Building work price list: Pressurising and Bleeding a Radiator
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
What bleeding and pressurising involve and why
A radiator is cold at the top and warm at the bottom, the pipes gurgle and the needle on the boiler pressure gauge keeps dropping. This almost always means air has got into the heating system or it is short of water. Bleeding releases the air from the radiator. Pressurising then tops up the water so the system pressure returns to the correct level. The job is a routine part of heating work.
The two jobs nearly always go together. Bleeding lets out a little water as well, and that water has to be replaced. They are most often done in autumn before the heating season, after removing and installing a radiator or repairing one, and every time the system has been drained.
Air is lighter than water, so it collects at the highest points of the system: the tops of the radiators and the top floor. Where there is air, hot water cannot flow. The radiator then only heats partly and the boiler works harder than it needs to.
Signs that the heating needs attention
- The radiator is only warm at the bottom or does not heat at all, even though the boiler is running.
- Gurgling and bubbling in the radiator or pipes, especially after the heating comes on.
- Low pressure on the boiler gauge or a low-pressure fault code on the boiler display.
- A room colder than the temperature set on the thermostat.
- Frequent topping up, for example every few weeks. This is no longer routine maintenance but a sign of a leak or a faulty expansion vessel. Topping up alone will not solve it, and a heating engineer should be called.
What to clarify before calling a heating engineer
- What kind of heating you have: your own boiler in the house or flat, or communal heating supplied from a plant room or a district heating network. With communal heating, neither you nor a tradesperson should top up the system pressure without agreement - this is handled by the building's maintenance team or managing agent. Arrange it with them in advance, otherwise the visit may achieve nothing. Older open-vented systems with a feed and expansion tank in the loft top up automatically and are not pressurised through a filling loop.
- Whether it is routine maintenance or a fault: if the pressure drops repeatedly, booking a bleed alone is not enough. Tell the heating engineer in advance so the visit can include checking the expansion vessel and tracing the leak.
- How many radiators need bleeding: just the one that gurgles, or the whole house. In a house on several floors it is worth doing all the radiators in one go.
- Condition of the valves: if you know a bleed valve is seized or dripping, say so beforehand. The engineer can bring a replacement.
How to bleed a radiator and pressurise the heating step by step
The heating engineer first releases the air and only then tops up the pressure to its final level. The reverse order makes no sense, because the pressure would drop again after bleeding.
- Switching off the heating: the boiler and circulating pump are switched off and the system is left to stand for a while. The air rises to the top and the water cools a little.
- Checking the pressure: the reading on the boiler pressure gauge is noted, so it is clear what the starting point is.
- Order of the radiators: in a house with more than one storey, work starts on the lowest floor and moves upwards. During bleeding, air in the system is pushed upwards. Starting at the bottom means the remaining air gathers in the highest radiators, which are bled last. In the opposite order, air from the lower floors would later rise into radiators that have already been bled.
- Bleeding: the bleed valve on the radiator, usually at the top corner on one side, is opened slightly. It is opened with a radiator key, or on some types with a flat-blade screwdriver. The valve stays open while air hisses out and is closed once a steady stream of water without bubbles appears.
- Watching the pressure during the work: in a larger system with many radiators, the pressure can fall too low before the job is finished. The engineer therefore checks the gauge between radiators and tops up a little as needed, so the boiler does not lock out.
- Running the pump briefly: after the first round the pump is switched on for a few minutes. This dislodges air trapped in the pipework and moves it into the radiators. The pump is then switched off again, the system left to stand, and the radiators bled in a second round. This is repeated until only water comes out of the valves.
- Pressurising: water is added through the filling loop. This is usually under the boiler or on the pipework next to it, sometimes as a flexible braided hose connected to the cold mains. The water is let in slowly while watching the gauge.
- Closing the filling loop: when the pressure reaches the value specified by the boiler manufacturer, the valves are closed firmly and the hose is disconnected if the instructions require it.
- Start-up and check: the heating is switched on and, once warm, it is checked that the radiators heat across their whole surface and that the pressure holds.
With a typical boiler in a house, the cold system pressure usually sits roughly between 1 and 2 bar. The exact figure is given in the boiler manufacturer's instructions. In a taller house a slightly higher pressure may be needed so the water reaches the highest radiators.
What affects the cost of bleeding a radiator
The guide price for the labour is €12.00 per radiator. The per-radiator price applies to a standard case: an accessible radiator, a working valve and a boiler with a filling loop and a readable pressure gauge. The final amount mainly depends on the following:
- Number of radiators: the price rises with each one. For a single radiator, the call-out makes up a larger share of the bill, so it pays to bleed all the radiators at once.
- Several floors: the whole house has to be covered and bled in several rounds. If air reappears after a few days of running, a return visit adds to the cost.
- Seized or corroded valves: they will not open, or leak once opened. Replacing a valve is extra work and extra material.
- Poor access: radiators behind furniture or inside radiator boxing or covers take longer, and sometimes the cover has to be removed.
- Old system with sludge: dark water comes out of the valve and the radiator still does not heat after bleeding. This is no longer routine bleeding but a question of whether the system needs flushing.
