Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Heating works | ||||
| Install underfloor heating manifold | pcs | - | ||
| Remove & re-install radiator (complete) | pcs | 170,40 € | - | |
| Remove gas / electric boiler | pcs | 102,23 € | - | |
| Remove hot water cylinder | pcs | 109,25 € | - | |
| Install & connect panel radiator | pcs | - | ||
| Install bathroom towel radiator | pcs | 50,10 € | - | |
| Lay underfloor heating insulation board | m² | 3,50 € | - | |
| Underfloor heating pipe installation | m | 6,50 € | - | |
| Install gas condensing boiler | pcs | - | ||
| Install thermostatic radiator valve (TRV) & head | pcs | 19,04 € | - | |
| Earth / bond heating system | pcs | - | ||
| Replace thermostatic radiator valve (TRV) | pcs | 19,04 € | - | |
| Replace return valve | pcs | 19,04 € | - | |
| Install circulation pump | pcs | - | ||
| Pre-wire for smart thermostat connection | pcs | - | ||
| Install & connect low-loss header | pcs | - | ||
| Install expansion vessel | pcs | 54,12 € | - | |
| Install recirculation pipework | pcs | - | ||
| Install domestic hot water (DHW) / recirculation pump | pcs | - | ||
| Thread pipework | pcs | 10,02 € | - | |
| Flame weld metal pipework | pcs | 20,05 € | - | |
| Pressure test heating system | hr | 40,10 € | - | |
| Drain heating system | pcs | - | ||
| Fill, bleed & balance heating system | hr | 40,10 € | - | |
| Pipework for radiators | lm | 9,02 € | - | |
| Flush & clean existing heating system | hr | 45,10 € | - | |
| Pipe freezing | pcs | 34,08 € | - | |
| Cap off radiator | pcs | 65,15 € | - | |
| Fill heating system | pcs | - | ||
| Chase heating pipes in floor | lm | 24,06 € | - | |
| Concrete-in heating pipes in floor | lm | 6,50 € | - | |
| Install radiator bracket | pcs | 17,04 € | - | |
| Install radiator valves | pcs | 17,04 € | - | |
| Pressurise & bleed radiator | pcs | 14,03 € | - | |
What a manifold is made of and how it works
A manifold consists of two horizontal bars, one above the other. Warm water from the heat source enters one of them (the flow), and cooled water from the floor returns to the other (the return). Each loop connects to both bars, one pipe end on each.
- Flow meters show how much water runs through each loop and let you adjust it
- Actuator-ready valves allow room thermostats to be added later, so each room can be controlled separately
- Air vents and drain valves are used for filling, flushing and bleeding air out
- Isolating ball valves separate the manifold from the rest of the heating so repairs can be done without draining everything
Why is there sometimes a pump and a mixing valve as well? Underfloor heating needs much cooler water than radiators. If the heat source delivers high temperatures, for example an older boiler that also feeds radiators, a mixing unit is fitted in front of the manifold. With a heat pump or a condensing boiler running at low temperatures it is often not needed. The heating engineer should decide this based on the system design.
How the installation is done step by step
First, a manifold with the right number of ports is chosen. This depends on how many loops there are, how long they are and the output of the heat source. It makes sense to leave one spare port if you might add another room in future.
- Prepare a manifold cabinet, either recessed into the wall or surface-mounted, or a technical niche.
- Fix the manifold on its brackets, level and higher than the loops in the floor, which makes bleeding the air easier.
- Connect the flow and return from the heat source, including isolating valves and any mixing unit.
- Connect each loop using compression fittings made for that type of pipe.
- Label every port with the room name and the loop length.
- Fill and flush the loops one at a time until the water runs without air.
- Carry out a pressure test and record it in a test report.
- Set the flow rates and check the temperatures when the heating first runs.
Where should the manifold go? Ideally as close to the centre of the heated area as possible, so the loops are of similar length and the supply pipes do not have to run through other rooms. It also has to stay accessible: the cabinet should not end up behind kitchen units or a fitted wardrobe.
