Building work price list: Expansion Vessel Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What an expansion vessel does and when it is needed
An expansion vessel absorbs changes in the volume of water in a heating system. Water expands as it heats up. Going from cold to normal heating temperature, the increase is a few per cent. In a sealed system without a vessel, the pressure would rise sharply and the pressure relief valve would discharge water. An expansion vessel is fitted or replaced on a new heating system, with a boiler replacement, when the system is extended, or when the old vessel stops working. The work is part of wider heating work and is usually done by a heating engineer.
A typical expansion vessel for a sealed system has a steel shell with a rubber diaphragm inside. Heating water sits on one side of the diaphragm and gas, usually air or nitrogen, on the other. As the water heats up, it pushes the diaphragm and compresses the gas. As the water cools, the gas pushes it back into the system. This keeps the system pressure fairly steady.
Many older UK homes still have an open vented system with a feed and expansion tank at the highest point of the house, usually in the loft. It is open to the air, water evaporates from it and oxygen enters the system, which encourages corrosion. During a refurbishment, the system is therefore often converted to a sealed system with a diaphragm vessel.
Signs that the vessel is not working
The heating system itself usually shows when the vessel needs attention. Typical signs are:
- the pressure gauge rises quickly as the system heats up and drops noticeably once it cools,
- the system needs topping up repeatedly through the filling loop, even though there is no visible leak,
- the pressure relief valve drips or discharges water while the heating is on,
- water comes out of the Schrader valve on the gas side of the vessel when pressed, which means the diaphragm has split.
Why is replacing the pressure relief valve not enough? The valve only reacts to excessive pressure. If the vessel is not working, a new valve will discharge just like the old one.
Sometimes the vessel is not faulty but has lost its pre-charge. Gas slowly passes through the diaphragm, so after years without checks the vessel behaves as if it were broken. A heating engineer will first measure the pre-charge and only then decide whether it is enough to recharge the vessel or whether it needs replacing.
What to decide before ordering
The choice depends on the type of heating and the volume of water in the system. Underfloor heating holds far more water than a few radiators, so it needs a larger vessel. A solid fuel boiler with a thermal store or buffer tank needs an even bigger reserve.
- Vessel built into the boiler: most wall-hung gas boilers, including combi boilers, have one inside. It may be enough for a smaller flat, but when the system is extended or underfloor heating is added, an additional external vessel is often fitted.
- Separate wall-mounted vessel: the usual solution for houses, easy to reach for checks.
- Floor-standing vessel on legs: for large volumes, for example with a thermal store or buffer tank.
Avoid mixing them up: vessels for potable hot water, usually blue, and vessels for solar circuits have different properties from heating vessels, which are usually red. They are not interchangeable. The size should be based on a calculation, not a guess. An undersized vessel causes the same problems as a faulty one. A vessel larger than calculated does no harm, it just takes up more space.
If the boiler has a built-in vessel and that is the one being replaced, the work involves opening the boiler. On a gas boiler this must be done by a Gas Safe registered engineer, ideally one familiar with that boiler. Check the back of their ID card to see which work they are qualified for. Otherwise there is a risk of losing the warranty and a safety risk.
Before ordering, it also helps to clarify the following:
- Where the vessel will hang: somewhere accessible, with the Schrader valve facing outwards, not towards the wall.
- Whether only the vessel is involved or a larger change: a low loss header separates the boiler circuit from the heating circuits and helps when the house has several circuits, for example radiators and underfloor heating. If the system is being reworked, it makes sense to fit the vessel and the low loss header at the same time.
- What happens to the old feed and expansion tank: when converting to a sealed system, decide whether the tank in the loft and its pipework will be removed.
- Whether the price covers labour only: check whether the quote includes the vessel, the service valve, the bracket and refilling the system, or only the fitting.
In a block of flats with a communal boiler plant, the expansion vessel is not the responsibility of individual owners. If the pressure fluctuates or the heating does not warm up, contact the managing agent or the residents' management company.
How the installation is carried out step by step
The procedure differs between a new installation and a replacement. In principle, the heating engineer carries out these steps:
- Checks the water volume in the system, the type of heating and the height of the building, and chooses the vessel size accordingly.
