Building work price list: Smart Thermostat Pre-Installation Wiring
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Pre-wire for smart thermostat connection | pcs | €190.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
When pre-wiring for a thermostat is worthwhile
It is most often done in new builds, during a full renovation of a flat or house and when a boiler is replaced, because the walls are open anyway. As part of the wider heating work, the electrician prepares the cable, the back box and, where needed, a power supply. The thermostat can then be connected at any time, even several years later.
It also makes sense if a thermostat is not being bought yet. Cable in conduit is cheap insurance. Chasing walls later, repairing plaster and redecorating cost much more and create a lot of mess in a furnished home.
What the work includes
This is not thermostat installation. It is preparing the route for it. The work typically covers:
- choosing the thermostat position in the reference room, most often the living room,
- fitting a back box into the wall at the correct height,
- laying flexible conduit from the back box to the boiler, heat pump or consumer unit,
- pulling in a control cable with enough cores and spare length,
- preparing a power supply for thermostats that need a separate one,
- with underfloor heating, also preparing a route for the floor sensor and for zone control,
- labelling the cable ends and recording where the route runs.
The conduit has a practical purpose. If the cable is ever damaged or a new thermostat needs a different cable, it can be pulled out and replaced without breaking into the wall.
Pre-wiring does not usually include buying and fitting the thermostat itself, setting it up and pairing it with an app, connecting it to the boiler terminals or replacing valves or actuators on radiators or the manifold. When comparing quotes, it is worth asking exactly what is included in the price per piece and what is charged separately.
What to decide before work starts
Pre-wiring is only cheap and quick if it is done correctly first time. Before the electrician arrives, clarify:
- heat source: gas boiler, electric boiler, heat pump or communal heating in a block of flats. This determines where the cable will run,
- type of control: simple on/off switching, communication with the boiler over a bus (for example OpenTherm or eBUS, depending on the boiler) or zone control with several thermostats,
- number of thermostats: one for the whole home or a separate one for each zone, such as the living room, bedrooms and bathroom,
- furniture layout: where the wardrobe, sofa, television and curtains will go, so the thermostat is not hidden,
- underfloor heating: whether it will be installed, in which rooms and where the manifold will be, because the sensor conduit is laid before the screed is poured.
In a block of flats with communal heating, check with the managing agent or freeholder in advance what control options are available. With an individual boiler in the flat the situation is simpler. If the pre-wiring is only part of a larger alteration, for example removing partition walls, check with local building control whether the wider work needs approval. In Scotland, structural alterations, such as building or removing load-bearing walls, need a building warrant from the council before work starts.
Where to position the thermostat
A thermostat measures the temperature only where it is mounted and controls the heating for the whole home or zone on that basis. In the wrong place, the heating switches off too early or too late.
- an internal wall, not an external wall, which tends to be colder in winter,
- a height of usually around 1.5 metres above the floor,
- away from radiators, fireplaces, cookers, televisions and direct sunlight,
- away from draughts near doors and windows,
- a spot that will not be covered by furniture or curtains,
- for Wi-Fi thermostats, a spot with a good home network signal.
In practice, the back box is often fitted wherever there happens to be space, and only once the room is furnished does it turn out that the thermostat is behind a wardrobe or right next to a radiator. The same applies if radiator boxing in is planned, as the cover changes how heat spreads near the wall. It is therefore worth deciding the position together with the furniture layout.
A simple rule helps: the thermostat should measure the temperature felt when sitting in the room. Bathrooms, kitchens and hallways are less suitable as reference rooms, because the temperature there fluctuates with showering, cooking and opening the front door.
Wired, wireless or zoned thermostat: what to prepare
Wired thermostat
This needs a cable all the way to the boiler. For simple switching two cores are often enough, but thermostats that communicate with the boiler or need power require more. That is why a multi-core cable is run, even if only two cores are connected today.
Wireless thermostat
The wall unit runs on batteries, but there is usually a receiver near the boiler that needs space and a connection to the boiler. It is often powered directly from the boiler terminals, so a separate supply from the consumer unit may not be needed. This can be checked in the receiver and boiler instructions, so that an unnecessary circuit is not installed. It is still worth laying cable to the wall back box in case of a later switch to a wired model.
Zone control and underfloor heating
Each zone has its own thermostat, and the cable runs to the manifold or to a box with the control unit or wiring centre. The floor sensor is laid in conduit in the floor before the screed is poured, so it can be replaced if it fails. Once the floor is screeded, it can only be added by cutting a channel into the screed, which is laborious and risks damaging the underfloor heating pipes.
Which cable and how many cores
The exact cable type is chosen by the electrician according to the boiler and thermostat instructions. In practice a few common principles apply:
- two cores are enough for simple switching and for OpenTherm communication, but a cable with four to six cores is run to leave spare capacity,
- a screened low-voltage control cable is often used for the control signal, as it is less sensitive to interference,
- if the thermostat or control unit needs a 230 V mains supply, this is usually run in a separate mains cable from the consumer unit, not in the same cable as the low-voltage signal,
- spare cable is left at both ends, so it can be connected comfortably and moved later if needed.
How the work is carried out step by step
- Go through the decisions on heat source, type of control and number of thermostats with the electrician.
- Check the boiler manufacturer's instructions and, if already chosen, the thermostat's instructions: number of cores, cable type, power requirement.
- Mark the thermostat position and the route to the heat source or consumer unit.
- Chase or cut channels, fit the back box and lay the conduit. In homes built before 2000, have suspect materials tested before you drill or chase, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Pull in the cable with spare length at both ends and at least one or two spare cores.