Pressure testing and screeding over the pipes
The pressure test is always done before the screed is poured, while the pipes are still visible. The test pressure and duration are set by the system manufacturer, and the procedure is based on EN 1264. The pipes stay under pressure while the screed goes down, so any damage shows up straight away. The screed holds the pipes in place and spreads the heat evenly into the floor. The heating is switched on for the first time only once the screed has cured, usually after several weeks for a cement screed and sooner for an anhydrite screed. The temperature is then raised gradually, following the manufacturer's instructions.
Setting flow rates and balancing the system
Fitting the manifold is only half the job. Water always takes the easiest path, so without adjustment a short bathroom loop would "steal" heat from a long living-room loop. That is why the system is hydraulically balanced: the heating engineer sets each flow meter so the loop gets exactly as much water as it needs for its length and the room's heat loss. The values should be in the system design. If there is no design, they come from a calculation or the manufacturer's tables.
A well-balanced system heats evenly, runs more quietly and the pump does not have to work harder than necessary. It is also ready for room thermostats. Actuators on the valves then open and close the loops on their own according to the room temperature. The wiring of the actuators and the control unit must be done by a qualified electrician.
What makes the job easier or harder
The simplest case is a new build where the supply pipes are ready, the cabinet is set at the right height and the loops have not been screeded yet. More work is involved with:
- A large number of loops or very long loops
- The need for a mixing unit with a pump
- Replacing an old manifold whose dimensions do not match, so fittings or supply pipes have to be adapted
- Unlabelled old loops, where you first have to work out which one goes where
- Tight spaces, or a cabinet that has to be cut into the wall afterwards
- Old loops full of sludge that need a thorough flush
Mistakes that keep coming up
- The manifold is hidden so well that nobody can reach it for servicing
- The loops are not labelled, and years later no one knows which belongs to which room
- All flow meters are left fully open, so no balancing was actually done
- All loops are filled at once and air stays trapped in them
- Screed is poured without a pressure test, or without the pipes being under pressure
- The underfloor heating is connected straight to high-temperature water from the boiler with no mixing
It is quite common for an owner to suspect the boiler when the real fix is simply setting the flow rates correctly and bleeding the loops.
Replacement during renovation and in flats
Old manifolds often have no flow meters and no way to add actuators. A renovation is therefore a good moment to fit a new one, especially if you are changing the heat source or the room layout. If the floor loops are watertight and not clogged, a new manifold can usually be connected without breaking up the floor.
If the boiler is being changed at the same time, a gas boiler may only be disconnected and reconnected by a qualified, registered gas engineer. If you smell gas, leave the property and call the local emergency number or 112. For larger changes to the heating system, check with your local building authority whether any approval or notification is needed under local building regulations.
In a block of flats things are different. If your flat is connected to a shared central heating system, discuss any work with the building management or owners' association beforehand. Connecting underfloor heating to the building's system without approval can upset the heating for your neighbours too.
Handover checklist
- The manifold is firmly fixed, level and easy to reach
- Every port is clearly labelled with its room
- All joints are dry and nothing is dripping
- You have the pressure test report
- The flow meters are set according to the design and you have the values in writing
- The loops are bled and all of them get warm when the heating runs
- The isolating valves close and open easily
- If screed was laid, you have a record of the gradual heat-up procedure
- The heating engineer has shown you how to bleed a loop and isolate the manifold
Frequently asked questions
In a prepared new build it is usually a few hours' work. During a renovation, or when supply pipes need adapting or a mixing unit is added, it can take longer, and that is before the screed curing time.
Yes, the flow meters can be adjusted at any time. After insulating the house, changing the room layout or replacing the heat source, it is sensible to have the system rebalanced.
Once every few years is usually enough, ideally before the heating season. The check covers joint tightness, air in the loops, whether the flow meters move freely and the settings. If one loop stops warming up, do not wait.
Yes. A well-balanced system heats evenly, rooms do not overheat and the heat source runs more steadily. With room thermostats you also heat only where and when you need to.
A handy person can manage the mechanical fitting, but the pressure test, balancing and connection to the heat source need measuring equipment and experience. Any mistake only shows up once the floor is finished, so it is worth leaving this to a heating engineer.