Gas / electric boiler removal

Boiler removal means disconnecting an old gas or electric boiler from the gas or electricity supply, the heating system and the flue, then taking it away. The guide price is €110.00 per boiler. Boiler type, access and the condition of the joints affect the cost most.

Updated 09/2026·10 min read·34 price list items
Standard labour price
€110.00/ pcs
Indicative range
€88.00 - €143.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Gas / electric boiler removal

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What boiler removal involves and when it is needed

The old heat source is safely disconnected from the gas or electricity supply, the heating water and the flue. It is then taken off the wall or carried out of the plant room. Removal is most often needed when an old boiler is replaced, or when a home switches to a heat pump or a heat network. It is also done during renovations, when the boiler is in the way and has to be moved. Removal is usually the first step of wider heating work.

A typical wall-hung combi or system boiler usually takes a few hours. A heavy floor-standing boiler in a cellar can take a full day.

What to decide before booking boiler removal

Disconnecting the boiler is a fairly short job. Problems usually arise when the next steps have not been agreed in advance. Clarify these points before booking:

  • What replaces the boiler: a new boiler in the same or a different position, a heat pump, a heat network connection, or nothing. This decides which pipes are capped, which are removed and what happens to the flue.
  • Who installs the new heat source: if one company handles both removal and installation, the work follows on without a gap and one contractor is responsible for the result. With two companies, agree in what state the pipework should be left.
  • Timing: outside the heating season, a day or two without heating is not a problem. In winter the house cools quickly, so the new boiler should follow as soon as possible.
  • Hot water: if the boiler also heats domestic hot water, there will be no hot water once it is disconnected. For a longer gap, arrange an alternative.
  • The wall behind the boiler: brackets, wall plugs and marks on tiles or plaster will remain. Agree whether the engineer only removes them or whether a plasterer or tiler will make good the wall. If pipework is left exposed, boxing in can be planned at the same time.
  • The flue or chimney: if a new appliance is to use an existing flue or chimney, it must be checked by a qualified person before connection.
  • Approvals: if the gas pipe route, the chimney or the flue position changes, check the requirements with the installer and local building control in advance.
  • Flats: notify the managing agent or freeholder well in advance. This matters especially with a shared flue or when the gas has to be turned off briefly to several flats.
  • Disposal: decide whether the company takes the old boiler away or whether it will be disposed of separately.

Who may remove a gas or electric boiler

In the United Kingdom, a gas boiler may only be disconnected by a Gas Safe registered engineer. This rule protects life and property. Incorrect disconnection of the gas pipe can lead to a gas leak and an explosion. A poorly sealed flue can let combustion gases, including carbon monoxide, back into the room.

After the work, the engineer should provide a written record of the appliance disconnection and the tightness test. This record is useful when the new boiler is installed and at later safety checks. The managing agent or freeholder may also ask for it.

If gas will no longer be used at all, ask the energy supplier how to close the supply and what happens to the gas meter. The meter does not belong to the homeowner, so its removal is not handled by the engineer who removed the boiler.

If gas can be smelled, do not use light switches or naked flames, open the windows, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Call the gas network, not the energy supplier.

An electric boiler has a high power rating and is usually connected to its own dedicated circuit from the consumer unit. It should only be disconnected by a qualified electrician. The electrician identifies the correct circuit breaker and switches it off, confirms that the cable is dead and then safely terminates the cable or disconnects it at the consumer unit.

It is worth having the breakers and supply cables checked at the same time. If another heat source follows, such as a heat pump, the electrician can assess straight away whether the supply and protection are adequate.

One point is often overlooked: electric heating is frequently linked to an off-peak electricity tariff. After the boiler is removed, check with the electricity supplier whether the tariff still suits the home or should be changed.

How removal is carried out step by step

The process is similar for gas and electric boilers. The main difference is what the boiler is disconnected from. The engineer usually proceeds as follows:

  1. Inspects the boiler, the connections and the route out of the property. Covers the floor under the boiler, as some water always escapes when pipes are disconnected.
  2. Switches the boiler off, isolates the electrical supply and confirms that the terminals are dead.
  3. For a gas boiler, closes the appliance gas valve and checks the main gas valve at the meter.
  4. Disconnects the gas pipe, caps it immediately and carries out a tightness test. Only then is the boiler handled further.
  5. Closes the isolating valves on the heating pipework and drains the water from the boiler or, if necessary, the whole system.
  6. Disconnects the cold mains and hot water connections if the boiler also heats domestic hot water.
  7. Disconnects the heating flow and return pipes and labels each one so the new boiler is connected correctly.
  8. Disconnects the controls, room thermostat, sensors and other accessories. On a condensing boiler, the condensate pipe is also disconnected.
  9. For a gas boiler, disconnects the flue.
  10. Caps or closes the ends of the water and heating pipes.
  11. Releases the boiler from its wall bracket or the floor and carries it out safely, a larger boiler in sections if needed.
  12. Seals or covers the flue opening, removes the waste and cleans up.

