Building work price list: Pipe Freezing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What pipe freezing is and how it works
Pipe freezing is a way of temporarily "closing" a pipe where there is no valve. The engineer clamps a freezing head onto the pipe, which cools it hard from the outside. The water inside freezes and forms a solid ice plug that isolates the section being worked on from the rest of the pipework. Work can then be done safely beyond the plug, such as replacing a radiator, a valve or a damaged length of pipe. The whole heating system or water supply does not have to be drained.
Freezing on its own repairs nothing. It is an enabling job that makes another job possible. It is carried out by a plumber or heating engineer with specialist equipment, often the same person who then replaces the radiator or valve. It is one of the smaller tasks within heating work, but it can save a great deal of time on a repair.
When pipe freezing makes sense and when it does not
The service is most often needed in winter, when the household does not want the heating off for the whole house, and in blocks of flats, where draining a riser would affect the neighbours. It is most useful where draining the heating system would mean a lot of work and unnecessary risk. Typical situations:
- replacing or removing a radiator that has no isolating valves,
- replacing an old valve or stopcock that no longer seals,
- connecting a new branch, for example during a bathroom or kitchen refit,
- repairing a leaking section of pipe,
- work in one flat in a building with a shared heating system.
Why do people prefer to avoid draining down? In an older system, draining and refilling loosens sludge and deposits, which then block valves and radiators. The system is more prone to air locks, it takes longer to bleed, and in winter the rooms go cold in the meantime. In a larger system there is also a large volume of water and any added chemicals to deal with.
Pipe freezing does not work everywhere. If the heating contains antifreeze, a plug forms with difficulty or not at all, because the mixture is designed not to freeze. Water that is still flowing also prevents a plug, for example in a cold water supply where someone is running a tap, or in heating with the pump still on. Water pressure in a still pipe is not a problem in itself - what matters is whether the flow can be stopped. A heavily corroded pipe is another problem, as it may not withstand the temperature change. In such cases the engineer will suggest another approach, such as partly draining a single branch.
If there is a working isolating valve nearby that holds reliably, freezing is often unnecessary. In a small house with a modern system and valves on every radiator, it is usually simpler and cheaper to close the valves or drain off only a small amount of water.
What to clarify before booking
The engineer can prepare better and bring the right equipment if given some basic information in advance. It is worth clarifying:
- what is being repaired: a radiator, a valve, a length of pipe or a new branch connection. This determines how long the plug has to hold,
- what the pipework is made of and its size: steel, copper, plastic or multilayer pipe. A photo of the pipe and its surroundings helps, as does any printing on a plastic pipe showing the manufacturer,
- whether the system contains antifreeze: this is common in some houses, holiday homes and certain systems with a heat pump or solar thermal panels. If unsure, tell the engineer in advance,
- who will do the follow-on work: whether it is the same engineer or a separate plumber or heating engineer. Both must be on site at the same time,
- who supplies the parts: the radiator, valve, fittings and seals must be the right size and thread, otherwise work beyond the plug will come to a halt,
- agreement with the managing agent: in a block of flats the riser is shared pipework.
Before any work on a riser, even just freezing, agree a date with the managing agent or the residents' management company. The pump in the plant room or heat interface often needs to be switched off for a while, and that cannot be done without them.
How pipe freezing is carried out
The work itself is not long, but preparation is what counts. An ice plug will only hold if the water in the pipe is not flowing and is not hot. The steps follow in this order:
- Assessment: the engineer checks the material, size and condition of the pipe and chooses a straight, sound section to freeze, not right next to a bend or joint.
- Stopping the flow and cooling down: on heating, the boiler and circulating pump are switched off, or a valve on the branch is closed. The water in the pipework must cool, because warm water freezes much more slowly.
- Fitting the heads: freezing heads are clamped to the pipe, usually one on smaller pipework and sometimes two side by side on larger pipes.
- Freezing: the equipment cools the pipe until a full plug forms inside. A copper pipe of normal domestic size usually freezes in 5 to 15 minutes, a thicker steel pipe in 20 to 30 minutes or more. Plastic pipes take considerably longer.
- Checking the plug: the engineer carefully loosens a joint beyond the plug. First the water trapped in the isolated section between the plug and the radiator or valve runs out. This is normal. When the plug is holding, the water stops completely after a short while. If it keeps running, the plug is not yet complete.
- Repair: the replacement or repair is then carried out. The equipment runs throughout and keeps the plug frozen.
- Thawing and restarting: once finished, the cooling is switched off, the plug is left to thaw slowly and the system is restarted, topped up and bled.
What equipment is used for freezing pipes
Three types of equipment are commonly used. Which one the engineer chooses depends on the pipe size, material and how long the plug must hold. The sizes given are approximate - the exact range is stated by the manufacturer of the particular equipment.
- carbon dioxide from a cylinder is used for short jobs on smaller pipes, typically thin copper and steel pipes in a home. It is simple, but holds the plug only while there is gas in the cylinder,
- an electric freezing machine works much like a fridge. The heads are connected to a compressor and can hold a plug for longer. Standard machines handle domestic pipework up to around 2 inches in diameter,
- liquid nitrogen is used for larger diameters and demanding pipework, for example in plant rooms, boiler houses or commercial buildings.
Steel and copper pipes are routinely frozen. Plastic and multilayer pipes conduct heat less well, so freezing takes longer and needs closer monitoring. For some plastic and multilayer pipes the manufacturer does not recommend freezing or does not permit it at all, as it could damage the material or the joints. It is therefore important to check in advance what the pipework is made of and what the manufacturer says about it.
