Building work price list: Thermostatic Radiator Valve Replacement
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What a thermostatic radiator valve is and how it is made up
A thermostatic radiator valve (TRV) sits on the flow pipe into a radiator and carries a numbered head. The head senses the air temperature in the room and lets more or less hot water into the radiator. When the room is warm, the wax or liquid inside the head expands, presses on a pin in the valve and closes off the flow. When the room cools, the pin rises and the valve opens again.
The valve has two parts that can be replaced separately. The valve body is the metal part fitted between the pipe and the radiator, and water flows through it. The head is the plastic part with the numbers, which simply fits onto the body. Many faults are solved by replacing the head, without touching the water in the system.
On the other side of the radiator, on the return, there is usually a lockshield valve. Closing it shuts the radiator off on the return side. The flow pipe to the TRV still stays under pressure, so closing the lockshield alone is not enough to replace the valve body.
When replacing the valve is really necessary
A valve rarely fails overnight. It usually shows one of these signs:
- the radiator heats fully even with the head turned to minimum,
- the radiator stays cold while the others in the home are warm,
- turning the head has no effect on the radiator temperature,
- damp, drips, or green or rusty deposits appear around the valve,
- it is an old manual valve without thermostatic control and the home is moving to modern heating controls.
Replacement also makes sense during a refurbishment, when radiators are removed and new ones installed or pipework is changed and the old valve would not suit the new system.
Why does a radiator sometimes not heat at all after the summer? Often the pin in the valve, which the head presses on, has simply stuck. With the head removed, the pin can be pressed and released carefully a few times. If it does not move or water escapes around it, the valve insert is worn. If a different, working head solves the problem, the valve is fine and only the head needs replacing.
A cold radiator does not always mean a faulty valve. Air in the radiator, low system pressure or sludge in the radiator cause the same symptom. If the radiator is cold at the top and warm at the bottom, air is the more likely cause. A heating engineer can tell the difference during a visit, so an unnecessary replacement is avoided.
What to decide and arrange in advance
- What will be replaced: just the head, the valve insert or the whole body. The heating engineer decides this after an inspection, not based on what is on offer at the merchant. A photo of the valve and its connection from the side and the front helps the engineer bring the right part and avoid a second visit.
- Consent in a block of flats with communal heating: the valve body is connected to the shared pipework. Agree the replacement and any draining of the riser with the managing agent or freeholder. This is also a good time to ask for the preset value for that radiator (explained below under valve types).
- Timing: the easiest time to change a valve is outside the heating season. In a block with communal heating the riser is then empty or can be drained easily. In winter it means draining part of the building, which managing agents are reluctant to allow and which leaves neighbours without heat, so the work is planned to keep that time as short as possible.
- Standard or smart controls: if you are considering electronic heads, decide before buying the valve so that it is compatible.
- One radiator or all of them: if all the valves in the home are the same age, the next one will usually fail soon. Replacing several at once saves repeated draining and refilling.
- Who buys the materials: if you buy the valve and head yourself, check the type with the heating engineer.
How the replacement is carried out step by step
For a single radiator the replacement is a short job. A heating engineer usually works like this:
- Assess the condition of the radiator, pipework and threads and decide whether a head, a valve insert or the whole valve body is needed.
- Isolate the water. To replace the whole valve body, the system must be drained at least below the level of the valve, or the riser in a block with communal heating, because the flow pipe stays under pressure even with the radiator closed. The steps for draining a heating system depend on whether it is sealed or open-vented. Without draining, only the head can be changed, and the valve insert only with a special tool for working under pressure. Closing the lockshield valve only helps by reducing the amount of water that comes out of the radiator.
- In a house, switch off the boiler before draining. Only a Gas Safe registered engineer may work on a gas boiler and its gas components, so check the back of their ID card to see which work they are qualified for.
- Place a container and cloths under the valve, because some water will still run out after draining, often dark and with traces of sludge.
- Remove the old valve without damaging the radiator thread or the pipe. On older pipework, corrosion and dirt are cleaned off.
- Fit the new valve with a properly sealed thread. If the body is marked with a flow arrow, it must point in the direction of water flow.
- Set the valve preset, if the valve has one, and fit a compatible head.
- Refill and repressurise the system, bleed the radiator and check all joints for leaks.
- Check that the radiator responds when the head is turned.
Types of valves and heads: what to choose and when
The valve is chosen according to how the radiator is connected, not by appearance.
- an angled valve suits pipes coming out of the wall or floor and turning into the radiator,
- a straight valve is used when the pipe runs straight into the side of the radiator,
- a corner or three-way angled valve lets the head be positioned where there is enough space and it is not hidden behind furniture,
- a valve insert is replaced on bottom-connected radiators that have the valve built into the radiator itself, in which case only the insert is changed, not the whole valve.
In blocks with communal heating, the preset matters. It is a small adjustment on the valve that limits the maximum flow. Once the building has been balanced, each radiator has its own value, known to the managing agent or recorded in the balancing documents. If the new valve is set differently, the radiator may take heat from the neighbours or, on the contrary, heat poorly.
Heads are either mechanical, with a liquid or wax element, or electronic. An electronic or smart head can heat to a schedule, for example more in the morning and evening and less during the day. Most common valves have an M30 x 1.5 thread for the head, and adaptors are sold for other types. If the valve is compatible, moving to smart controls later only means swapping the head.
If the head is behind furniture, a heavy curtain, in a narrow recess or inside a radiator cover or boxing, heads with a remote sensor on a capillary tube are available, and the sensor is fixed to a free spot on the wall.
