Price list 2026 · Europe

Pipe Threading

Pipe threading means cutting a thread on the end of a metal pipe so that a fitting or valve can be screwed onto it. The guide price is around €55.00 per thread. The main factors are pipe diameter, material and access to the pipe.

Updated 09/2026·14 min read·34 price list items
Standard labour price
€55.00/ pcs
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Pipe Threading

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

When a thread is cut on a pipe

A plumber or heating engineer cuts a thread on the end of the pipe and screws on an elbow, a valve, a union or another fitting. This job is typical when repairing older steel pipework or replacing a damaged section. It is also needed when connecting a radiator, a pump or a new valve. In short, it applies wherever something new is joined to existing metal pipework. It is one of the smaller tasks within heating work.

It is most common in older houses and blocks of flats with steel heating pipework or galvanised water pipes. Typical situations:

  • water is weeping from an old joint, and the rusted pipe end has to be cut back and rethreaded,
  • a new radiator has a different size or position, so the tails need shortening or extending,
  • an isolating valve, filter or pump is being added to the system,
  • old steel pipe is being connected to new plastic or multilayer pipework through a threaded adaptor.

Threads are priced individually. One unit is one thread cut on one end of a pipe. If a section with two ends is being replaced, that usually means two threads.

What to decide before the plumber arrives

A lot of time and frustration can be saved if it is clear in advance what is being connected and how the pipework will continue.

  • What is being connected: a valve, radiator, pump or a transition to plastic. This determines the thread size and type, and the fitting.
  • Repair or replace: a new thread lasts only as long as the pipe wall around it. If the surrounding pipework is badly corroded, replacing the whole section is usually more sensible. Sometimes it pays to switch to plastic or multilayer pipe and connect to the old steel at a single point.
  • Where the system can be isolated: check whether the branches have valves, or whether the whole heating system will need draining or the water supply to the whole house turning off.
  • Will the joint be hidden: if the pipe is going into a wall, under a floor or behind radiator boxing, allow for a pressure test before it is plastered over, screeded or covered.
  • Shared pipework: in a block of flats, risers and communal pipework must not be drained or altered without agreement from the managing agent, freeholder or management company.
  • Gas: special rules apply to gas pipework, described below. A general plumber who is not Gas Safe registered must not do this work.

How pipe threading is done, step by step

Before any cutting starts, the system must be depressurised. For heating, this means at least draining the heating system or the affected branch. For water, the supply is turned off and the lowest tap opened. The tradesperson then works roughly as follows:

  1. Cutting: the pipe is cut square, ideally with a pipe cutter, so the end is straight. A corroded end is cut back to sound metal.
  2. Cleaning: burrs are removed inside and out, and rust and old paint are cleaned off the surface.
  3. Fitting the die: a die head of the correct size is fitted and the pipe is coated with cutting oil.
  4. Threading: the thread is cut with an even motion. With hand tools, the die is backed off slightly every short stretch to clear the swarf.
  5. Checking: the thread is cleaned, its length and finish are checked, and a fitting is test-screwed on.
  6. Sealing: the thread is sealed with hemp and jointing compound, thread sealing cord or PTFE tape. The sealant is wound in the direction of the thread and the joint is then tightened. The pipe is held with a second wrench so that another joint further along does not work loose.
  7. Refilling and testing: the system is refilled, bled in the case of heating, and the joint is checked to make sure it stays dry under pressure.

Oiling and starting the die square are very important. If the die runs on at an angle, the result is a drunken thread. The fitting then sits askew and the joint tends to leak. Without oil the thread tears, leaving a rough surface that is hard to seal.

Which thread type is used and why

Water, heating and gas pipework in the UK uses pipe threads in imperial sizes, generally referred to as BSP. In practice the following designations matter most:

  • R (often called BSPT): an external taper thread cut directly on the pipe. It tightens as it is screwed in and seals in the thread together with the sealing material. This is the standard thread on steel pipework for all three services,
  • Rp: an internal parallel thread in fittings, into which the R taper thread is screwed,
  • G (often called BSPP): a parallel thread that does not seal on its own. It is used where a flat washer or O-ring makes the seal, for example on unions, radiator valve tails and pumps.

Internal threads are almost always factory-made in fittings and valves. Cutting an internal thread on site is rare. What matters is that the thread type and size on the pipe and on the fitting match. If in doubt, the valve manufacturer's technical data sheet will help.

