Expansion Vessel Installation and Connection

Fitting a low loss header (hydraulic separator) means mounting it on the boiler room wall and connecting it to the boiler and circuits. Guide price €350.00 per unit. It usually takes one working day.

Updated 09/2026·10 min read·34 price list items
Standard labour price
€350.00/ pcs
Indicative range
€280.00 - €455.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Expansion Vessel Installation and Connection

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Install & connect low-loss headerpcs€350.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Fill heating systempcspcs-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a low loss header (hydraulic separator) is and what it does

A low loss header, also called a hydraulic separator or hydraulic header, is a vertical pipe of larger diameter. It separates the boiler circuit from the heating circuits in the house. It is mainly needed where there are several circuits with their own pumps, for example radiators, underfloor heating and hot water heating at the same time. Installation means fixing the header to the wall. Connection means joining it to the boiler and the existing pipework. This work belongs to the wider field of heating work, and it is often listed alongside expansion vessel installation, although the two components do different jobs.

Picture a boiler with its own pump and, after it, two or three circuits, each with another pump. Without a low loss header the pumps work against each other. One pump draws water from another circuit, the other pushes it back, radiators heat unevenly and the boiler switches on and off frequently. The header creates a zone of very slow flow. There the primary boiler circuit and the secondary circuits meet without affecting each other's pressure.

The header also helps to collect air at the top and sludge at the bottom. For this reason it usually has an automatic air vent at the top and a drain valve, often called a sludge or blow-down valve, at the bottom.

When a low loss header is needed and what to decide in advance

A low loss header makes sense mainly in these situations:

  • the house has several heating circuits with their own pumps,
  • radiators and underfloor heating with different water temperatures are combined,
  • several boilers work together (a cascade) or a boiler is combined with another heat source,
  • the manufacturer of the boiler or heat pump requires a constant minimum flow through the appliance.

A simple system with one boiler and one radiator circuit usually does not need a header. Whether your system needs one is for the heating engineer to decide, based on the heating layout and the boiler manufacturer's instructions. A wet central heating system should be designed to BS EN 12828, including its safety and expansion arrangements.

Before placing an order, it is worth agreeing the following with the heating engineer:

  • Size of the header. It is chosen according to boiler output and water flow, not according to what happens to be in stock. A common rule of thumb is that the header diameter is roughly three times the diameter of the connecting pipe. The exact size is set by the manufacturer's tables.
  • Type. It is chosen according to the number of circuits and the space in the boiler room. The options are described below.
  • Boiler type and flow ratio. With a condensing boiler, have the size and connection designed carefully. The flow on the boiler side should be slightly lower than the total flow to the circuits. If more water flows from the boiler through the header than the circuits take, hot water returns straight to the boiler. The return is then warmer, the boiler condenses less and uses fuel less efficiently.
  • Controls. Many boilers and controllers sense temperature directly in the header. Check in advance whether a sensor pocket is needed and exactly where the controls require it to be placed.
  • Scope of work. Connecting a header is often only part of a larger boiler room upgrade. If you also plan a boiler replacement, new pumps, extending the heating or radiator removal and installation, it is better to do everything at once so the system is not drained twice.
  • Permissions and consents. If the work is part of a larger renovation, check with your local authority building control what applies to your project. In a block of flats with communal heating, the shared pipework must not be altered without the consent of the managing agent or the building owner.

Low loss headers are made in several versions:

  • A standalone header suits systems where a manifold already exists or is planned separately.
  • A header combined with a flow and return manifold saves space and simplifies installation in a new boiler room with several circuits.
  • A factory-insulated header saves the work of insulating it afterwards.
  • A header with a magnetic filter captures metallic debris. It is particularly useful in older systems with steel pipework.

How the header is installed and connected

The procedure differs between a new heating system and adding a header to an existing one. When connecting to a working system, the job usually looks like this:

  1. Survey: the heating engineer checks the system - number of circuits, boiler output, pipe material and diameter, and the condition of pumps and valves.
  2. Selection: based on output and flow, the engineer chooses the header size and connection diameter.
  3. Shutdown: the boiler and pumps are switched off, valves are closed and the necessary part of the system is drained. More on this in draining a heating system. For a small local job, pipe freezing can be used instead of draining to stop the flow in the pipe temporarily.
  4. Flushing: if the system water is dark and full of sludge, it is sensible to flush the system before connecting, so that debris does not immediately clog the new header and pumps.
  5. Mounting: the header is fitted vertically on a load-bearing wall bracket, not supported by the pipework alone.
  6. Connection: the primary side (flow and return from the boiler) and the secondary side (flow and returns to the circuits) are connected. Isolating valves and unions are fitted on the connections so the header can be serviced later.
  7. Accessories: the air vent and drain valve are fitted, and a sensor pocket for the controls if required.
  8. Filling: the system is refilled and bled.
  9. Pressure test: the system is pressurised to the test pressure set by the design or the manufacturer, and the engineer checks that the pressure does not drop during the test. The pressure is then set to the operating value specified by the boiler manufacturer.
  10. Leak check when hot: the heating is started and all joints are inspected again once the water has warmed up.
  11. Commissioning: pump speeds and controls are set so that boiler and circuit flows match.
  12. Insulation: the header and connections are insulated so they do not lose heat into the boiler room.

