Circulation Pump Installation

A circulation pump moves water around a heating system or a hot water circulation loop. Fitting one costs roughly €100.00 per piece, excluding the pump. The price depends mainly on the valves, the pipework and access.

Updated 09/2026·12 min read·34 price list items
Standard labour price
€100.00/ pcs
Indicative range
€80.00 - €130.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Circulation Pump Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Install circulation pumppcs€100.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a circulation pump does

Circulation pump, central heating pump and circulator all mean the same device. It sends heated water from the boiler to the radiators or underfloor heating loops and returns the cooled water to the boiler. A similar, smaller pump is used on secondary hot water circulation, so hot water reaches the tap straight away rather than after a wait.

The pump is small, but it decides whether heat from the boiler reaches the whole house evenly. Without it, water in a typical modern system with small-bore pipes would barely move. The exception is an old gravity system with large-bore pipes, where water circulates because of the temperature difference. A pump is often added to these as well, so the heating responds faster.

When a circulation pump is fitted and when it is replaced

A heating engineer fits a new pump when a house is built, during a heating refurbishment, for example together with radiator removal and installation, when the boiler is replaced, or when a heat source is added, such as a stove with a back boiler or a heat pump alongside a gas boiler. Consider replacing an older pump if:

  • the pump audibly hums, buzzes or vibrates,
  • some radiators stay cold while the boiler is firing, or the house heats unevenly,
  • the pump cuts out, switches itself off or will not start after the summer,
  • it is an old pump with a manual speed switch that runs flat out all the time.

Why replace a pump that still works? Older types run at the same output all season, even when the house needs less heat. Newer pumps with electronic control adjust their output automatically, are quieter and use considerably less electricity. Standalone circulators have for several years had to meet ecodesign efficiency requirements.

If you have a gas boiler with a built-in pump, as most combi boilers do, the pump must be replaced by a Gas Safe registered engineer. Check the back of their ID card to see which work they are qualified for. In a block of flats with a communal boiler room, the pumps are part of the shared plant. Their replacement is decided by the managing agent or the management company, not by an individual flat owner.

What to clarify before booking a pump replacement

Sorting out these points when agreeing the job with the heating engineer saves a second visit and avoids disputes over the price.

  • Is the pump standalone or part of the boiler? This determines whether a heating engineer or a boiler engineer replaces it.
  • Who supplies the pump? If you buy it yourself, have the heating engineer confirm the model in advance. The new pump must fit exactly between the existing pump valves.
  • Who does the electrical connection? Some heating engineers are qualified for electrical work, others bring in an electrician. Check whether this work is included in the price. All new electrical work should be installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
  • Does the system need flushing or a filter? If an old system has brown water or sludge, it makes sense to deal with it at the same time as the pump replacement.

How to choose the right circulation pump

The heating engineer takes several factors into account. A poorly chosen pump will not work well even if it is fitted perfectly.

Heating or hot water

A heating pump works in a closed system with the same water circulating continuously. A hot water circulation pump moves drinking water, which constantly brings in fresh oxygen. Its body must therefore be bronze or stainless steel. A cast iron heating pump would quickly rust in a hot water supply.

Hot water circulation only needs a small flow to keep hot water in the pipes. The circulation pump is therefore smaller and less powerful than a heating pump, and it is sized by the length of the hot water loop, not the number of radiators. The circulation loop also needs a non-return valve. Some pumps have one built in, otherwise it is fitted separately. Without it, water can flow the wrong way and mixed, lukewarm water may come from the taps.

A timer or thermostat on the circulation pump is also worthwhile, so it does not run all night for no reason. When switching circulation off, however, legionella bacteria must be considered, as they multiply in lukewarm water in the pipes. Stored hot water should therefore be kept hot enough, usually around 60 °C, or be heated up regularly. Agree the settings with the heating engineer.

Output and head

The pump must overcome the resistance of the whole system: pipe lengths, the number of radiators, valves and bends. An oversized pump causes noise in the valves and wastes electricity. An undersized one will not push water to the furthest rooms. A more powerful pump does not automatically mean better heating.

The heating engineer should also consider what happens when all the thermostatic radiator valves close at once, for example on a mild autumn day. Some boilers need a constant minimum flow, so a bypass with an automatic bypass valve is fitted. If the system does not have one and the boiler requires it, the heating engineer adds it during the replacement. A wet central heating system should be designed to BS EN 12828, including its safety and expansion arrangements.

Control and dimensions

Modern pumps usually offer several modes: proportional pressure, which generally suits radiators with thermostatic valves, constant pressure, which is often chosen for underfloor heating, and an automatic mode in which the pump finds its own setting. The exact setting is decided by the heating engineer according to your system and the manufacturer's instructions. If the boiler controls the pump by a signal, the pump must be able to accept that signal.

When replacing a pump, the fitting length and threads must be checked so the new pump fits between the existing valves. For domestic pumps, fitting lengths of 130 and 180 mm are common. The exact dimension is measured on the old pump between the sealing faces.

How a circulation pump is replaced

The procedure differs between a new system and a replacement in existing heating. A typical replacement looks like this:

  1. The heating engineer checks the pipework, isolating valves, expansion vessel and system pressure. The heating is switched off and the system left to cool, so hot water does not escape when the joints are opened.
  2. The pump is isolated electrically and the valves either side of it are closed. If the valves are missing or let by, part or all of the circuit is drained, as described in draining a heating system. For a local repair, pipe freezing is sometimes used, so the whole system does not need draining.
  3. The old pump is removed and the sealing faces cleaned.
  4. The new pump is fitted with new washers. The arrow on the body must point in the direction of flow, the motor shaft must be horizontal and the terminal box must not face downwards, so water cannot drip into it.
  5. The electrical connection is made by a heating engineer qualified for electrical work or by an electrician. A pump connected to the boiler is wired according to the boiler manufacturer's instructions.
  6. The heating engineer opens the valves, refills the system to the specified pressure and bleeds the radiators and the pump itself. Many new pumps have their own venting programme.
  7. The pump mode is set to suit the type of heating and all radiators are checked to make sure they heat up.
  8. After a few hours of running, the joints and pressure are checked. If the pressure has dropped after bleeding, the system is topped up.

