Building work price list: Installation of Hot Water Recirculation Pump / Recirculation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Install domestic hot water (DHW) / recirculation pump | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What hot water recirculation is and when it is needed
If you open a tap in an upstairs bathroom and cold water runs for a long time before the hot arrives, hot water recirculation (also called secondary circulation) solves the problem. A small pump keeps hot water moving in a closed loop between the hot water cylinder and the outlets. Hot water is then available at the tap almost immediately. Recirculation is fitted in new builds, during replumbing, or when an old pump fails and has to be replaced. It is part of wider heating work in the home.
In a standard layout, hot water runs from the cylinder to the taps in a single pipe. When no water is drawn, the water in the pipe goes cold. Recirculation adds a second, return pipe that carries water from the furthest outlet back to the cylinder. A pump on this return pipe moves the water slowly round the loop, so the pipework stays warm.
In practice, "fitting a recirculation pump" covers two different jobs:
- Pump replacement: the return pipe already exists, and the old pump is faulty, noisy or unsuitable and is replaced with a new one. This is a shorter job in the airing cupboard or plant room.
- New recirculation loop: there is no return pipe, so one has to be run, the pump fitted with its valves, the pipework insulated and the controls set up. The pump itself is only part of the work.
When recirculation is worthwhile and what to decide in advance
It is worthwhile mainly where:
- bathrooms or the kitchen are a long way from the hot water source,
- the house has several floors or several bathrooms,
- the household regularly runs off cold water before the hot arrives,
- the pipework is being renewed and adding a return pipe is straightforward.
In a small flat with short pipe runs the benefit is usually small. Where a block of flats has a communal hot water system, recirculation is normally the responsibility of the managing agent or the freeholder. Do not alter shared risers without their consent.
Before placing an order, clarify the following:
- Where the hot water comes from. Recirculation needs a hot water cylinder for the water to return to. With a combi boiler that heats water on demand it usually does not work, although some models allow it.
- Whether the cylinder has a secondary return connection. If not, the connection is more complicated. This is shown in the installation manual or on the cylinder's data label.
- Where the pipes run. Pipework in a ceiling void, a duct or a basement is easy to extend. Pipes buried in walls and floors mean chasing out and making good.
- How the pump should be controlled. By time, by temperature, a combination of both, or on demand by a button. This determines the type of pump and controls.
- Who will do the electrical connection and who will work on the boiler. Wiring the pump permanently into the electrical installation or into the boiler controls is a job for a qualified electrician, and all new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. If the work involves a gas boiler, only a Gas Safe registered engineer may work on it, so check the back of their ID card to see which work they are qualified for.
- Whether approval is needed. Fitting recirculation in a house does not usually need formal approval. As part of a larger refurbishment, or where an unvented cylinder is altered, check the requirements with local building control. Under the Water Supply (Water Fittings) Regulations 1999, some plumbing work, such as fitting certain pumps, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
Which hot water pump and controls to choose
A pump for domestic hot water is not the same as a central heating pump. Recirculation carries oxygen-rich drinking water, so the pump body must be made of a material suitable for potable water, usually bronze or stainless steel. A cast iron heating pump would quickly corrode in such a loop, the water could turn brownish and the pump would fail much sooner.
As for output, a small energy-efficient pump is usually enough for a house. An oversized pump gives no extra comfort. It can be heard in the pipes, increases heat loss, and high flow velocity can gradually erode the walls and bends of copper pipework.
The following control options are available:
- time control: the pump runs, for example, in the morning and evening, when the household uses most water,
- temperature control: the pump switches on when the water in the return pipe cools below a set value,
- a combination of time and temperature, which is the most sensible option in practice,
- on-demand operation by a push button or through a smart home system.
A pump without any controls runs constantly, the whole loop keeps losing heat and the heat source has to keep topping it up. Good controls keep the comfort and greatly reduce unnecessary running.