- Where a separate supply is needed, run a protected circuit from the consumer unit.
- Insulate and label the cable ends and fit a blank plate to the back box.
- Record the route and the core identification, ideally with photos before plastering.
Alterations to the electrical installation, new supply circuits and work in the consumer unit must only be carried out by a qualified electrician. In England and Wales, a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Connection to the boiler terminals is usually done by the boiler service engineer, also to keep the warranty valid. Any work on the gas side of the boiler must only be done by a Gas Safe registered engineer.
Price of thermostat pre-wiring and what affects it
The guide price for the labour is €190.00 per piece. This covers one thermostat position with back box, conduit and cable on a standard route. The final cost is affected by these factors:
- Condition of the walls: work is fastest in a shell without plaster. In a finished home, chases are cut into plaster or tiles and the surface then has to be made good, which adds significantly to the cost, often more than laying the cable itself. Redecoration or retiling is usually a separate item.
- Route length: the further the thermostat is from the boiler or consumer unit, the more chasing, conduit and cable are needed. A short route within one room is cheaper than one across half the home.
- Obstacles on the route: every penetration through a wall or ceiling, every run through concrete and every diversion around other services adds work. Load-bearing structures must not be drilled or chased without the agreement of a structural engineer, and in a block of flats not without the managing agent's consent.
- Number of zones: with zone control the price is per thermostat position, so three zones mean roughly three times the work, even if part of the route can be shared.
- Separate power supply: a new protected circuit from the consumer unit is extra work. If there is no spare way in the consumer unit, alterations to it are added.
- Floor sensor: conduit in the floor is a small extra job that has to be done before the screed is poured.
- Surface trunking: if chasing is not wanted in a finished home, the cable can run in surface trunking. This is quicker and avoids plaster repairs, but the trunking remains visible.
What makes the work easier and what slows it down
It helps most when the pre-wiring is planned together with the rest of the electrical installation. The electrician can then do it on the same day as the other wiring without a separate visit. Before the electrician arrives, it is worth having ready:
- the thermostat position marked directly on the wall with a marker pen,
- the boiler or heat pump instructions to hand, or at least a photo of the data plate,
- clear access to the boiler and consumer unit, without furniture or boxes in front of them,
- a cleared route along the walls where the chases will run.
The work takes longer if the thermostat position is changed during the job, if it is unclear whether there will be one thermostat or several zones, or if the electrician has to wait for the heating engineer or floor layer who has not yet finished the manifold. With underfloor heating it is important to coordinate the pre-wiring with the screed pour, so the sensor conduit is not forgotten.
Typical mistakes and how they show up later
Thermostat on an external wall or next to a heat source. The thermostat measures the wrong temperature. On a cold wall it heats for too long, while next to a radiator or in sunlight it switches off before the room has warmed up.
Cable with exactly as many cores as needed today, with no spare. When the thermostat is replaced with a model that communicates or needs power, a core is missing and a new cable has to be run or a wireless solution chosen.
Cable plastered directly into the wall without conduit. If it is damaged or a different cable is needed, it cannot be pulled out and replaced. The only option is to chase the wall again.
Control cable run closely alongside mains cables over a long distance. This can cause interference, and the thermostat may then lose its connection to the boiler or behave unpredictably.
Unlabelled ends and no record of the route. Years later nobody knows where the cable ends or which way it runs. There is also a risk of drilling through it when putting up a shelf or picture.
Mixing up low-voltage and mains connections during connection. This can destroy the thermostat or the boiler's control electronics. That is why connection belongs in professional hands.
Missing floor sensor discovered only after the screed is poured. The underfloor heating is then controlled by air temperature only. Adding a sensor later means cutting into the screed with a risk of damaging the pipes.
Back box behind a future wardrobe. The thermostat is inaccessible and measures the temperature in an enclosed space. The fix is a new position and more chasing.
How to check the finished pre-wiring
The check is done before plastering or screeding, while the route is still visible. When handing over the work, confirm that:
- the back box is in the agreed position and at the correct height,
- the cable is in conduit and can be moved within it,
- there is sufficient spare cable at both ends,
- the number of cores suits the planned thermostat and spare cores remain,
- the ends are insulated and labelled and the back box is covered,
- the electrician has tested the cable and confirmed it is continuous,
- with underfloor heating, the sensor conduit is laid and its end is brought out into the box,
- for a new supply circuit, an electrical installation certificate has been issued,
- photos of the route and a written record of the connections are available.
Keep the photos together with the boiler instructions. When the thermostat is connected later, they save the engineer searching and save time and money.
Frequently asked questions
A guide price is €190.00 per piece, meaning per thermostat position. The cost rises mainly with chasing into finished walls and making good, long routes, penetrations through walls and ceilings and a separate supply from the consumer unit.
Yes, especially when an old thermostat is replaced with a new one on existing wiring. It often turns out, however, that a core or a power supply is missing, and then a finished wall has to be chased or a wireless solution chosen.
It is not essential. Knowing the heat source and the type of control is enough. A multi-core cable in conduit covers most common models. If the thermostat has already been chosen, follow the manufacturer's instructions.
Connection to the boiler, the power supply and work in the consumer unit belong to a qualified electrician and the boiler service engineer. Preparatory work, such as cutting chases by agreement with the electrician, is more suitable for DIY.
Not usually for the cable pre-wiring alone. Draining the heating system is only needed if valves, actuators or other parts of the heating circuit are replaced at the same time, for example during radiator removal and installation.
If a new supply circuit is created or work is done in the consumer unit, the electrician should inspect and test the work and issue the appropriate certificate. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. The document is also useful for insurance and when selling the property.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.