The nominal imperial size of a pipe does not correspond to its actual outside diameter. It is a traditional nominal designation. When buying a fitting, do not measure the pipe with a tape and guess. The safest option is to take the old fitting along or leave the choice to the plumber.

Materials: what can and cannot be threaded

Black steel pipe is the classic material in older heating systems. It threads well by hand or machine and gives a strong joint that can be taken apart.

Galvanised pipe is often found in water pipework in flats and older houses. Cutting a thread naturally removes the zinc coating at the thread. Good sealing is therefore important to protect the thread from moisture. Galvanised pipe should not be welded or heated, so threading is the natural choice.

Stainless steel pipe is harder and tougher on tools. It needs sharp dies suitable for stainless steel and usually machine threading.

Plastic and multilayer pipes, copper pipes and thin-walled steel press-fit systems are not threaded. These use press, compression or soldered joints, or threaded adaptors. Badly corroded pipe is also unsuitable, as the wall left after threading would be too thin.

Hand or electric pipe threader

A ratchet die stock is enough for smaller diameters and a few threads, for example a repair in a bathroom or a radiator connection. Its advantage is that it fits into tight spaces where a machine cannot be set up.

An electric pipe threader or pipe threading machine is used for larger diameters, harder materials and a larger number of threads. The threads are more consistent and the work is faster. There is less strain on the pipe and on the wall the pipework is fixed to. If a section can be removed, the tradesperson sometimes prefers to cut it out, thread it on the machine and refit the finished piece.

What affects the price of a thread

The guide price for the labour is €55.00 per thread. The difficulty, and therefore the final price, depends mainly on:

  • Pipe diameter: the smaller sizes common in homes are quick to cut, even by hand. Larger sizes need more force, a bigger die head or a machine, and the price per thread is noticeably higher.
  • Number of threads: with a single thread, the call-out and preparation make up a large part of the price. With several threads at once, each one usually works out cheaper.
  • Material: stainless steel and old hard pipes are harder to cut, wear dies faster and make the job more expensive.
  • Access: a pipe close to a wall, in a corner, behind a boiler or in a duct cannot easily be worked with a ratchet. Sometimes the section has to be cut out, threaded on a machine and refitted, which takes longer.
  • Condition of the pipework: a corroded or scaled-up end must be cut back to sound metal and often extended with a new length of pipe.
  • Freeing the old joint: in practice, the most time often goes not on the thread itself but on undoing a seized old joint and preparing the area.
  • Draining and refilling: draining, refilling and bleeding the heating, or turning off the water to the whole house, adds extra work.
  • Service: water, heating and gas have different testing requirements. Gas work adds a tightness test and safety check, which are charged separately.

Fittings, valves and sealing materials are usually listed separately in a quote. When comparing quotes, it is worth asking whether the price per thread includes draining, refilling and a pressure test.

Water, heating and gas: points to watch

For drinking water, only sealing materials approved for potable water should be used, meaning compounds and cords marked accordingly. The thread must be clean, free of oil and swarf that could get into the pipework.

In heating, the joint is stressed by temperature and repeated heating and cooling. The sealant must be suitable for heating systems. The joint must not be overtightened, or the fitting may crack. If the pipework is then chased into a wall or floor, every concealed joint must be pressure tested before plastering.

On gas, threads may only be cut and joints made by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. The work is followed by a tightness test and safety check. Altering gas pipework may also require agreement from the gas supplier or network operator. Domestic gas pipework should be installed and tested to BS 6891:2015+A1:2019 by a Gas Safe registered engineer. Whether any notification or approval is needed under local building regulations should be confirmed with the engineer carrying out the work.

If you smell gas, do not use naked flames and do not smoke. Do not switch lights or appliances on or off, and do not use doorbells. If it is safe to do so, turn off the gas at the emergency control valve. Open windows, leave the property, and only once outside call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

How to prepare for the plumber's visit

The plumber works faster without having to fight their way to the pipe first. It helps to have ready:

  • clear space around the work area, such as an emptied cupboard under the sink, furniture moved away or a cover removed,
  • information on where the main stopcock is and where the drain-off cocks and valves on the heating are,
  • for heating, the boiler switched off and cooled down so that the system can be drained safely,
  • a socket nearby for an electric threader, and space for the machine or a vice if a section is to be removed,
  • in a block of flats, an agreed shutdown time and a notice for neighbours,
  • a clear agreement on who is buying the fittings and valves, so the job does not stop for a missing part,
  • the floor protected from water and cutting oil, for example with an old blanket and plastic sheeting, plus buckets or a hose for the drained water.