With time control, avoid overly long breaks. When the pump stands for a long time, water in the return pipe stagnates and cools, which creates conditions for bacteria to multiply. Time windows are therefore set so the loop does not stand idle for too long, and combined with temperature control or periodic heating to a higher temperature, if the heat source allows it.
Every unvented (mains pressure) cylinder must have a set of safety controls on the cold feed, including a check valve and a pressure relief valve, whether or not recirculation is fitted. The check valve turns the cylinder into a closed system, so water that expands when heated has nowhere to go back to. The relief valve discharges it if the pressure gets too high. An expansion vessel rated for potable water absorbs this expansion, reduces dripping from the relief valve and protects the pipework and fittings. Fitting recirculation is a good opportunity to check that the relief valve works.
How recirculation is fitted step by step
In a new build, recirculation is designed together with the rest of the plumbing. When retrofitting, the first step is to find out whether and where a return pipe can be run. A typical sequence is:
- Assess the existing pipework: route, pipe sizes, condition and whether the cylinder has a secondary return connection.
- Plan the route of the return pipe and the pump position, usually in the airing cupboard or plant room next to the cylinder.
- Turn off the water supply, drain the affected part of the pipework and switch off the water heating. If work on the cylinder coil or boiler side is needed, the heating circuit may also have to be emptied - see draining a heating system.
- Run the return pipe and connect it at the furthest outlets or at the end of the hot water pipework.
- Fit the pump with isolating valves on both sides and a check valve, plus balancing valves on longer systems. The flow direction follows the arrow on the pump body and on the check valve.
- Insulate both the hot flow and the return pipe.
- Refill the system, bleed the air out and carry out a pressure test.
- Connect the pump to the electrical supply and set up the controls.
- Check operation with real water use in all bathrooms and the kitchen.
Adding a return pipe during refurbishment can take a full day or more, depending on how much chasing out and making good is needed.
Replacing a circulation pump in an existing loop
If the return pipe is already working and only the pump is being changed, no new pipework is needed. The plumber closes the valves next to the pump, removes the old pump, fits the new one, bleeds the loop and sets the controls. Swapping the pump itself usually takes a few hours.
If the old pump has no isolating valves or check valve, it is sensible to add them during the replacement. Without valves, the whole hot water system has to be drained, which makes the job longer. Replacement is also a good moment to swap an old uncontrolled pump for a new one with time or temperature control.
How much fitting a recirculation pump costs and what affects the price
The guide labour price is €35.00 per piece. The price per piece covers the labour for fitting one pump. The pump, valves and pipework may be charged separately, so check what the quote includes. The total for the job can be much higher than the price per piece, depending on what else has to be done around the pump.
- Replacement or new loop: replacing a pump in an existing loop is the simplest case. A new return pipe adds pipework, insulation, valves and labour hours, so the total can be several times the cost of fitting the pump alone.
- Cylinder connection: a cylinder with a secondary return connection makes the work easier. Without one, another connection point has to be found, which takes longer.
- Access to the pipework: pipes in a ceiling void, duct or basement are the cheapest option. Pipes in walls and floors mean chasing out and then making good the plaster or tiling, often done by a plasterer or tiler and charged separately.
- Number of branches: a house with several branches and floors needs balancing valves and adjustment. Each extra branch adds materials and time.
- Condition of old pipework: old steel pipes may turn out to be furred up, and part of the pipework may need replacing. Such work cannot be estimated precisely in advance.
- Type of pump and controls: a pump for potable water costs more than a heating pump. A pump with built-in time and temperature control costs more than a basic one but is cheaper to run.
- Additional fittings: isolating valves, a check valve and a potable water expansion vessel if missing, or replacement of a faulty relief valve.
- Electrical connection: wiring by an electrician, or connection to the boiler controls by a heating engineer, is usually a separate item.
