Building work price list: Underfloor Heating Manifold Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Install underfloor heating manifold | pcs | €300.00 / pcs | pcs | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
What a manifold does and when you need one
The manifold takes warm water from the boiler or heat pump, sends it into the underfloor loops and collects the cooled water coming back. Each room usually has its own loop, so the amount of heat going to that room can be set at the manifold. Even perfectly laid pipework heats unevenly if the manifold is the wrong size, badly positioned or not set up. Manifold installation is one part of wider heating work.
You need a manifold installed:
- in a new build with underfloor heating, where the manifold goes in before the pipes are laid and the screed is poured,
- when renovating the heating, if the heat source or room layout changes, or underfloor heating is added to more rooms,
- when the old manifold leaks, cannot be adjusted, and some rooms stay cold while others overheat.
What a manifold is made of and how it works
A manifold consists of two horizontal bars, one above the other. Warm water from the heat source enters one (the flow), and cooled water from the floor returns to the other (the return). Each loop connects one end to each bar.
- flow meters show how much water runs through each loop and are used to adjust it,
- valves for actuators allow room thermostats to be connected later so each room can be controlled separately,
- air vents and drain valves are used for filling, flushing and bleeding,
- isolating ball valves separate the manifold from the rest of the system when repairs are needed.
Why is a pump and mixing valve sometimes added? Underfloor heating needs much cooler water than radiators, usually around 35 to 45 °C. The floor surface in living areas should not exceed roughly 29 °C. If the heat source supplies higher temperatures, for example an older boiler that also serves radiators, a mixing unit (pump pack) is fitted before the manifold. It blends cooler return water into the hot flow and only lets water into the floor at a temperature the floor can take. With a heat pump or a low-temperature condensing boiler it is often not needed. The heating engineer should decide this based on the design.
What to decide before installation
Most underfloor heating problems come from decisions made too late or not at all. Before installation, agree the following with the heating engineer:
- Number of ports: this depends on the number of loops, their length and the output of the heat source. With standard pipe, one loop is usually no longer than about 100 to 120 metres; the exact limit depends on the pipe diameter and the manufacturer's recommendation. A large room may therefore need two loops. It is sensible to leave one spare port if another room may be added later.
- Recessed or surface-mounted cabinet: a recessed cabinet is hidden but must be planned when the wall is built, otherwise the wall has to be chased out afterwards. In load-bearing and external walls this is a significant intervention and should be assessed by a structural engineer or the designer. A surface-mounted cabinet is simple to fit but more visible.
- Mixing: whether a mixing unit is needed depends on the heat source and whether the same source also serves radiators.
- Thermostats: even if you do not want them straight away, it pays to choose a manifold with actuator valves and to run cables or conduit to the room thermostat positions. Pulling cables in after decorating is needlessly laborious.
- Design: it should include the number and length of loops, the water temperature and the flow rates. Without it, balancing is guesswork. A wet central heating system should be designed to BS EN 12828, including its safety and expansion arrangements.
Where to position the underfloor heating manifold
The ideal position is as close as possible to the centre of the heated area. The loops then have similar lengths and the supply pipes do not need to cross other rooms, where they would heat them unnecessarily. Larger houses sometimes have two manifolds, for example one per floor.
The manifold must stay accessible. The cabinet should not end up behind kitchen units or a fitted wardrobe. A hallway, plant room or utility cupboard is suitable. The manifold should sit higher than the loops in the floor so air can rise to the air vents, and there must be enough room below it for the pipes to bend smoothly.
How installation works step by step
- Preparing the position: the recessed or surface-mounted cabinet, or a service recess, is prepared.
- Fixing: the manifold is fixed level on its brackets, above the level of the loops.
- Connecting to the heat source: the flow and return from the heat source are connected, including isolating valves and any mixing unit.
- Connecting the loops: pipe ends are cut square and connected using compression fittings designed for that pipe type and size. Bend guides are used where pipes turn close to the manifold so they do not kink.
- Labelling: each port is labelled with the room name and loop length.
- Filling and flushing: loops are filled and flushed one at a time until water runs without air.
- Pressure test: carried out and recorded on a test certificate.
- Commissioning: flow rates are set and temperatures checked during first heating.
Pressure test and screeding over the pipes
The pressure test is always done before the screed is poured, while the pipes are still visible. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid; the test pressure and duration are set by the system manufacturer. In practice, testing at around 6 bar or 1.5 times the operating pressure is common. The pipes stay under pressure while the screed is poured, so any damage shows up immediately. The screed holds the pipes in place and ensures heat passes evenly into the floor.
The heating is first switched on only once the screed has cured, usually after around 21 days for cement screed and around 7 days for anhydrite (calcium sulphate) screed. The temperature is then raised gradually according to the manufacturer's instructions. The commissioning heat-up should be recorded, as the floor layer often asks for it before laying the floor finish.
Setting flow rates and balancing the system
Fitting the manifold is not enough. Water always takes the easiest route, so without adjustment a short bathroom loop would "steal" heat from a long living room loop. That is why hydraulic balancing is done: the heating engineer sets each loop's flow meter to give it as much water as it needs for its length and the room's heat loss. The values should be in the design. If there is no design, they come from a calculation or the manufacturer's tables.
A well-balanced system heats evenly, runs more quietly and the pump does not work harder than necessary. It is also ready for room thermostats. Actuators on the valves then open and close loops automatically according to room temperature. Electrical connection of the actuators and wiring centre must be carried out by a qualified electrician. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
Underfloor heating responds slowly. After a change it can take several hours to show in the room, so flow rates are fine-tuned gradually, not several times a day.