The job takes longer when it turns out on site that a branch cannot be isolated, a valve on the riser is passing, or a different fitting size has to be found. If you are not sure what pipework you have, send the plumber a photo of the area in advance.

Typical mistakes and how they show up later

A thread cut at an angle. The fitting sits askew and the valve or radiator cannot be connected without strain. Sooner or later the joint starts to drip. Tightening does not help, and the thread has to be cut off and redone.

Cutting without oil or with a blunt die. The thread teeth are torn and rough. The joint is hard to seal and may leak straight after filling or only after several heating cycles.

A thread that is too short or too long. A short thread does not hold or seal. A long one lets the fitting be screwed too far and overtightened. A lot of bare thread is then left exposed beyond the fitting, and it rusts.

An overtightened joint. A taper thread forced too far spreads the fitting. A cast iron or brass fitting may crack, sometimes only later when the heating warms up.

Poor sealing. Hemp wound against the direction of the thread bunches up as the joint is screwed together. Too much hemp spreads the fitting, too little PTFE tape does not fill the thread. The result is a drip or a slow weep, betrayed by a rust stain.

Joining G to R without the correct seal. A parallel thread does not seal by itself. Without a flat washer or O-ring, the joint leaks even when fully tightened.

A thread on a thin, corroded wall. The joint holds at first, but the pipe is weakest at the thread. Over time a crack or pinhole may appear there.

Swarf and rust in the pipework. Debris from cutting is carried by the water into valves, thermostatic heads, taps or the pump. There it blocks strainers and causes leaks.

Tightening without holding the pipe. The pipe turns and loosens another old joint further along. That joint then starts leaking in a place nobody touched.

Covering a joint without testing. A leak only shows as a damp patch on the plaster, and the repair means cutting into the wall.

How to check the finished thread and joint

For reference: on common 1/2" and 3/4" sizes, the working length of the thread is roughly 15 to 17 mm. On a tightened joint, about one to two thread turns usually remain visible. When signing off the work, look at the following:

  • the thread is smooth, with no torn teeth or burrs,
  • the fitting or valve sits straight, not at an angle,
  • not too much thread or sealant protrudes from the fitting,
  • the surrounding old joints are dry and have not moved,
  • for water, the pipework was pressurised and the joint stayed dry,
  • for heating, the system was filled, bled, and the pressure gauge did not drop during the test,
  • valves and radiators open and close, and the heating works once warmed up,
  • for gas, there is a record of the tightness test and a safety check certificate,
  • the area is cleaned of oil and swarf.

It is worth checking a heating joint once more after the first proper heat-up and cool-down. A dry piece of kitchen roll placed under the joint will reveal even a very slow weep.

DIY guide: threading a removed section of pipe

A capable DIYer with a hired pipe threader can cut a thread on water or heating pipework. It is easiest on a length of pipe held in a vice. Gas pipework and communal pipework in a block of flats are not covered by this guide. If you are unsure about the condition of the pipework, or the pipe moves in the wall, call a plumber. If a radiator has to come off to reach the pipe, see radiator removal and installation.

  1. Turn off the water or drain the affected heating branch and open the lowest tap so that no pressure remains in the system.
  2. Undo the unions at the ends of the section and remove it. If the joints will not undo, carefully cut the section out and allow for extending it with a new length of pipe.
  3. Clamp the pipe in a pipe vice and measure where to cut so that the section fits exactly once refitted.
  4. Cut, clean, oil and thread the pipe as described in the step-by-step section above.
  5. Screw a fitting on by hand as a test and check the thread length against the guide figures in the checking section.
  6. Clean the thread thoroughly of oil and swarf, taking particular care on drinking water pipework.
  7. Refit the section, seal the threads with material suited to the service and tighten the joints. Hold the pipe in the wall with a second wrench while doing so.
  8. Refill the system slowly, bleed it if it is heating, and watch the joints under pressure and after the system has warmed up.

Frequently asked questions

The guide price is around €55.00 per thread. The final amount depends on the pipe diameter and material, access, the condition of the pipework and whether the heating has to be drained and refilled. Fittings and gas testing are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.