- Lets the system cool down, switches off the boiler and reduces the system pressure, or carries out draining of the heating system as far as needed.
- Removes the old vessel if it is being replaced.
- Before connecting, sets the pre-charge of the new vessel according to the system height and the boiler manufacturer's instructions.
- Mounts the vessel on the wall or a bracket and connects it via a service valve that cannot be closed by mistake.
- Refills the system with water treated with inhibitor, bleeds the radiators and the boiler, and sets the fill pressure.
- Starts the heating, watches the pressure as it heats up and checks the joints for leaks.
The vessel is most often connected to the return, the cooler pipe going back to the boiler. The diaphragm suffers less from heat there. The exact position, however, is set by the boiler instructions and the system layout.
How is the pre-charge set? As a guide, it is based on the static height of the system, the height from the vessel to the highest radiator. Roughly one bar is allowed for every ten metres of height, plus a small margin, usually around 0.2 to 0.3 bar. In a typical house this comes to about 0.8 to 1.2 bar. The water fill pressure is then set slightly above the vessel pre-charge. The pre-charge is only measured when there is no water pressure on the vessel.
What affects the price
The guide labour price is €54.00 per piece. It is lowest when the same vessel is replaced in the same place and a service valve is already fitted. The heating engineer can isolate it without draining the whole system and the job is done fairly quickly. The price goes up in these situations:
- No service valve: the whole system has to be drained, refilled and every radiator bled. This often takes longer than fitting the vessel itself.
- Poor access: the vessel is hard to reach in an airing cupboard or boiler room, or high up under the ceiling, and the engineer needs a ladder or has to work in a cramped space.
- Pipework changes: a new connection is needed, or fittings, a pressure gauge or a pressure relief valve have to be added. Every extra fitting means more material and time.
- Sludged-up system: an old system full of sludge releases dirt when drained. A powerflush or system flush is often added, otherwise the sludge ends up in the new vessel and the boiler.
- Vessel size: a small wall-mounted vessel is easy to fit, while a large floor-standing vessel next to a thermal store is heavy and harder to connect.
- Combined work: fitting a low loss header or removing an old cylinder or tank that is no longer needed increases the scope, but together it works out cheaper than two separate visits.
- Converting from an open vented system: removing the old feed and expansion tank in the loft, capping the pipework and adding the safety components for a sealed system is considerably more work than a standard replacement.
- Work inside the boiler: replacing a built-in vessel in a gas boiler is a job for a Gas Safe registered engineer and is charged on their terms.
What makes the job easier and what slows it down
Simple preparation before the heating engineer arrives saves a lot of time:
- have the boiler model and manual ready, plus any details of the system you have, such as the number of radiators and whether there is underfloor heating,
- clear the space around the boiler and the vessel, and empty any cupboard or shelves underneath,
- say in advance where the nearest drain or outside gully is for draining water,
- make sure radiator bleed valves can be reached, for example if radiator boxing in or covers make them hard to get to,
- if possible, book the work outside the heating season or on a milder day, as the system must cool down first and the house will be without heat for a few hours,
- if the work is done during the heating season, switch off the boiler a few hours beforehand as agreed with the engineer.
The job takes longer when the engineer only finds out on site that the vessel needs to go elsewhere or that suitable materials are missing. Photos of the boiler, the existing vessel and the pipework sent in advance often prevent this.
Common mistakes and how they show up later
In practice, problems are often caused not by a faulty vessel but by poor installation. These mistakes come up most often:
Factory pre-charge left unchanged. Nobody adjusted it to the house. With too low a pre-charge, the vessel fills with water while still cold and has no reserve left for heating, so the pressure rises and the relief valve discharges. With too high a pre-charge, almost no water enters the vessel when cold. When heating, the diaphragm only moves late, so the vessel uses just part of its volume and the pressure rises quickly. After cooling, there is no water reserve in the vessel to return to the system. The pressure therefore drops low, air gets into the highest radiators and the boiler shows a low pressure fault.
Pre-charge measured under water pressure. If water is pressing on the diaphragm, the gauge shows the system water pressure rather than the real pre-charge. The setting then does not match reality and the symptoms are the same as with an incorrectly set pre-charge.