How to prepare so the pump is fitted quickly
A lot of time is lost looking for stopcocks, clearing out the airing cupboard and waiting for another trade. It helps to have ready:
- clear access to the cylinder, boiler and main stopcock, without shelves or stored items,
- drawings, plans or photos of the pipework from the build, if available, so the route does not have to be found by trial openings,
- the manuals or model details of the cylinder and boiler,
- an electrician, or the boiler engineer if needed, booked for the same day or the next,
- a socket or fused spur near the pump position, if agreed in advance,
- a date when the household can manage without water for a few hours, or a supply of water for drinking and washing,
- cleared space along the return pipe route if walls will be chased or a ceiling opened. If the route runs behind a radiator, allow for radiator removal and refitting.
The job takes longer when it turns out on site that nobody knows where the pipes run, or the valves leak or will not close and the whole house has to be drained. If you know the main stopcock is old, tell the plumber in advance.
Typical recirculation mistakes and how they show up later
- Missing or wrongly fitted check valve on the return. When hot water is drawn, water can also be pulled through the return pipe from the cylinder, so cooler water mixes with the hot. When the pump is off, the loop can also circulate by itself and lose heat. This shows up as lukewarm water, fluctuating shower temperature, or recirculation that seems not to work.
- A central heating pump. In a potable water loop it corrodes and fails much sooner than it should.
- Uninsulated return pipe. It gives off heat into walls and floors. The heat source fires more often than it should, and energy bills rise without extra comfort.
- Pump without controls. It runs non-stop, the loop constantly loses heat and the pump wears faster.
- Wrong output. An oversized pump is noisy and wastes energy, an undersized one cannot push hot water to distant branches.
- Pump fitted in an inaccessible place. When it fails, tiling or a ceiling has to be taken apart. Do not hide it inside radiator boxing or other fixed casing without a removable panel. Without isolating valves on both sides, the whole hot water system also has to be drained at every replacement.
- Unbalanced branches. In a house with several bathrooms, hot water arrives quickly only in the nearest one, while you still wait in the others.
- Water temperature in the loop too low. Lukewarm water circulating or standing in pipes increases the risk of Legionella bacteria. Hot water in the loop is therefore normally kept at around 55 °C or above, and heated to a higher temperature from time to time if the heat source allows. Exact values are set by the cylinder manufacturer and the applicable standards and guidance, and the installer should follow them when setting the controls and also check the temperature at the outlet.
How to check recirculation at handover
At handover, check:
- that hot water is available almost immediately at the furthest tap,
- with several bathrooms, that hot water arrives quickly in all of them, not only the nearest,
- that the pump runs quietly, without humming or vibration,
- that the joints are dry and a pressure test has been carried out,
- that the pump has isolating valves on both sides and a check valve fitted the right way round,
- that both the hot flow and the return pipe are insulated,
- that the pump is accessible, so it can be replaced later without breaking anything out,
- that the controls are set to your daily routine, that you can change them yourself and that breaks in operation are not unnecessarily long,
- that the water temperature in the loop is not too low,
- that you have received the pump manual, the warranty and a description of the wiring.
Frequently asked questions
Roughly €35.00 per piece. This price covers the labour for fitting the pump. If a return pipe has to be added, walls chased, pipes insulated, fittings added or the pump wired in by an electrician, the total for the job will be higher.
The pump itself uses little electricity. The bigger factor is heat loss from the loop. With good insulation and time or temperature control the losses are small, and water that would otherwise be run off is saved.
Sometimes, for example where pipes run in a ceiling void, a duct or a basement. There are also systems that use the cold pipe instead of a return pipe, but they have limitations and suit smaller systems. The plumber will assess this on site.
Usually not, because a combi boiler has no cylinder for the water to return to. Some models allow it, so check the manual or ask the boiler manufacturer or a heating engineer.
Correctly chosen and sensibly set, it lasts for years. Hard water, debris from the pipework and continuous running shorten its life. Regular checks and bleeding the loop help.
Replacement means draining the hot water system, working with hot water under pressure and connecting to the electrical supply. It is therefore best left to a plumber, and where the pump is permanently wired, to a qualified electrician.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.