Oxy-fuel Welding of Metal Pipework

Oxy-fuel welding permanently joins steel heating pipework using an oxy-acetylene torch. The guide price is €20.00 per piece, meaning per weld. Access to the joint and the condition of the pipes have the biggest effect on the cost.

Updated 09/2026·11 min read·34 price list items
Standard labour price
€20.00/ pcs
Indicative range
€16.00 - €26.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Oxy-fuel Welding of Metal Pipework

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

How oxy-fuel welding works and when it is needed

A weld replaces threaded joints and couplings. The welder heats the joint with a torch that burns a mixture of oxygen and acetylene. The flame reaches roughly 3,000 °C, the metal melts, and once it cools the result is a strong, watertight joint.

This work comes up most often when an older system is being refurbished as part of wider heating work:

  • a corroded or leaking length of pipe needs replacing,
  • a radiator is being moved, for example under a new window or after a layout change, which usually goes hand in hand with radiator removal and installation,
  • new pipework is being connected to existing steel pipe runs,
  • the connections of a boiler, manifold or pump to steel pipework in a plant room are being altered.

The price list counts the work per piece, meaning per weld. Replacing one straight length usually means two welds, one at each end. Moving a radiator or adding a new branch involves more, depending on the number of bends and tees.

When a flame is suitable, when it is not, and what to decide beforehand

Oxy-fuel welding works best on thin-walled steel pipe of smaller diameters. In UK homes copper is the most common heating pipe, but steel pipework is still found in older systems, larger houses and older blocks of flats. The welder can control the heat precisely, so a thin wall is less likely to be burnt through. The torch also needs no electrical supply and can reach tight spots behind a radiator or under a plant room ceiling.

In older buildings there is another advantage. Original pipes often have sizes that modern press fittings do not match, or are so weakened that they would not withstand pressing. A weld connects the new section directly to a sound part of the old pipe. In homes built before 2000, have suspect pipe lagging tested before work starts, as asbestos lagging must be removed by an HSE-licensed contractor.

In these cases a different method is chosen:

  • thick-walled and large-bore pipework in plant rooms is usually arc welded, which is faster on heavy material,
  • copper pipes are almost always soldered or brazed in practice. A flame is used here too, but the copper is not melted,
  • galvanised pipework, typical of old water supply runs, is not welded in domestic installations. The zinc vaporises when heated and gives off harmful fumes, and the joint loses its corrosion protection. These pipes are connected with threads or adaptor fittings,
  • gas pipework may only be worked on by a Gas Safe registered engineer, and domestic gas pipework should be installed and tested to BS 6891:2015+A1:2019. It is not ordinary heating work, so check the back of the engineer's ID card to see which work they are qualified for.

Before placing an order, clarify the following:

  • How long a section to replace. A pipe corroded in one spot is often weakened a little further along as well. Ask the welder to inspect the pipe and decide where the wall is still thick enough. Replacing a slightly longer piece costs less than coming back to another leak a few months later.
  • Whether the pipework stays on the surface or goes into the wall. Chasing it in adds cutting chases, making good and plastering. Exposed pipes can also be concealed later, for example as part of radiator boxing in.
  • Whether to weld or press. The two can be combined: the connection to the old pipework is welded and the run continues in another system via an adaptor.
  • Timing. The heating must be switched off and drained. This is easier outside the heating season; in winter, expect the property to cool down while the work is carried out.
  • Who drains and refills the system. With an individual boiler the welder or heating engineer can do it; with communal heating in a block of flats it is arranged by the managing agent.

In a block of flats the heating riser is part of the common parts of the building. Do not alter it without the consent of the managing agent, freeholder or residents' management company, even if it runs through your flat. For a larger heating alteration, such as a change of heat source or layout, check whether any approval is needed under local building regulations. A simple repair to a section of pipe does not usually need approval, but if in doubt, ask.

How the work is carried out step by step

The welding itself takes less time than most people expect. Most of the time goes on preparation and checking.

  1. Shutting down and draining: the boiler is switched off, the system is left to cool and the water is drained at least from the part being welded - see draining a heating system.
  2. Protecting the surroundings: combustible items are removed, the floor and walls are covered with a non-combustible mat or metal sheet, and a fire extinguisher is made ready.
  3. Cutting and cleaning: the damaged section is cut out and the pipe ends are cleaned of rust, paint and grease back to bright metal; the edges are prepared if needed.
  4. Fitting and fixing: the new piece is fitted accurately and held in place so the joint stays in line and does not move during welding.
  5. Preheating: the flame is set to suit the wall thickness and the joint is heated evenly all the way round.
  6. Welding: the joint is welded with a steady movement around the pipe, with filler wire as required.
  7. Cooling: the weld is left to cool naturally and is not quenched with water.
  8. Inspection and pressure test: the weld is inspected, then the system is filled, bled and pressurised. The test pressure is usually higher than the working pressure, but must not exceed what the boiler, expansion vessel and safety valve can withstand, so these components are isolated for a higher-pressure test. The pressure is monitored for at least half an hour to an hour and must not drop.
  9. Fire watch after the work: the work area is watched afterwards to make sure no dust or insulation is smouldering.