If the new boiler is not fitted straight away, the system must be left safe: the gas capped, the cable safely terminated and the pipework closed.

What affects the cost of boiler removal

Removal is priced per boiler. The guide labour price is €110.00 per boiler. This applies to a standard case: a wall-hung boiler, good access and simple connections. The following factors increase the cost:

  • Boiler type and weight: a wall-hung boiler is the simplest. An old floor-standing cast iron boiler is heavy and is often dismantled, so the work can take several times longer.
  • Draining: without working isolating valves under the boiler, the whole system has to be drained. Refilling and bleeding are then added.
  • Condition of joints: corroded or seized fittings sometimes have to be cut. This adds time and capping materials.
  • Complexity of connections: several heating zones, a hot water cylinder, a solar circuit or more complex controls mean more disconnecting and labelling.
  • Access and carrying out: a cellar plant room with a narrow staircase, an upper floor without a lift, or a boiler built into kitchen units. Sometimes a second person is needed.
  • Flue and chimney: a concentric flue is disconnected quickly. Removing an old flue liner from a chimney is a separate, more expensive job.
  • Asbestos: an old flue pipe may be made of asbestos cement. It must be handled by a specialist asbestos contractor, never as a DIY job.
  • Additional tasks: taking the boiler away, disposing of water containing inhibitor or antifreeze, removing a cylinder, stripping out old pipework or making good the wall are often charged separately.

When comparing quotes, ask what the price includes. Some quote only for disconnection and removal from the wall. Others include the tightness test with a record, carrying out, collection and disposal.

DIY boiler removal: what can be prepared in advance

Do not disconnect a boiler from the gas or electricity supply yourself. However, preparation can save the engineer time and prevent delays:

  • empty cupboards and the area around the boiler and clear the route out, including the hallway and stairs,
  • make the main gas valve and the consumer unit accessible, ideally with labelled circuits,
  • gather the boiler and pipework documentation, the latest service and safety records and the meter details,
  • photograph the existing boiler and control wiring for the installer of the new heat source,
  • be available during the work, or leave someone on site who can make decisions if an unexpected problem arises.

Common mistakes and how they show up later

Disconnecting gas without capping and a tightness test. A leaking cap can release small amounts of gas for weeks. Without a test record, the engineer installing the new boiler also has nothing to work from.

Unlabelled heating pipes. When reconnecting, the flow and return or individual zones are mixed up. Some radiators stay cold or the boiler shows fault codes.

Water with antifreeze poured down the drain. Antifreeze does not belong in the drains. It should be taken for proper disposal.

A forgotten flue opening. An open or poorly sealed opening draws heat out of the room and can let rain in. With a shared flue, combustion gases from neighbours can enter the flat.

An electric boiler cable left with only the breaker switched off. Someone later switches the breaker back on and the loose cable is live. The cable must be safely terminated or disconnected at the consumer unit and the circuit labelled.

An old boiler left next to the bins. The appliance ends up fly-tipped and responsibility stays with the owner.

Overlooked worn parts. Removal often reveals leaking joints, sludged pipework or worn valves. Replace them while the system is drained, together with any radiator removal and installation that is planned. Otherwise the system has to be drained again after the new boiler is commissioned.

Disposing of the old boiler

An old boiler does not belong in general household waste. The disposal route depends on the type of boiler:

  • A boiler with electronics, which includes most wall-hung gas boilers and all electric boilers, counts as electrical waste. Hand it in whole and do not dismantle it. It can be taken back by the retailer when a new boiler is bought, accepted at the local household waste recycling centre or handled by an authorised treatment facility.
  • An old cast iron boiler without electronics is mainly scrap metal. A scrap metal dealer or recycling centre will accept it. If the engineer breaks it into sections, this is only to get it out of the property.

The recycling centre can confirm its acceptance conditions. The simplest option is to agree that the company handles collection and disposal. Before the old boiler or other renovation waste is handed over, check that the carrier is registered with the Environment Agency and ask for a waste transfer note, as householders have a duty of care to make sure their waste is disposed of correctly.

How to check the finished work

Before signing off the job or paying, check the area where the boiler was:

  • the gas pipe is capped and there is a record of the appliance disconnection and the tightness test,
  • the supply cable is safely terminated or disconnected at the consumer unit and the circuit is labelled,
  • the heating pipes are closed, capped or clearly labelled for the new boiler,
  • the cold and hot water pipes are closed or capped and not leaking,
  • no water is dripping from the pipework and the floor is dry,
  • the flue opening is sealed or ready for a new flue,
  • the old boiler has been taken away and it is clear where it was disposed of,
  • the area is clean and ready for the new appliance to be fitted.

Frequently asked questions

No. Disconnection from gas must be done by a Gas Safe registered engineer and disconnection from electricity by a qualified electrician. The homeowner can prepare the area and the documents as described above.