Filling a heating system means filling the pipework, radiators and boiler with water, free of air and at the correct pressure. The guide price is €54.00 per job, depending mainly on system size and whether a flush is needed.

Updated 09/2026·10 min read·34 price list items
Standard labour price
€54.00/ pcs
Indicative range
€43.20 - €70.20
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Filling the Heating System: Final Stage

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Heating and air conditioning34 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Heating works cost

Fill heating systempcs€54.00 / pcspcsenter quantity-
Remove & re-install radiator (complete)pcs€180.00 / pcspcsenter quantity-
Remove gas / electric boilerpcs€110.00 / pcspcsenter quantity-
Remove hot water cylinderpcs€109.00 / pcspcsenter quantity-
Install & connect panel radiatorpcspcs-
Install bathroom towel radiatorpcs€120.00 / pcspcsenter quantity-
Lay underfloor heating insulation boardm²€3.50 / m²m²enter quantity-
Underfloor heating pipe installationm€4.50 / mmenter quantity-
Install underfloor heating manifoldpcspcs-
Install gas condensing boilerpcspcs-
Installation of air-to-water heat pumppc€950.00 / pcpcenter quantity-
Earth / bond heating systempcspcs-
Replace thermostatic radiator valve (TRV)pcs€19.00 / pcspcsenter quantity-
Replace return valvepcs€19.00 / pcspcsenter quantity-
Install circulation pumppcspcs-
Pre-wire for smart thermostat connectionpcspcs-
Install & connect low-loss headerpcspcs-
Install expansion vesselpcs€54.00 / pcspcsenter quantity-
Install recirculation pipeworkpcspcs-
Install domestic hot water (DHW) / recirculation pumppcspcs-
Thread pipeworkpcs€55.00 / pcspcsenter quantity-
Flame weld metal pipeworkpcs€20.00 / pcspcsenter quantity-
Pressure test heating systemhr€130.00 / hrhrenter quantity-
Drain heating systempcspcs-
Fill, bleed & balance heating systemhr€70.00 / hrhrenter quantity-
Pipework for radiatorslm€9.00 / lmlmenter quantity-
Flush & clean existing heating systemhr€50.00 / hrhrenter quantity-
Pipe freezingpcs€50.00 / pcspcsenter quantity-
Cap off radiatorpcs€65.00 / pcspcsenter quantity-
Chase heating pipes in floorlm€24.00 / lmlmenter quantity-
Concrete-in heating pipes in floorlm€6.50 / lmlmenter quantity-
Install radiator bracketpcs€17.00 / pcspcsenter quantity-
Install thermostatic radiator valve (TRV) & headpcs€19.00 / pcspcsenter quantity-
Pressurise & bleed radiatorpcs€12.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

When the system needs refilling and when topping up is enough

Filling is the final stage after installation or repair work on the heating. It is not only about getting the system full of water. It is filled slowly, bled as it goes, set to the correct pressure and then checked again once it has warmed up. If the job is rushed, the heating may run, but radiators only heat partly, the system gurgles and the pressure keeps changing for weeks.

A full refill is needed when the system has been empty or part of it has been drained. This mainly applies in these situations:

  • first commissioning of the heating in a new build or after a full refurbishment,
  • replacing or moving a radiator, thermostatic radiator valve (TRV), pump or boiler,
  • flushing sludge and rust out of the system,
  • repairing a leak where the water had to be drained off.

Topping up is far more common. It is done when the pressure on the gauge drops so low that the boiler shows a fault or some radiators stop heating. Pressure in a sealed system can fall slowly, for example after bleeding radiators, when a little water escapes with the air. If topping up is needed often, say every few weeks, water is leaking somewhere or the expansion vessel is not working. Topping up alone will not solve that.

In a block of flats with communal heating, the system is normally not filled from inside a flat. Refilling the risers is decided by the managing agent or the building management, so let them know in advance about any radiator replacement.