- Repeated pressure loss: this points to a leak or a faulty expansion vessel. Tracing the cause and checking the expansion vessel, pump and thermostatic radiator valves takes more time and is charged separately.
- Combination with underfloor heating: underfloor heating circuits are bled through the manifold. The procedure is more involved and takes longer. If you have it, tell the heating engineer in advance.
What makes the job easier and what slows it down
- Switch the heating off in good time: if the boiler is turned off a few hours before the engineer arrives, the radiators cool and the air collects at the top. With a hot system there is waiting time.
- Have the boiler manual ready: it gives the recommended pressure and the location of the filling loop. With an unfamiliar boiler, time is otherwise spent finding them.
- Describe what you have noticed: which radiator gurgles, how often you top up, and what the gauge reads with the system cold and hot. This shortens the search for the cause.
- Be at home and make all rooms accessible: a locked room or loft means a radiator stays unbled.
- Have cloths and a small bowl ready: they protect the floor and any wooden flooring under the valves.
Common mistakes and how they show up later
- Bleeding with the heating running. The water is hot and the pump drives the air around the system, so not all of it gets out. The radiator gurgles again within a few days.
- Opening the valve too far. A small bleed screw can come right out, and water then sprays onto the wall and floor.
- Closing too early. The valve should only be closed once clear water without bubbles comes out, not after the first spurt. Otherwise air remains in the radiator.
- Only one round of bleeding. Air trapped in the pipes moves into the radiators once the pump runs, and they start gurgling again.
- Forgetting the pressure. After bleeding the pressure stays low and the boiler locks out after a while.
- Over-pressurising. Too much pressure opens the pressure relief valve, which on typical boilers usually lifts at around 3 bar, and water starts to drip.
- Filling loop not fully closed. Water keeps trickling in and the pressure rises on its own until the relief valve operates.
- Frequent topping up without finding the cause. Each lot of fresh water brings in oxygen and minerals that encourage corrosion and sludge. The system gradually clogs and the radiators heat less well.
- Overtightening the valve. The seal or thread is damaged and the valve starts to drip.
How to check the result
After bleeding and pressurising, let the system warm up and go through these points:
- all radiators heat evenly across their whole surface, including the top,
- there is no gurgling or bubbling in the radiators or pipes,
- the cold system pressure is within the range given by the boiler manufacturer,
- once warm, the pressure rises slightly but does not approach the relief valve limit,
- the bleed valves are dry and do not drip,
- the filling loop is closed and no water passes through it,
- the boiler shows no fault code,
- after a few days of running the pressure has not dropped noticeably,
- if the engineer replaced a valve or found a fault, you have been told what was done and what needs attention next.
How to bleed a radiator yourself
In a house or flat with its own boiler, this job can be done without a tradesperson. Nothing on the boiler is dismantled - only the valves intended for the user are opened. The procedure is the same as described above for the heating engineer. With communal heating in a block of flats, the rules in the preparation section and in the questions below apply.
- Have a radiator key or flat-blade screwdriver, a cloth and a small bowl ready.
- Switch off the heating and the pump, wait until the radiators have cooled to at least lukewarm, and note the reading on the pressure gauge.
- Turn the valve slowly, about a quarter to half a turn, no more. When closing, just nip it up, without force.
- Work from the lowest floor upwards and check the gauge between radiators.
- Top up slowly through the filling loop while watching the needle. Close the loop firmly at the manufacturer's value.
- Switch the heating on and after half an hour to an hour check that the radiators heat across their whole surface. Once warm, check the pressure again and repeat the bleeding if necessary.
If the valve will not open, leaks or releases dark water, do not force it - call a heating engineer. If you smell gas, do not switch anything on or off, open windows, leave the premises and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Any work on the gas boiler itself, its burner or its flue must only be carried out by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for.
Frequently asked questions
A guide price is €12.00 per radiator. The cost rises with a seized valve that needs replacing, poor access to the radiator, several floors and tracing the cause if the pressure keeps dropping.
Once a year before the heating season is usually enough. In addition, always after topping up the water, after repairing or replacing a radiator, and whenever a radiator starts gurgling or only heats at the bottom. For owner-occupiers there is no legal inspection cycle for the boiler, but HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months; for landlords the annual check is a legal requirement.
A little water always escapes along with the air, so a slight drop is normal. Small losses also occur at seals and valves. However, if the pressure drops without any bleeding, it indicates a leak or a problem with the expansion vessel, and a heating engineer should be called.
Check that the thermostatic head is open and that the valve pin underneath has not stuck. If the radiator stays cold, the cause may be sludge, a poorly balanced system or a pump problem. In that case it is better to leave the diagnosis to a professional.
It depends on the rules of the building. With communal heating, bleeding a radiator is often allowed, but the system pressure is not topped up by residents - it is handled by the maintenance team or managing agent. Ask the managing agent or the building management before starting.
The boiler manufacturer's instructions decide, or the figure given by the service engineer. Always set the pressure with the system cold, as it naturally rises slightly once warm. A taller house usually needs a slightly higher value than a bungalow.
Most often the system pressure is too high, for example after overfilling or with a filling loop that is not fully closed. If the pressure is not high and the valve still drips, the fault may be in the valve itself or in the expansion vessel, and a heating engineer should be called.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.