If the boiler runs on gas, the heating engineer does not touch the gas side during this work. Any work on a gas boiler or its gas supply must be carried out by a Gas Safe registered engineer. Electrical connection of new pumps and controls should only be done by a qualified electrician, and all new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. If you smell gas near the boiler, do not switch it on, do not operate light switches, ventilate the room and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

What affects the price

The guide labour price is €350.00 per unit. It applies to the standard mounting and connection of one header. The final amount depends mainly on the following:

  • Pipe material: copper or plastic pipe can be connected fairly quickly, for example with press-fit fittings. Old steel pipework has to be cut and threaded or welded, which takes considerably longer.
  • Draining the system: if closing valves locally or pipe freezing is enough, the job goes faster. Draining, refilling and bleeding the whole system adds several hours.
  • Number of circuits: each extra circuit means another connection, more valves and more adjustment. With three or more circuits the work is noticeably more demanding than with one or two.
  • Alterations around the header: if new pumps, valves or a manifold are needed, or pipework has to be rerouted, the price rises with the scope. These alterations are usually charged separately.
  • Condition of the system water: a sludged system that needs flushing means extra work.
  • Access and wall space: a cramped boiler room where the header must be squeezed between boiler, cylinder and pipework takes longer than a clear wall.
  • Larger refurbishment: if the boiler is being replaced at the same time, the price for the header alone may be lower, because the system is already drained and the boiler room opened up.

The labour price usually does not include the header itself, insulation, valves or any new pumps. When comparing quotes, ask exactly what is included and whether refilling, the pressure test, pump setting and insulation are covered.

How to prepare for the installation

Good preparation on the customer's side saves a lot of time:

  • clear the boiler room so there is free access to the boiler, wall and valves, and move anything that could get wet during draining,
  • have the boiler manual and documentation ready, and the heating layout if you have one,
  • book the work outside the heating season or on warmer days so the shutdown is not a problem,
  • if new pumps or controls are being wired in, book the electrician for the same day,
  • if boiler settings are to be changed, also arrange the boiler service engineer,
  • check where the heating water can be drained and that a water supply is available for refilling,
  • in a block of flats, obtain the managing agent's consent in advance, not on the day of installation,
  • be at home for the handover so the heating engineer can show you the settings and maintenance.

The job takes longer if it turns out on site that some valves leak or will not close, or if agreed materials are missing and the engineer has to leave to buy them.

Typical connection mistakes and how they show

Header fitted horizontally or at an angle. It does not separate air or sludge. Air then gurgles in the system, radiators need bleeding more often and sludge settles in the pumps.

Connections swapped. If the primary and secondary sides, or flow and return, are mixed up, circuits heat poorly or not at all and the controls behave illogically.

Header too small. Water flows through it quickly, the pumps interfere with each other again and the problem the header was meant to solve remains.

No isolating valves. Every service or pump replacement requires draining the whole system.

Header hanging on the pipework without a bracket. Its weight when full of water stresses the joints, which eventually start to weep.

Pressure test skipped. A small leak does not show immediately. System pressure gradually falls, it needs topping up, and water can seep quietly into the insulation.

Pumps set without regard to each other. The boiler keeps cycling, switching on and off frequently. Consumption rises and the boiler wears out faster.

Temperature sensor in the wrong place. If it is not where the boiler controls require, the boiler responds to the wrong temperature and the heating is overheated one moment and cold the next.

No insulation. The boiler room overheats and heat is lost where it is not needed. Heat loss from exposed pipework in living spaces can also be reduced, for example with radiator boxing in that leaves enough space for air circulation.

Many of these mistakes do not show straight away. They typically appear in winter, when all circuits run at the same time.

How to check the finished work

At handover, ask to see the work with the heating running. Check that:

  • the header is fitted vertically and firmly fixed on its bracket,
  • a pressure test was carried out and the engineer told you the test pressure and the result,
  • all joints are dry with both cold and hot water,
  • the header has a working air vent and drain valve,
  • isolating valves and unions are fitted on the connections,
  • system pressure stays within the range specified by the boiler manufacturer once hot,
  • all circuits heat up and the boiler does not switch on and off at short intervals,
  • the pumps are set and the engineer has shown you their settings,
  • the temperature sensor, if the controls use one, sits in a sensor pocket in the position given in the instructions,
  • the header and surrounding pipework are insulated,
  • you have received the wiring and piping diagram and the header instructions, and you know how to drain off sludge.

After the first few days of operation, check the pressure on the boiler gauge again. As remaining air comes out of the water, the pressure may drop slightly and need topping up.

Frequently asked questions

As a guide, €350.00 per unit. The price covers labour and depends mainly on the pipe material, the number of circuits, whether the whole system must be drained and any alterations around the header. The header itself and other materials are usually charged separately.