What to agree with the heating engineer before filling

Some things are worth settling before the heating engineer lets water into the system. Changing them later is awkward, because the water would have to be drained again.

Flush or no flush. If a new boiler is connected to old pipework, sludge and rust from the old pipes end up in the new boiler and pump. Boiler manufacturers therefore often require the system to be flushed when a boiler is replaced.

Pressure test. On a new or substantially altered installation, this is done before filling. Check whether it is included in the quote.

Water quality. Look in the boiler manual to see whether the manufacturer specifies water quality. This decides whether mains water is enough or treated water is needed.

How the system is filled, step by step

A heating engineer usually works in this order:

  1. Check that all joints are tight and drain-off cocks are closed. On a new installation, carry out a pressure test for leaks.
  2. On older pipework or after installation work, flush the system so that no swarf, jointing compound or sludge is left inside.
  3. Switch off the boiler and fill only a cold system.
  4. Open the radiator valves so that water reaches every circuit.
  5. Fill slowly through the filling loop or filling valve while watching the pressure gauge.
  6. With the pump off, bleed the radiators from the lowest floor to the highest, and finally bleed the boiler and pump as well.
  7. Top up to the target pressure, disconnect the filling loop, start the heating and bleed again once it has warmed up.
  8. On a new or altered system, balance the radiators so that all rooms heat evenly.

Air comes out of the system gradually, especially during the first few heat-ups. It is therefore normal to bleed the radiators again and top up the pressure slightly for a few days after filling. If this continues after several weeks, the cause needs to be found.

With underfloor heating, the loops are usually filled and flushed one at a time through the manifold, so that air is pushed out of the long pipe runs in the floor. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid. A combined radiator and underfloor system therefore takes longer to fill.

What pressure to set and what water to use

In a typical house, the pressure in a cold system is usually around 1 to 1.5 bar. The exact figure depends on the height of the building and the expansion vessel setting, so follow the boiler manual or the heating engineer's advice. When the system warms up, the pressure rises slightly because hot water expands. The pressure relief valve on the boiler usually opens at 3 bar. If the pressure approaches that figure while the heating is running, the system is overfilled or the expansion vessel is not working properly.

Why does the expansion vessel matter so much? It takes up the water that expands as it heats. If it loses the gas charge inside, the system pressure shoots up when hot and drops when cold. The vessel charge is checked with the system drained, ideally at the annual boiler service or when the heating is empty anyway for other work. For owner-occupiers there is no legal inspection cycle, but HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months. For landlords the annual check is a legal requirement.

Mains water is normally used for filling. In hard water areas, with a larger system, treated, softened or demineralised water is worth considering so that limescale does not build up in the boiler. Some boiler manufacturers specify water quality directly. Antifreeze makes sense, for example, in a holiday cottage that is not heated in winter. Use it only if the system design and the boiler and pump manufacturers allow for it.

Heating water must never get back into the drinking water supply. Filling from the mains should therefore go through a check valve or a filling loop arrangement that separates the two. If a temporary filling loop or hose is used, it must always be disconnected after filling and the filling valve left closed.

What affects the price of filling

The guide labour price is €54.00 per job, where one job means filling the whole system once. The final figure is mainly affected by these factors:

  • Size and layout of the system: a small, simple system in a flat or bungalow, with a filling loop at the boiler and working bleed valves, is quickest to fill. A two-storey house with several circuits means more bleed points and more trips up and down the stairs, so the job takes considerably longer.
  • Underfloor heating: the loops in the floor are filled and bled one by one, which adds time.
  • Condition of the pipework: old pipework that has to be flushed first is a separate extra job and often takes longer than the filling itself.
  • Condition of the valves: seized or leaking valves need replacing. This adds materials, time and sometimes draining part of the system again.
  • Access: radiators and bleed points behind furniture or inside radiator boxing or covers slow the work down.
  • Additional work: water treatment, pressure testing, checking the expansion vessel and balancing are usually charged separately.