Ordinary ball valve in front of the vessel. Someone closes it, for example during another repair, and the system is left unprotected. The pressure relief valve starts discharging the next time the system heats up.
Wrong connection point. The vessel is connected where it is affected by the pump or high temperatures. The system pressure behaves unpredictably and the diaphragm ages faster.
Size chosen by eye. A small vessel cannot take up all the expanding water. The problem only shows in winter when the heating runs flat out.
Schrader valve facing the wall. The pre-charge cannot be checked without removing the vessel, so it simply does not get checked during servicing.
According to manufacturers and BS EN 12828, the standard for the design of water-based heating systems including their safety and expansion arrangements, the system must stay protected at all times. That is why the vessel must not be isolatable by an ordinary valve without a safeguard.
How to check the finished work
At handover, ask to be shown how the vessel is connected and check these points:
- the vessel is securely fixed and its Schrader valve is accessible,
- it is connected via a service valve protected against accidental closing,
- the heating engineer has told you the pre-charge and the system fill pressure, ideally written down, for example on a label next to the vessel,
- the joints stay dry once the heating is warm,
- the pressure rises only slightly when heating and returns to its original value after cooling,
- the pressure relief valve does not drip,
- the radiators are bled and heat across their whole surface,
- you have received a record of the work carried out and the vessel manual.
For the first few days after installation, it is worth watching the pressure gauge both cold and with the heating fully on. A small drop in pressure after bleeding is normal, a repeated drop is not.
What you can check yourself
Leave the installation to a heating engineer. A routine check of a separate wall-mounted vessel can, however, be done by a competent homeowner if it has a service valve with a drain point. Leave a vessel built into a gas boiler to a Gas Safe registered engineer.
- Switch off the boiler and let the system cool down completely.
- Note the pressure on the heating pressure gauge while cold.
- Close the vessel's service valve and drain the water from the vessel into a bucket through its drain point until it stops flowing. While the valve is closed, the boiler must not be switched on, as the system is unprotected.
- Measure the pre-charge at the vessel's Schrader valve with an ordinary tyre pressure gauge.
- Compare the reading with the value set by the heating engineer. If it is significantly lower, the engineer can top it up, or it can be pumped up to the required value.
- If water comes out of the valve when pressed, the diaphragm has split and the vessel must be replaced.
- Close the drain point, open the service valve and check the system pressure. If it has dropped, top up through the filling loop according to the boiler manual. Only then switch the boiler back on.
If there is no service valve at the vessel, the pre-charge cannot be measured correctly without draining the system. In that case, leave the check to a heating engineer.
Frequently asked questions
The guide labour price is €54.00 per piece. The final cost depends on whether there is a service valve at the vessel, whether the whole system has to be drained, whether pipework or fittings need changing, and how easy the vessel is to reach. Also check whether the price includes the vessel itself.
If a service valve is fitted, the heating engineer can isolate the vessel and drain only a small amount of water. Without a valve, the pressure has to be reduced and usually at least part of the system drained. A service valve is normally added at the same time.
Once a year is recommended, ideally before the heating season or together with the annual boiler service. For owner-occupiers there is no legal inspection cycle, but HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months. For landlords the annual gas safety check is a legal requirement. The diaphragm lets gas through very slowly, so the pre-charge drops over time even in a healthy vessel.
It depends on water quality, temperature and correct pre-charge. With regular pre-charge checks, a vessel typically lasts around 5 to 10 years. If the diaphragm has split or the vessel is rusting, repair is not worthwhile and the vessel is replaced.
For a smaller radiator system it often is. With underfloor heating, a larger house or after radiator removal and installation that adds more radiators, it is often too small and the heating engineer fits an external vessel. The calculated water volume of the system decides.
Topping up the pre-charge to the value set by the heating engineer can be done with a pump through the Schrader valve. This only applies when the heating has cooled down and the vessel is isolated from water pressure, as described in the section on checks above. The pre-charge value itself should be set by the heating engineer based on the building height and the boiler manual, not by guesswork.
No. Blue vessels are intended for potable hot water, and vessels for solar circuits also have different properties. A heating system needs a vessel designed for heating systems, sized according to the calculation.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.