What affects the price
The guide price for the work in the price list is €50.00 per piece. A piece usually means one frozen point. When booking, it is worth checking whether the price includes call-out, preparation and the time the plug has to hold. The final cost depends mainly on:
- pipe size and material: a thin copper pipe freezes quickly, while thick-walled steel or a larger diameter needs more powerful equipment and more time. With plastic and multilayer pipes the job takes longer because freezing is slower,
- the equipment used: a short job on a small pipe can be done with simpler equipment. Large diameters that need liquid nitrogen are considerably more expensive,
- number of points: if the pipe has to be frozen on both sides of a radiator or on several branches, each point is normally charged as a separate piece,
- access to the pipe: exposed pipework is ideal, while a pipe chased into a wall, behind tiling or behind radiator or pipe boxing, or tight against a wall has to be exposed first. Opening up and making good is usually a separate job,
- whether the flow can be stopped: if the pump can be switched off and the system allowed to cool, everything goes smoothly. If water keeps flowing, the job takes longer or cannot be done,
- condition of the pipework: rusty or previously repaired pipes need a more careful approach and a longer assessment,
- follow-on work: freezing is almost always done together with replacing a radiator, valve or length of pipe. The longer that work takes, the longer the plug must hold. The replacement itself is charged separately in the price list,
- timing: an emergency call-out outside working hours, at weekends or on bank holidays usually costs more than a booked appointment.
What speeds the job up and what delays it
A lot of time can be saved before the engineer arrives. The job goes faster when:
- the new parts have been bought, checked and are ready next to the repair point,
- the person who switches off the pump in the plant room or heat interface is on site at the agreed time or at least available by phone,
- the boiler and pump are switched off well in advance so the water has time to cool before work starts,
- the area around the pipe is clear, furniture is moved and the radiator can be reached from both sides,
- there is a socket nearby for the freezing machine and enough light,
- the floor under the work point is covered and a bucket and cloths are ready, because some water always escapes during a replacement and condensation forms on the heads,
- the neighbours below and on the same riser know when the work will take place.
The job is delayed by a missing part that has to be fetched, a plumber arriving late for the follow-on replacement, or an unavailable managing agent who is the only one able to switch off the pump. All that time the equipment has to keep running to hold the plug.
Common mistakes and how they show up later
Most problems arise not from the freezing itself but from poor preparation. Watch out for these mistakes:
Freezing hot heating pipes or with the pump running. The plug does not form or gives way during the work. Water then runs out of the open pipe and the repair has to be stopped in a hurry.
Freezing in the wrong place. A bend, joint or damaged section is where the pipe is weakest. A crack may not show straight away, but only after the heating is back on, as a damp patch or a drip.
Freezing two points one after the other with a closed section between them. Ice expands, and in a closed section the pressure can rise enough to damage the pipe. The split often appears only after the plug has thawed.
Soldering or welding too close to the plug. The heat melts it and water starts running from the pipe. A gap is therefore kept between the plug and the soldering point, usually at least 30 to 50 cm depending on the pipe size and the equipment manufacturer's instructions. Where this is not possible, press-fit or compression fittings are used, which need no flame.
Speeding up thawing with a naked flame. This can distort the pipe or cause a leak later.
Full pressure and the pump turned on before the plug has thawed. The plug must thaw slowly before full pressure and the pump are restored. Otherwise there is a risk of water hammer and strain on the new joints.
Skipping topping up and bleeding. After restarting, the pressure drops, the boiler may lock out on low pressure, and some radiators heat only at the bottom or not at all.
How to check the finished work
After the engineer leaves, check that the system works as well as it did before. At handover, go through these points:
- the new or replaced joint is dry and does not drip even after several hours of running,
- the point where the plug was shows no visible distortion or crack,
- the pressure on the boiler or system gauge is within the range stated by the boiler manufacturer and does not fall over the following days,
- the radiators are bled and heat evenly across their whole surface,
- the circulating pump is running and there is no gurgling or hissing in the pipework,
- any pipe insulation the engineer removed has been put back,
- the floor and walls under the repair point are dry and clean,
- the engineer has explained exactly what was replaced and what to do if damp appears later.
For the first few days after the work, it is worth checking the joint at least once a day, ideally when the heating is running at full. A small leak often only shows at higher water temperatures.
Frequently asked questions
Around €50.00 per piece, which usually means one frozen point. The price rises with a larger diameter, plastic or multilayer pipe, the need for liquid nitrogen, poor access to the pipe and an emergency call-out. Details are in the price section above.
As long as the freezing equipment is running, the plug is maintained. Once it is switched off the plug starts to thaw, fairly quickly on small pipes. That is why all parts and tools are prepared in advance and the work beyond the plug goes ahead without unnecessary breaks.
Yes, that is when it makes the most sense. The heating is switched off only briefly, while the water in the section cools and the repair is completed. The other radiators stay full and warm up quickly once the system is back on.
Done correctly, it usually will not. A controlled plug is short and the ice can expand towards the open end of the pipe or towards the rest of the pipework. The condition is that the section by the plug is not closed at both ends, for example between two plugs or between a plug and a closed valve. Heavily corroded or already cracked pipes are assessed before the work, and sometimes another method is chosen.
Usually yes, but to a much smaller extent than after draining the whole system. When a radiator is replaced, a little air gets into the system and a small amount of water is lost, so the pressure is checked, topped up as needed and the radiators are bled.
Sometimes, but it takes longer and is not permitted for every material. The manufacturer's instructions for the specific pipe are decisive. If they do not allow freezing, the engineer will choose another method so as not to damage the pipe or the joints.
Pipe freezing kits are available to buy, but a mistake means water in the home, and on heating it can mean hot water under pressure. Assessing the pipe, choosing the freezing point and handling the follow-on replacement of a radiator or valve is a job for a plumber or heating engineer.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.