What affects the price
The guide labour price is €300.00 per piece. This covers installing one manifold. The manifold itself, the cabinet and other materials are usually charged separately. The final amount is driven mainly by:
- Number of loops: each port means another connection, flush, label and setting. A ten-port manifold takes noticeably more work than a three-port one.
- Loop length: very long loops take longer to fill and bleed.
- Mixing unit with pump: means another connection, temperature setting and often electrical connection. It can add half as much time again or more compared with the manifold alone.
- Replacing an old manifold: if dimensions do not match and fittings or supply pipes need altering, there is draining, removal and adaptation work. Draining the heating system is often priced as a separate item.
- Unlabelled old loops: it first has to be established where each one goes, which takes time with many loops.
- Sludged old loops: a thorough flush, sometimes with a cleaning chemical, can take longer than the installation itself.
- Cramped space or chasing out a cabinet afterwards: chasing, making good and removing rubble are usually separate items.
- Scope of commissioning: balancing to the design and checking during first heating may mean an extra visit.
When comparing quotes, ask whether the price includes a pressure test with certificate, flushing and setting the flow rates, or only mechanical fitting.
How to prepare for manifold installation
Installation is quickest in a new build where the supply pipes are ready, the cabinet is fitted at the right height and the loops are not yet screeded. A lot also depends on what is ready on site:
- water for filling and power for tools and the test pump are available on site,
- the heat source is installed, or at least its position and connections are known,
- the heating engineer has the design or at least a loop plan with lengths,
- whoever laid the pipes labelled the loop ends at the manifold straight away,
- the screed date is agreed so the pressure test can be done without rush and the pipes stay under pressure,
- the area in front of the manifold is clear of material pallets and scaffolding,
- in an occupied home, the heating shutdown is agreed in advance, ideally outside the heating season.
Work takes longer when screeding, plastering and electrical work are going on in the same spot at the same time, or when thermostats and mixing are only decided during installation.
Common mistakes and how they show up later
Manifold with no access
It sits behind kitchen units, a wardrobe or in a bricked-up recess. Servicing, bleeding or replacing an actuator means dismantling furniture.
Unlabelled loops
Years later nobody knows which loop serves which room. Setting thermostats and tracing faults becomes trial and error.
Flow meters fully open
No balancing was done. The bathroom and hallway overheat, while distant rooms with long loops stay cold.
Loops filled all at once
Air stays trapped; the loop gurgles or does not heat at all.
Screed without a pressure test or without pressure in the pipes
A damaged pipe only shows itself as a damp patch or pressure loss years later. The repair then means breaking up the finished floor.
Floor connected to high temperature without mixing
The floor is uncomfortably hot, the screed and floor finish are stressed and can crack, and timber floors warp.
Manifold lower than the loops
Air collects in the floor and cannot be released.
Wrong fittings
A fitting meant for a different pipe type or size will start to drip over time, often only after several heating seasons.
When a room does not heat, owners often blame the boiler, when setting the flow rates correctly and bleeding the loops would be enough.
Replacing a manifold during renovation and in a block of flats
Older manifolds often have no flow meters and no way of connecting actuators. A renovation is therefore a good time to fit a new one, especially when the heat source or room layout is changing. If the underfloor loops are sound and not sludged, a new manifold can usually be connected without breaking up the floor. Where underfloor heating replaces radiators in some rooms, radiator removal and installation is often done at the same time, and any radiators that stay can be tidied up with radiator boxing in.
If the boiler is also being changed, disconnecting and connecting a gas boiler may only be done by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. For a larger change to the heating system, check with your local building control what needs to be arranged.
In a block of flats the situation is different. If the flat is connected to a communal heating system, any work on it must be discussed in advance with the managing agent or management company. Connecting underfloor heating to the building's system without consent can unbalance the heating for neighbours too.
How to check the finished work at handover
- the manifold is firmly fixed, level and easy to reach,
- each port is clearly labelled with its room,
- joints are dry and nothing drips, including at the bottom of the cabinet below the manifold,
- you have the pressure test certificate,
- flow meters are set to the design and you have the values in writing,
- loops are bled and all are warm when heating, none stays cold,
- there is no gurgling or hissing from the manifold,
- isolating valves close and open easily,
- with screed, you have a record of the gradual commissioning heat-up,
- the heating engineer has shown you how to bleed a loop and isolate the manifold.
Frequently asked questions
As a guide, €300.00 per piece. The final price depends mainly on the number of loops, whether a mixing unit with pump is needed, whether an old manifold is being replaced, and whether the price includes flushing, pressure testing and balancing.
In a prepared new build, usually half a day to a day including filling and pressure testing. Replacing an old manifold, altering supply pipes or fitting a mixing unit can stretch the work to one or two days. Waiting for the screed to cure and the commissioning heat-up add separate weeks.
Yes, flow meters can be readjusted at any time. After insulating the house, changing the layout or replacing the heat source, it is sensible to have the system rebalanced.
Before each heating season it is worth checking that joints are not dripping and bleeding the loops. A more thorough check of the flow meters and settings by a heating engineer every few years is enough. If a loop stops heating, it is best not to wait.
Yes. A well-balanced system heats evenly, rooms do not overheat and the heat source runs more steadily. With room thermostats you also heat only where and when it is needed.
Most often there is air in the loop, the flow meter is partly closed or blocked, or the actuator has stayed shut. Bleeding the loop and checking the flow at the manifold usually helps. If not, the loop may be too long or damaged and a heating engineer should be called.
A competent DIYer can manage the mechanical fitting, but pressure testing, balancing and connection to the heat source require measuring equipment and experience. Mistakes only show up under the finished floor, so it is worth leaving this to a heating engineer. Gas boiler work always requires a Gas Safe registered engineer, and actuator wiring a qualified electrician.
Related work
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.