When comparing quotes, ask exactly what the price includes. Some engineers include a second bleed after warm-up and a follow-up check a few days later, others only the filling itself.

How to make the heating engineer's job easier

Filling itself is not a long job. Most time is usually lost waiting, moving things and looking for paperwork. It helps if, before the engineer arrives, you:

  • clear access to the boiler, the filling loop and every radiator, especially the bleed valves at the top corners,
  • have the boiler manual and any heating design drawings ready,
  • make sure the water supply is on and the tap or valve used for filling works,
  • open up all rooms, including upstairs and the loft,
  • put a cloth or small tray under each radiator to catch water that spurts out during bleeding.

Also arrange for someone to be at home over the following days to check the pressure and radiators as the engineer instructs.

Typical filling mistakes and how they show up later

Filling too quickly. Air gets into the system and keeps coming out for a long time. Radiators only heat at the bottom and gurgling can be heard in the pipes.

Filling while the boiler is running or into a hot system. Cold water in a hot boiler puts it under stress, and the pressure is hard to set because it drops once the system cools.

Overfilling above the recommended pressure. The pressure relief valve drips when the system heats up, damp patches appear under the boiler and the valve can eventually become fouled and stop sealing.

Skipping the bleeding. Radiators heat only at the bottom, the system gurgles and the boiler may show a fault due to poor flow.

A small leak that goes unnoticed. It only shows during winter, as the pressure gradually falls, or as a stain on the wall or floor below a joint.

Repeated topping up without finding why the pressure drops. Many homeowners top up for years without knowing the expansion vessel has almost no charge left. Fresh water also brings in oxygen and minerals, which speed up corrosion and deposits.

Filling without a flush after fitting a new boiler to old pipework. Sludge settles in the heat exchanger and pump. The boiler then runs noisily, transfers heat less well and the warranty may be at risk.

How to top up the heating and bleed radiators yourself

Topping up the system in a house is something you can do yourself if the filling loop and pressure gauge are accessible. Do not touch the gas side of the boiler, the pressure relief valve or the expansion vessel. Those are for a professional, and any work on gas appliances must be done by a Gas Safe registered engineer. A full refill of an empty system, for example after a boiler replacement or after draining the heating system, is better left to a heating engineer.

  1. Switch off the boiler and wait for the system to cool down.
  2. Check in the manual what pressure the boiler manufacturer recommends.
  3. If the boiler has no built-in filling key or lever, connect the external filling loop, making sure it is free of air.
  4. Slowly open the valve and watch the pressure gauge.
  5. Close the valve once the target pressure is reached and disconnect the filling loop.
  6. With the boiler off, bleed the radiators using a radiator key, from the lowest floor upwards, until water comes out without bubbles.
  7. Check the pressure again and top up if needed.
  8. Switch the boiler on and, once warm, check that all radiators are heating.

You can mark the target pressure next to the gauge with a label or a marker on the casing, so you do not have to rely on memory next time. If the pressure drops again within a few days or weeks after topping up, further topping up will not help. Call a heating engineer to find the leak or check the expansion vessel.

Checks after filling

When the work is handed over, check these points:

  • the cold system pressure matches the boiler manufacturer's recommendation,
  • after warming up, the pressure rises only slightly and the pressure relief valve does not drip,
  • all radiators heat across their whole surface, including on the top floor,
  • there is no gurgling or rushing noise in the system,
  • joints, valves and the area around the boiler are dry,
  • the filling loop is disconnected and the filling valve closed,
  • the boiler shows no fault and does not fire up unusually often,
  • the heating engineer has told you what pressure to keep and how to top up,
  • after a few days, the pressure is still correct.

Filling is usually the last step of wider heating work, for example after radiator removal and installation, so it is worth doing these checks before the job is signed off.

Frequently asked questions

As a guide, €54.00 per job. Expect to pay more for a large system with several circuits, for underfloor heating, or when the system needs flushing or valves need replacing.