If the pipework is to be chased into a wall or floor, this is done only after a successful pressure test. A leaking weld hidden under plaster is much harder to find than one that is still visible.

Cost of oxy-fuel welding of pipework: what it depends on

The guide price for labour is €20.00 per piece. This means one weld on an easily accessible small-bore heating pipe. The total for the job depends mainly on the number of welds and how demanding each one is.

  • Number of welds: a straight section means two welds; moving a radiator with bends and tees can mean several times as many. When comparing quotes, ask how many welds the welder is pricing for.
  • Access to the joint: the easiest is a free-standing pipe that the torch can be taken all the way round. A joint tight to a wall, in a corner, behind a radiator or under a ceiling takes much longer and usually costs more.
  • Condition of the pipework: heavily corroded pipe takes longer to clean, and sound metal has to be found. This often leads to a longer replacement section and more material.
  • Diameter and wall thickness: a larger diameter means a longer weld and more heat. For thick-walled pipe, arc welding may be more suitable.
  • Protecting the surroundings: timber cladding, suspended ceilings, cabling or plastic pipework nearby must be protected or temporarily removed.
  • Extent of draining: in a house with valves close to the work area, only part of the system is drained. Draining a whole riser in a block of flats is usually charged separately.
  • Follow-on work: cutting chases, making good, plastering, new pipe insulation or painting are not part of the weld and should appear in the quote as separate items.
  • Materials: pipes, bends and fittings are usually charged separately. Agree whether the welder or the customer supplies them.

What makes the job easier and what slows it down

A lot of time can be saved before the welder arrives. It helps if:

  • the area around the pipework is cleared of furniture, curtains, cardboard and other combustible items, including on the floor beneath the joint,
  • there is clear access to the boiler, isolating valves and drain-off cock, and their location is known,
  • in a block of flats, the date for draining the riser has been agreed in advance with the managing agent and the neighbours are aware of it,
  • the room can be ventilated, as welding produces smoke and fumes,
  • it is clear where the drained water will go and how far a hose needs to run,
  • radiators, valves or fittings are ready on site if they are being supplied by the customer.

The job takes longer if it turns out on site that the valves are passing and a larger part of the system has to be drained, or if the managing agent has not confirmed the draining date. Unnecessary waiting also happens when the system cannot be refilled after welding, for example because a radiator is missing.

Safety and fire protection

Oxy-fuel welding is work with an open flame and pressurised gas cylinders, so it belongs exclusively in the hands of a trained and competent welder. It is not a job for DIY. A qualified welder knows not only the technique but also the fire safety rules for hot work in buildings, which cover preparing the work area, having a fire extinguisher at hand and keeping watch after the work is finished.

For welding in a building away from a permanent welding area, a written hot work permit is commonly required, often by insurers or building managers. It sets out how the work area will be made safe and how long the fire watch afterwards will last, usually several hours. Ask the welder beforehand who will prepare the permit and who will carry out the fire watch.

The fire watch is there for a reason. Sparks and hot metal can ignite dust in a chase, insulation or timber behind a wall with a delay, so a fire sometimes only becomes apparent after the welder has left. If smoke or a burning smell is noticed that day, check the area immediately.

If gas is smelt during the work, stop immediately, ventilate the area, do not switch any electrical appliances on or off, and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

Typical mistakes and how they show up later

Pipe ends not cleaned properly

Rust and paint cause porosity in the weld. The joint may still pass the pressure test, but over time it starts to weep, often only after several weeks of heating.

Burn-through

On thin pipes this happens when the flame is too strong or stays in one place too long. The result is a hole, or molten metal left inside that narrows the bore and restricts water flow.

Lack of root fusion

The joint looks neat from outside, but inside the metal is not fused through the full wall thickness. Such a weld can crack with temperature changes as the pipes expand and contract.

Weld made on weakened pipe

The joint is sound, but the corroded pipe a little further along soon fails. This shows up as a new leak next to the repaired spot.

New piece fitted out of line

If the new piece is not properly held before welding, the pipework ends up bent or sagging. Air then collects at the high point and radiators heat unevenly.

Weld quenched with water

Rapid cooling can cause fine cracks in the weld, which only show up later as weeping.

Chasing in without a pressure test

A leak shows up as a damp patch on the wall, flaking plaster and a pressure drop on the boiler. The repair means cutting out, a new weld and fresh plaster.

How to check the finished work

  • the weld is continuous around the full circumference of the pipe, with no holes, cracks or visible porosity,
  • the joined pipes are in line and the pipework is not bent or sagging,
  • the surroundings are not scorched and the floor and wall protection did its job,
  • the system was filled, bled and passed a pressure test with no pressure drop,
  • after the heating is switched on, the joints stay dry at working temperature,
  • the radiators heat up evenly and there is no gurgling of air in the system,
  • the pressure on the boiler gauge does not drop after several days of operation,
  • the number of welds on the invoice matches what can actually be seen on the pipework.

Frequently asked questions

The guide price is €20.00 per piece, meaning per weld. Poor access to the joint, heavily corroded pipes, protection of the surroundings and draining a larger part of the system all increase the final price. Materials and follow-on work are charged separately.