Whether the pump goes on the flow or the return depends on the system layout and the boiler manufacturer's recommendation. There is no universal rule.

Replacing a circulation pump: what affects the price

The guide price for labour is €100.00 per piece. It applies to a straightforward like-for-like swap: the new pump has the same length, the valves seal and the pump is easy to reach. The pump and other materials are usually charged separately. The price rises mainly in these situations:

  • Missing or leaking isolating valves. The whole system must be drained, refilled and every radiator bled. A short job becomes several hours of work. New pump valves are often fitted at the same time, which is a further item.
  • A different fitting length on the new pump. The pipework must be cut back or extended, with adaptors and fittings added. This means a modest to noticeable increase depending on the pipe material.
  • Seized old fittings. They crack during removal and must be replaced, sometimes with a section of pipe.
  • A sludged-up system. Flushing the pipework and fitting a filter, such as a magnetic system filter, is a separate job and will increase the price considerably. The scope depends on the size and condition of the system.
  • A missing bypass or non-return valve. If the system needs them and does not have them, the heating engineer adds them as a further item.
  • Electrical alterations or connection to the boiler controls. New supplies, a thermostat or a control signal from the boiler mean extra work for an electrician or boiler engineer.
  • A combined system with several pumps. With radiators and underfloor heating together, the pumps must be matched and set so they do not interfere with each other.
  • Poor access. A pump in an airing cupboard, behind radiator boxing in or other enclosures, in a narrow duct or a cramped plant room takes longer to replace.
  • A new installation rather than a replacement. In a new system the pump is fitted together with valves, fittings and often a mixing valve, so the scope is larger than for a replacement.

When comparing quotes, ask whether the price includes draining and refilling the system, bleeding, the electrical connection and setting the pump mode.

How to speed up a pump replacement

  • Photograph the rating plate of the old pump and send it to the heating engineer in advance. From the model they can work out the dimensions and output and bring the right pump on the first visit.
  • Clear access to the boiler and pump. Remove stored items, open cupboard doors and leave space to put tools down.
  • Have the boiler model and manual to hand if the pump is connected to it. This saves time when wiring to a control signal from the boiler.
  • Make sure the consumer unit is accessible, as well as the drain-off cock, ideally with a drain or outside gully nearby where water can be let out.
  • Switch the heating off in advance if the heating engineer recommends it. The system will cool before they arrive and work can start straight away.
  • Plan the work outside the heating season. The house will not be left without heat in winter. In winter heating engineers often deal with breakdowns and appointments get pushed back.
  • Be present at least at the start and the end. Bleeding means going round every radiator in the house, and at handover the settings should be explained to you.

For other jobs on the same system, see the overview of heating work.

Typical mistakes when fitting a pump and their consequences

Pump fitted against the direction of flow. The heating works poorly or not at all and radiators stay lukewarm. The fault is sometimes not spotted immediately, because some water moves anyway.

Wrong motor position. With a vertical shaft the bearings wear faster and the pump starts to hum. If the terminal box faces downwards, water from a leak can drip into it and damage the electronics.

Old washers reused. The joints drip after a few days, the system pressure drops and limescale marks appear under the pump.

System not bled. The pump is noisy, radiators are cold at the top and a pump running with air in it wears out sooner.

Pump left on maximum output "just in case" or in an unsuitable mode. Thermostatic valves whistle, especially as they close, the pump uses unnecessary electricity and water flow can be heard in a quiet bedroom. The opposite mistake, setting it too low, means distant rooms do not heat up even though the pump and boiler work.

Cast iron pump on a drinking hot water supply. Water from the tap can be discoloured by rust and the pump does not last long.

Hot water circulation without a non-return valve. Water in the loop flows the wrong way, hot water from the tap is lukewarm and heating it uses more energy than necessary.

New pump in a sludged-up system without flushing or a filter. The new pump then starts to hum or seizes after a while. The cause is usually sludge from unflushed pipework, not the pump itself.

Checks at handover of the finished pump installation

At handover, ask to be shown how the pump runs and how it is set. Go through these points:

  • the pump is fitted correctly: the arrow matches the direction of flow, the motor is horizontal and the terminal box does not face downwards,
  • the joints are dry even after several hours of running,
  • the pump runs quietly, without buzzing or vibration,
  • the pressure gauge shows the value stated by the heating engineer,
  • all radiators or underfloor heating loops heat up,
  • there are working isolating valves either side of the pump,
  • on hot water circulation there is a non-return valve in the loop and hot water reaches the tap quickly,
  • the supply cable is secured and does not hang over hot pipework,
  • you know which mode is set and why,
  • you have received the pump manual and warranty documents.

After the first few days of operation, check the pressure gauge again. If the pressure has dropped, air may have remained in the system and since escaped through the air vents, and the system needs topping up.

Frequently asked questions

The guide price for labour is €100.00 per piece for a straightforward replacement with working valves and good access. The price rises when the whole system must be drained, pipework altered, the system flushed or the wiring changed. The pump itself is usually charged separately.