What the price depends on
The guide labour price is €19.00 per piece. This covers a standard like-for-like replacement of one valve on an accessible radiator. The actual price is mainly affected by:
- How much water has to be drained: replacing the valve body is not possible without draining. In a house it is often enough to lower the level below the valve, while in a block with communal heating the riser or part of the building must be drained. Draining, refilling, bleeding and waiting are added, which can double the time on the job.
- What is replaced: changing just the head is the least work. A valve insert is simpler than the whole body, and if the engineer replaces it under pressure with a special tool, draining is not needed.
- Condition of the old valve and threads: a seized or corroded old valve cannot be loosened without risking damage to the pipe. Freeing it, cleaning the threads or replacing a damaged union adds labour and materials. With sound, rust-free threads the job is quick.
- Connection size: a non-standard spacing or a different connection size means altering the pipework, which turns a short job into a bigger one.
- Access to the valve: a valve behind a cabinet, a bath or right next to the floor takes longer to remove.
- Number of valves: when several valves are replaced together, draining and refilling are done only once, so each valve takes less time. It is worth combining this with bleeding and checking the whole heating system. For owner-occupiers there is no legal inspection cycle, but HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months; for landlords the annual check is a legal requirement.
- Materials: the labour price normally does not include the valve and head. Electronic heads cost considerably more than mechanical ones.
- Urgency: an emergency call-out, for example for a leaking valve in winter, usually costs more than a planned replacement.
What you can prepare
The replacement itself is short, but the surrounding tasks often make it take longer. It helps when:
- the space in front of the radiator is clear, furniture is moved and net curtains or curtains are taken down,
- the floor under the radiator is protected with sheeting and an absorbent cloth, especially wooden floors and carpet,
- in a block with communal heating it is clear who will isolate and drain the riser and when, and who has the key to the plant room,
- in a house you know where the drain-off cock is and how the system is topped up,
- any materials you bought yourself are on site, in the original packaging with the instructions.
Typical mistakes and how they show up later
Loosening the valve body without draining. A closed radiator does not protect against water from the flow pipe. Once the joint is loosened, water under pressure escapes and can flood the home and the neighbours below.
Valve fitted against the direction of flow. On valves that are not bidirectional, the radiator then hums, knocks or regulates poorly, especially when the head is nearly closed.
Preset forgotten or set wrongly in a block of flats. The radiator takes more water than it should and heat goes missing elsewhere in the building. This only shows during the heating season, through complaints from neighbours or weak heating at the end of the riser.
Overtightened joint. It damages the radiator thread. The joint may hold for a few days and then start to weep, sometimes only after the first proper heat-up.
Poorly sealed thread. The joint slowly becomes damp, green or rusty deposits appear and the floor under the radiator gets stained.
Head fitted vertically right above the radiator. Heat rising from the radiator warms it, so the valve closes before the room has warmed up.
Head covered by a curtain or furniture. It measures the wrong temperature and the room stays cooler than the setting.
Incompatible head. It cannot close the valve fully, so the radiator keeps heating slightly even on minimum.
Radiator not bled after refilling. The radiator gurgles and stays cold at the top, even though the valve works.
How to check the finished work
- the valve and union joints are dry even after several hours of heating,
- any flow arrow on the valve points in the direction of water flow,
- the radiator warms up when the head is turned higher and gradually cools on minimum,
- the head is horizontal, freely accessible and not covered,
- the preset matches the value from the managing agent or the balancing documents,
- the radiator is bled and the system pressure is within the range stated by the boiler manufacturer,
- the radiator does not hum or knock when heating,
- the surrounding radiators heat again after the system is refilled,
- the heating engineer has left details of the valve and head type for future servicing.
It is worth checking the joints again the next day and after the first major heat-up of the radiator, using a dry paper towel around the joints.
DIY guide: replacing the thermostatic head only
Leave replacement of the valve body to a heating engineer, as it means working on a system under pressure and a mistake can flood your home and the neighbours. You can change the head yourself, as no water escapes. For other jobs in this trade, see the overview of heating work.
- Turn the old head to the highest number so that it does not press on the pin.
- Undo the locking nut or release the clip and remove the head.
- Check that the valve pin moves freely and that no water is weeping around it.
- Make sure the new head fits the valve, or fit an adaptor.
- Fit the new head in the fully open position and tighten the nut by hand.
- Set the required level and check after a few hours that the radiator responds.
If the pin does not move or water escapes around it, call a heating engineer. To stop the pin sticking over the summer, leave the head turned to the highest number outside the heating season.
Frequently asked questions
As a guide, €19.00 per piece. The price rises when the riser or a larger part of the system has to be drained, when the old valve is seized and hard to loosen, or when the pipework has to be altered. The valve and head are usually paid for separately.
With threads in good condition the replacement itself usually takes about an hour. It can take longer when a larger part of the system has to be drained or the old valve is seized.
Not always the whole system, but to replace the valve body the water must be drained at least below the level of the valve, and in a block with communal heating usually the whole riser. Closing the radiator is not enough, because the flow pipe stays under pressure. Without draining, only the head can be changed, or the valve insert with a special tool the heating engineer has.
The head, yes. Where the flat is on communal heating, the valve body is part of the shared pipework, so agree the replacement with the managing agent or freeholder and have a heating engineer do it.
Yes. A new valve and head improve control on older radiators too, provided the radiator itself does not leak and is not full of sludge.
The head measures the air temperature around it. Under a curtain the air warms up quickly, the head closes the valve and the room stays cooler than the setting.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.