs a Gas Safe registered engineer, capping of the gas supply, a tightness test, flue disconnection and a record of the work, which makes the job considerably more expensive. A boiler-heated cylinder adds draining or isolating the heating, then refilling and bleeding it.
  • Size and weight: one person can quickly handle a small under-sink heater. A larger wall-hung tank is taken down by two people and takes longer to drain. A large floor-standing cylinder in a plant room may need more people and more time to carry out.
  • Height and access: a heater high above a bath, in a narrow recess, behind a suspended ceiling or in a basement with stairs means slower and more demanding work.
  • Condition of connections and valves: corroded nuts and fittings that cannot be undone without cutting add work. If the cold water isolating valve lets by, the water must be turned off for the whole flat, house or shared supply and another valve found.
  • Scaled-up tank: with a thick layer of limescale, draining takes a long time and the drain outlet sometimes has to be cleared.
  • Pipe freezing: if the heating cannot be drained, using a pipe freezing kit is an extra operation.
  • Electrician: ask whether disconnecting a fixed supply is included in the price or whether you need to arrange an electrician yourself.
  • Related work: replacing isolating and safety valves, altering pipework, strengthening the wall for the new heater, and carrying out and disposing of the old tank are usually priced separately.

When comparing quotes, it is worth asking exactly what the price covers. It may be just taking the tank down, or it may also include capping the connections, terminating the electrics, disposal and refilling the heating where needed.

How to prepare so the work goes quickly

Preparation on your side saves a lot of time:

  • the area around the heater is cleared and items are removed from the bath or washing machine below it,
  • the isolating valves, the main stopcock and the circuit breaker can be reached without moving furniture,
  • you know which breaker serves the heater, ideally labelled in the consumer unit,
  • the route from the heater to the door is clear and the hallway floor is covered or can be covered,
  • any pipe boxing next to the tank can be opened; if new boxing is planned for pipes or radiators afterwards, see radiator boxing in,
  • if a shared supply is being turned off, the date is confirmed and neighbours have been informed,
  • the new heater is on site with its instructions if it is being fitted on the same day,
  • for a gas appliance or heating work, it is clear who is coming and in what order, so tradespeople are not left waiting for each other.

The work takes longer if the breaker has to be located on the day, if the stopcock is blocked by a cupboard, or if the new tank has not yet been delivered and the connections can only be finished temporarily.

What to do with the old water heater

An electric water heater counts as electrical waste, so do not put it in the general household bin. You can take it to your local household waste recycling centre, or hand it back to the retailer when buying a new appliance, as retailers usually offer a take-back service. Gas water heaters with electronics, such as electronic ignition or a display, also belong in electrical waste collection. Steel tanks without electrical parts are also accepted by scrap metal dealers. Many companies that remove the heater will also take it away. Before you hand it over, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. Agree this in advance so the empty tank is not left in your hallway.

Even a drained heater often holds some remaining water and sludge. When carrying it through the property, it is worth having a cloth or plastic sheet ready to protect the floor.

If the removal involves relocating a gas appliance, altering the chimney or changing load-bearing structures, check with your local authority building control whether the work needs to be notified or approved. Ask before booking the work and describe exactly what will change. Simply replacing a water heater in the same place is routine maintenance.

Typical mistakes and how they show up later

The heater is taken down while still full or only partly drained. There is a risk of injury, the tank falling, the brackets being pulled out of the wall and flooding of the bathroom and the neighbour below.

The hot tap is not opened during draining. No air gets into the tank, water barely flows and draining drags on. Someone then impatiently loosens a connection and the water comes out all at once.

The electricity is turned off only at the thermostat, not at the breaker. The terminals remain live and there is a risk of electric shock when disconnecting.

Water connections are left uncapped. All it takes is someone opening the main stopcock, and water runs straight onto the floor. With a shared supply, this can also happen when the building management turns the water back on.

A gas appliance is disconnected by someone who is not Gas Safe registered. A poorly sealed cap may not be noticeable straight away, but it poses a risk of a gas leak. There is also no record of the work, which will be needed when the new appliance is connected.

With a cylinder connected to the heating, bleeding and system pressure are forgotten. Radiators stay partly cold, the pipes gurgle and the boiler may show a low pressure fault. Bleeding is also needed after other heating work, such as radiator removal and installation.

In a block of flats, the water is turned off for the whole block without agreement. Neighbours are unexpectedly left without water. When it is turned back on, debris from the pipes can clog their taps and filters.

Old valves are left in place without being checked. The new heater is connected to a leaking isolating valve or a scaled-up safety valve, which then drips or fails, and someone has to come back to the wall.

How to check the finished work

After removal, go through these points before the tradesperson leaves:

  • the cold and hot water connections are capped and it is dry underneath,
  • the main stopcock is open again and nothing is dripping anywhere,
  • the electrical supply is safely terminated and the breaker is labelled,
  • for a gas appliance, you have a record of the capping and the tightness test,
  • the chimney opening is sealed or prepared for a new appliance,
  • the heating is refilled, bled and the pressure matches the boiler manufacturer's figure,
  • the wall and brackets are in a suitable condition for the new heater,
  • the surroundings, the floor and the route the tank was carried out are clean and undamaged,
  • the old tank has been taken away or you know where to dispose of it.

It is worth checking under the capped connections again after a few hours. A slow drip sometimes only shows up after a while.

How to drain the water heater yourself before the tradesperson arrives

Turning off the water and draining an electric water heater can be managed by a capable householder, provided there is a working isolating valve by the heater. Leave disconnecting a fixed electrical supply, taking a heavy heater down from height, gas water heaters and cylinders connected to the heating to professionals.

  1. Switch off the heater's circuit breaker, or unplug the heater if it is plugged in. Ideally do this several hours in advance so the water cools.
  2. Close the cold water isolating valve to the heater.
  3. Open a hot tap in the property and leave it open.
  4. If the heater has a drain valve, attach a hose and secure the end in the bath, shower or floor drain. If it has none, drain it by lifting the safety valve lever and catch the water from its outlet in a container or drain.
  5. Open the valve or lever and let the water run out. Through the safety valve, or with a scaled-up outlet, expect a longer wait.
  6. While draining, check that the hose has not slipped out and that no water is dripping onto the floor.
  7. Do not disconnect the pipework or the electrics and do not take the heater down. The tradesperson will do that.

Frequently asked questions

The guide price is €109.00 per piece for a standard wall-hung electric water heater. A gas water heater, a cylinder connected to the heating, a large floor-standing tank, poor access or corroded connections increase the price. Disposal, valve replacement and pipework alterations are usually charged separately.